Civil Engineer
As Tecnimont, I took part in the design, delivery and turnkey construction project of a granulation plant in Anwil that will have an average daily capacity of 1,500 tons and can simultaneously produce a wide range of products, primarily nitrogen and sulfur content. I worked as a civil engineer in the construction of the electrical-transformer and compound tank buildings in the refinery. I worked as a field engineer in one department and as a mechanical affairs chief in another department. We… Show more As Tecnimont, I took part in the design, delivery and turnkey construction project of a granulation plant in Anwil that will have an average daily capacity of 1,500 tons and can simultaneously produce a wide range of products, primarily nitrogen and sulfur content. I worked as a civil engineer in the construction of the electrical-transformer and compound tank buildings in the refinery. I worked as a field engineer in one department and as a mechanical affairs chief in another department. We put the reinforced concrete and steel construction building into operation with a living area of 4000 m2 and a total production area of 7000 m2. We carried out the manufacturing and assembly of 6000 meters of infrastructure installation works. We completed the static construction of the building in a short period of 6 months. We used reinforced concrete and precast reinforced concrete elements. We have completed the construction so that a part of the structure will be steel construction.1-Soil Survey Works2-Ground stream bed (we used deep foundations)3-Excavation works4-infrastructure and fire installations5-Road concrete and asphalt works6- Chemical insulation applications inside the building and inside the concrete tank7-Installation of transformer equipment8-Manufacture of foundations of sulfuric acid and nitric acid tanks and installation of tanks9-Interior finishing works10-Electrical infrastructure works11-Installation of heavy mechanical installation to tanks12-Steel construction manufacturing13-Construction of machine foundations14-Convor line manufacturing15-Manufacturing of the rail system discharge area (train station and rails)16-Making wet floor areas Show less