Eric Thatcher

Eric Thatcher Email and Phone Number

Division Vice President of Field Operations @ The Whiting-Turner Contracting Company
California, United States
Eric Thatcher's Location
San Francisco Bay Area, United States, United States
About Eric Thatcher

The views expressed in this post are mine and do not necessarily reflect the view of Whiting-Turner.LOOKING FOR SEASONED SUPERINTENDENTS WITH GREAT STRATEGY SKILLS TO JOIN MY TEAM - NORTHERN AND SOUTHERN CALIFORNIA, OREGON, WASHINGTON, NEVADA, ARIZONA, KANSAS, MISSOURI, NEBRASKA, MINNESOTA, CHICAGO, PENNSYLVANIA, OHIO, AND MARYLAND.I've been in the construction industry since 1986, specializing in large commercial projects in San Francisco and the Bay Area. My experience ranges from high end custom homes to hospitality, high-rise residential, office, healthcare, transportation and bio-tech.Specialties: High-rise Commercial and Residential, Transportation, Hospitality, Healthcare, Biotech, Energy, Office, Higher Ed

Eric Thatcher's Current Company Details
The Whiting-Turner Contracting Company

The Whiting-Turner Contracting Company

View
Division Vice President of Field Operations
California, United States
Employees:
5493
Eric Thatcher Work Experience Details
  • The Whiting-Turner Contracting Company
    The Whiting-Turner Contracting Company
    California, United States
  • The Whiting-Turner Contracting Company
    Division Vice President Of Field Operations
    The Whiting-Turner Contracting Company Dec 2023 - Present
    Towson, Md, Us
  • The Whiting-Turner Contracting Company
    Regional Director Of Field Operations (Norcal, Nv, Or, And Hi)
    The Whiting-Turner Contracting Company Jan 2020 - Dec 2023
    Towson, Md, Us
    Supervising, training and recruiting superintendents for the Northwest Division of The Whiting-Turner Contracting Company
  • The Whiting-Turner Contracting Company
    Senior Superintendent
    The Whiting-Turner Contracting Company Jan 2013 - Jan 2020
    Towson, Md, Us
    Lead SuperintendentProject: Google Bay View CampusLead Superintendent Project: Central Energy Facility at Stanford UniversityAt Stanford University in California, it’s normally the Nobel-winning researchers who make the news. But with the commissioning of a novel renewable energy system, the campus’s humble heating and cooling system has grabbed some headlines
  • The Whiting-Turner Contracting Company
    Superintendent
    The Whiting-Turner Contracting Company Jul 2011 - Jan 2013
    Towson, Md, Us
    Lead SuperintendentProject: Bio/Chem Engineering Building for the School of Engineering at Stanford University210,000 sqft state of the art research facility consisting of dry and wet labs, and over 70 exhausted hoods."Off-the-charts spectacular" is how Drew Endy, assistant professor of bioengineering and a member of the faculty committee overseeing construction, described his department's future home, set to open in 2014
  • Webcor Builders
    Sr. Scheduling Manager
    Webcor Builders Jul 2005 - Aug 2011
    San Francisco, California, Us
    Sr. Scheduling ManagerProject: Transbay Transit CenterA visionary transportation and housing project that will transform downtown San Francisco and our regional transportation system by creating a Grand Central Station of the West and a new transit-friendly neighborhood surrounding the Transit Center.
  • Webcor Builders
    Sr. Superintendent
    Webcor Builders Sep 2007 - Apr 2009
    San Francisco, California, Us
    Project: One Hawthorne 25 storey condominium in San Francisco.Wrote the schedule, planned logistics, buyout, and supervised the project through topping off the structure, prior to moving the the Transbay Transit Center.
  • Webcor Builders
    Sr. Superintendent
    Webcor Builders Sep 2006 - Oct 2007
    San Francisco, California, Us
    Project: Foundry Square Building 1Foundry Square Building 1 consists of a concrete structure with 10 floors of office space, and two levels of subterranean parking. The structure's 11th floor consists of 11,637 sq ft of mechanical space and is topped by an undulating metal roof, supported by structural steel. The project includes a unique double-glass curtainwall and raised access flooring for greater temperature control and energy efficiency. Webcor overcame the challenge of integrating 8 different skin systems to achieve the aesthetic goal of the project while ensuring a watertight final product. The point-supported glass wall and undulating standing seam metal roof are other unique aspects of the building's design. Construction of the concrete foundation system- 2 levels below grade and within the water table- required the mitigation of tidal waters through 24/7 dewatering of the site.To meet the tenant's requirement for large, contiguous spaces, the design was adjusted by using 30' x 30' structural columns to achieve floor-to-floor heights of 14 feet. Building Information Modeling was used to coordinate all MEPS and project was completed ahead of schedule and under budget. Although LEED certification was not sought, the project has many sustainable elements and would likely qualify for a silver or gold rating. Key sustainable building features: High-performance facade controls temperature changes by more than 17.5% over baseline Raised access flooring reduces energy consumption by up to 15% Natural light and views to the exterior from over 90% of interior spaces Non-ozone depleting refrigerant system Use of healthy indoor air quality methods 75% of construction waste diverted from disposal Continuous exchange of fresh air and filtered air during construction
  • Webcor Builders
    Superintendent
    Webcor Builders Jul 2005 - Sep 2006
    San Francisco, California, Us
    Project: Avalon Mission Bay Phase IIAvalon at Mission Bay Phase II consists of a 17-story high-rise residential tower with 174 units and an 8-story mid-rise tower with 139 units. The award-winning project has 4 levels of parking,including one below grade, and 12,000 square feet of retail space. Residential amenities include floor-to-ceiling windows, private balconies, a landscapedcommon area, and a state-of-the-art fitness center with a rock climbing wall and indoor basketball court. Using the latest in form and deck technology, Webcor Concrete established a pour cycle of one-floor-perweek which set the overall project schedule. The aggressive speed and consistent tempo allowed Webcor to deliver the high-rise tower five months ahead of schedule, easily outpacing similar projects in the area. Webcor’s centralized data network and use of PDAs for its quality control and commissioning program also contributed to the project’s timely completion.
  • Herrero Contractors
    Superintendent
    Herrero Contractors May 2003 - Jun 2005
    San Francisco, Ca, Us
    Project: 421 Turk Street8 Story, 49,400 square feetType II, Concrete and SteelWith families moving in in time for Christmas 2004, this new 8-story, 100% affordable multi-family housing project is providing 29 one-, two- and three-bedroom units in addition to program office and services space, a community room and on-site parking. Asian Inc., the project sponsor, selected Herrero to construct the multi-family complex to serve families with special needs.This urban infill project is situated on a very tight site fronting Turk Street near Hyde. An extremely limited staging area as well as high pedestrian and vehicle traffic required close coordination of materials deliveries as well as strict attention to safety.
  • Wentz Group
    Superintendent
    Wentz Group Sep 1990 - May 2001
    Project: Ritz Carlton Half Moon Bay- Five-star 205 room 58 bungalow resort and convention center- Post tension concrete frame- Stone and wood cladding - 286,000 square feet- Two-level 90,000 square foot parking structure

