Project Engineer
Current-Tuning Chilled Water System, HVAC System, and Clean Room tailored to the unique needs of each facility such as precise temperature control valve and pressure control pump. -Liaising with Panel Builder on the designing of Panel PLC and RIO.-Conducting the installation of Schneider and Siemens hardware in panel PLC/RIO.-Coordinating and involving in testing.