Erik Smith
AeroLeads people directory · profile

Erik Smith Email & Phone Number

Leadership Training and Development Manager at Sturgeon Electric Company, Inc.
Location: Denver, Colorado, United States 12 work roles 1 school
1 work email found @myrgroup.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email e****@myrgroup.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Leadership Training and Development Manager
Location
Denver, Colorado, United States
Company size

Who is Erik Smith? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Erik Smith is listed as Leadership Training and Development Manager at Sturgeon Electric Company, Inc., a with 1013 employees, based in Denver, Colorado, United States. AeroLeads shows a work email signal at myrgroup.com and a matched LinkedIn profile for Erik Smith.

Erik Smith previously worked as Director of Field Operations at Sturgeon Electric Company, Inc. and Manager of Field Development at Sturgeon Electric Company, Inc.. Erik Smith holds Architectural Studies (Completed 2 Years) from Colorado Mesa University.

Company email context

Email format at Sturgeon Electric Company, Inc.

This section adds company-level context without repeating Erik Smith's masked contact details.

{first_initial}{last}@myrgroup.com
86% confidence

AeroLeads found 1 current-domain work email signal for Erik Smith. Compare company email patterns before reaching out.

Profile bio

About Erik Smith

Experienced Senior Superintendent with a demonstrated history of working in the construction industry. Skilled in Constructability, Contract Management, Process Scheduler, Subcontracting, and Construction Safety.

Listed skills include Construction Management, Construction, Project Estimation, Contract Management, and 11 others.

Current workplace

Erik Smith's current company

Company context helps verify the profile and gives searchers a useful next step.

Sturgeon Electric Company, Inc.
Sturgeon Electric Company, Inc.
Leadership Training and Development Manager
Denver, CO, US
Employees
1013
AeroLeads page
12 roles

Erik Smith work experience

A career timeline built from the work history available for this profile.

Senior Superintendent

Greater Denver Area

Superintendent for all Sturgeon projects at Denver International Airport. Current Projects include:Concourse A West Expansion with Tuner - Flatirons JVConcourse C East Expansion with Holder - FCI JVDIA Service Projects and Air Field Scope.

Sep 2019 - Oct 2021

Senior Superintendent

Greater Denver Area

JP Morgan Chase Green Field Data Center - North Denver Metro Area - $40,000,000 Electrical

Jan 2018 - Aug 2019

Senior Superintendent

Tucson, Arizona Area

University Of Arizona - Banner Heath Hospital Tower Expansion - $45,000,000 Electrical 4 year project that includes a new 800k square-foot, 9 story hospital tower, updating existing supportive infrastructure to the healthcare campus and surrounding neighborhood.

Sep 2015 - Jan 2018

Project Superintendent

St. Anthony'S North Hospital

St. Anthony 144th - $18,400,000 Electrical Project Superintendent for construction of a 350,000 square foot addition to the 60,000 square feet North Medical Pavilion. The project includes a Level III emergency room, an ambulatory surgery center, 92 inpatient beds, an outpatient diagnostics, and treatment center, a women’s health center with labor, delivery, recovery, and postpartum rooms, and clinic space for 54 primary and special-care physicians to incorporate primary care with emergency and specialty care to make patient care more effective and cost efficient. The expansion includes a Level II trauma center.2015 A.G.C. Award for Construction Excellence - Meeting the Challenges of a Difficult ProjectOwner: Centura Health General Contractor: GE Johnson

May 2013 - Jan 2015

Project Superintendent

Castle Rock Adventist Hospital Campus

Castle Rock Adventist Hospital Campus - $10,550,000 Electrical Greenfield construction of new hospital with central utility plant and 4 floor patient tower, with tie ins to an existing emergency clinic. This addition is for a 220,000 square foot, full-service, acute care hospital with inpatient surgery, obstetrics, intensive care, complete support services, and medical/surgical patient services on a 40 acre site. 2013 A.G.C. ACE Bronze Award of Merit Winner Project of the Year (Over $10 Million) SubcontractorOwner: Centura Health General Contractor: GE Johnson

