Operation Engineer
Currento Start-up and shut-down procedures for thermal power plant 2*650 MW (Cold, Warm, and Hot Start Up and normal or emergency shut- down). o Turbine & auxiliaries operation (Mitsubishi). And reporting the equipment condition during normal operation. o Boiler & auxiliaries operation (Ansaldo) and reporting the equipment condition during normal operation. o.