Eric Thatcher Skills

Construction Primavera P6 Concrete Construction Management Value Engineering Suretrack High Rise Construction Safety Pre Construction Process Scheduler Subcontracting Project Estimation Change Orders Constructability Cpm Scheduling Contract Management Project Bidding Leed Ap Contractors Rfi Cost Control Submittals Design Build Leed Tenant Improvement Bim Civil Engineering Residential Homes Mentoring

Frequently Asked Questions about Eric Thatcher

What company does Eric Thatcher work for?

Eric Thatcher works for The Whiting-Turner Contracting Company

What is Eric Thatcher's role at the current company?

Eric Thatcher's current role is Division Vice President of Field Operations.

What is Eric Thatcher's email address?

Eric Thatcher's email address is er****@****ail.com

What is Eric Thatcher's direct phone number?

Eric Thatcher's direct phone number is +165056*****

What skills is Eric Thatcher known for?

Eric Thatcher has skills like Construction, Primavera P6, Concrete, Construction Management, Value Engineering, Suretrack, High Rise, Construction Safety, Pre Construction, Process Scheduler, Subcontracting, Project Estimation.

Who are Eric Thatcher's colleagues?

Eric Thatcher's colleagues are Will Hammond, Travis Hoene, Robert Huffman, Jesus Barragan, Grahm Maurer, Michael Shanahan, Steve Garrett.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.