Aug 2011 - Apr 2013

Project Superintendent

Eisenhower Johnson Tunnel

Johnson Bore MCC Replacement - Eisenhower/Johnson Motor Tunnel, CO First CM/GC design-assist project in CDOT history. Scope of work included demolition of four 35-year-old 2400v MCCs, and then procurement and installation of replacement lineups and new PLC system to replace the 30-year-old Relay Logic System. Saved CDOT $1,000,000 by stopping an incorrect Motor Type specification they were about to send out for bid. The diameter of each of the 12 ventilation fans in the Johnson tunnel measures 10 feet 6 inches. Two 2-speed motors, one at 25hp and 200hp, and the other at 100hp and 600hp control each fan, with 65 control conductors originating and terminating between each MCC, master control board, and field control device. This totaled 780 control conductors to order and install. Each MCC lineup consisted of six sections of motor controls, one section for lighting and one section for the incoming line, with each section measuring 8 feet tall, 3 feet wide, and 3 feet deep. Due to size limitations of the electrical rooms, the 24-foot long MCC lineups had to fit precisely onto the existing pad. Installation of the new PLC control system involved extensive tracing of all control systems from the existing MCC, through the relay control cabinet and field control devices on the fan deck, to the traffic control room.2012 A.G.C. Award for Construction Excellence -- Best Building Project (Under $10 Million) – General Contractor

Jun 2011 - Sep 2011

Project Superintendent

St. Anthony'S West Hospital

St. Anthony Hospital, Lakewood - $40,300,000 Electrical This project was a 33-month construction including site development, core and shell, tenant finish, special room build-out, full kitchen with serving stations, and chapel. Systems consisted of fire alarm, lighting control, lightning protection. The nine-story, 671,000 square foot facility has 272 patient rooms, 37 Handicap Accessible Rooms, and 30 Isolation Rooms. The Ortho Colorado Tower has 6 built-out and 3 shelled Operating Rooms. The hospital has 12 built-out and 1 shelled Operating Rooms. The facility houses 26 Imaging Rooms, and 60 intensive care suites. The hospital hosts the only non-profit, Level 1 Trauma Facility in Colorado, with 19 operating room suites including orthopedic and cardiac specialty suites, and Colorado’s only T10 Integrate Trauma Suite. The roof-mounted helicopter pad has high-speed patient access to the emergency and surgery departments.This was the first major hospital to feature aluminum feeder wire throughout the facility. A Sturgeon “value engineering” recommendation.Owner: Centura Health General Contractor: GE Johnson

Apr 2008 - May 2011

General Foreman

Ibm Data Center

Building 003 Data Center, IBM Campus, BoulderTransformation of IBM’s 120,000 square foot Building 003 into a Tier 3 Data Center with 70,000 square feet of raised floor. Power in the building was fed via buss-duct as well as copper conductor in pipe and cable tray. The full system is completely redundant and includes a built-in load bank for future equipment testing.

Oct 2007 - Mar 2008
Team & coworkers

Colleagues at Sturgeon Electric Company, Inc.

Other employees you can reach at sturgeonelectric.com. View company contacts for 1013 employees →

1 education record

Erik Smith education

FAQ

Frequently asked questions about Erik Smith

Quick answers generated from the profile data available on this page.

What company does Erik Smith work for?

Erik Smith works for Sturgeon Electric Company, Inc..

What is Erik Smith's role at Sturgeon Electric Company, Inc.?

Erik Smith is listed as Leadership Training and Development Manager at Sturgeon Electric Company, Inc..

What is Erik Smith's email address?

AeroLeads has found 1 work email signal at @myrgroup.com for Erik Smith at Sturgeon Electric Company, Inc..

Where is Erik Smith based?

Erik Smith is based in Denver, Colorado, United States while working with Sturgeon Electric Company, Inc..

What companies has Erik Smith worked for?

Erik Smith has worked for Sturgeon Electric Company, Inc., Sturgeon Electric, and Sturgeon Electric Co Inc.

Who are Erik Smith's colleagues at Sturgeon Electric Company, Inc.?

Erik Smith's colleagues at Sturgeon Electric Company, Inc. include Pablo Ibarra, Michael Jernigan, Samuel Butts, Kyle Cramer, and Dana Garcia.

How can I contact Erik Smith?

You can use AeroLeads to view verified contact signals for Erik Smith at Sturgeon Electric Company, Inc., including work email, phone, and LinkedIn data when available.

What schools did Erik Smith attend?

Erik Smith holds Architectural Studies (Completed 2 Years) from Colorado Mesa University.

What skills is Erik Smith known for?

Erik Smith is listed with skills including Construction Management, Construction, Project Estimation, Contract Management, Contractors, Change Orders, Contract Negotiation, and Value Engineering.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Erik Smith you were looking for.

View similar profiles