Senior Mining Engineer
Subika Underground, Newmont USA Limited, Kenyasi, Ahafo, Ghana. Mr. Seamons built and evaluated several mine plans in Deswik including, long hole open stoping, long hole stoping with fill, and modified sub level caving. The modified sub level caving was selected as the preferred mining method. Mr. Seamons further detailed and improved the modified sub level caving mine plan in order to push the mine plan through the stage gate process to receive acceptance and funding. The mine plan has been accepted by Newmont and is currently being executed. Mr. Seamons visited the site and worked closely with Newmont employees on site and Newmont employees in the corporate office.Grassy Mountain Underground Project, Paramount Gold, Ontario, Idaho. Mr. Seamons was the lead mining engineer for the feasibility study and assisted on the pre-feasibility study. Mr. Seamons stated reserves for the project. Mr. Seamons created a detailed cut and fill mine design and schedule in the Deswik Software. Mr. Seamons also built the ventilation model, equipment requirements, and labor model for the feasibility study.Igor Underground Project, PPX, Region de La Libertad, Peru. Mr. Seamons was the lead engineer for the pre-feasibility study and Mr. Seamons stated reserves for the project. Mr. Seamons created a detailed cut and fill mine plan, development mine designs, scheduled production, and created the equipment model.Osiris Underground Project, ATAC Resources, Yukon, Canada. Mr. Seamons created a detailed mine plan including a decline ramp, stope designs, scheduled production, equipment requirements, and prepared cash flow for the proposed mine.Gravel Creek Underground Project, Western Exploration, Elko, Nevada. Mr. Seamons provided the preliminary underground mine design, stope optimization, production scheduling, equipment requirements, and cost per ton analysis.