Fortunately, after successfully handed over several projects, I learnt that, the key to have an outstanding project, have a professional team who they monitor and control project progress from initiating to closing. The project would serve to stakeholders in a highly efficient way, if each individual of project team knows about;A. Value Engineering (VE) B. Project Management A. VE analysis is a systematic process of reviewing and assessing a project by a multidisciplinary team not directly involved in the planning and development phases of a specific project. The VE process incorporates the values of design; construction; maintenance; contractor; other stake holders; and the public. The above explanation can be simplified on; Systematic problem solving process Multi-discipline team approach Life-cycle cost oriented Value oriented (Measurement of scope performance/project cost) Function-based analysis Free of normal design restriction A proven management techniqueVE is not;

Farid Ghorbani, P.Eng,Pmp's Current Company Details
EVO-Tech Construction Inc.

Evo-Tech Construction Inc.

An individual with construction expertise is active in Design, Build of residential and Commercial project at GTA
Farid Ghorbani, P.Eng,Pmp Work Experience Details
  • Evo-Tech Construction Inc.
    Technical Support Specialist And Founder
    Evo-Tech Construction Inc. Mar 2012 - Present
    6013 Yonge Street, Toronto, On M2M 3W2 Unit 300B
    EVO-Tech Construction is providing construction and renovation based on the requirements by the clients.Visit our website for more info; www.evotechconstruction.com
  • Frjj Technical Inc.
    Principal Member Of The Technical Staff And Founder
    Frjj Technical Inc. Mar 2012 - Present
    6013 Yonge Street, Toronto, On M2M 3W2 Unite 300B
    An engineering firm with capability to serve all disciplines for any Residential, Commercial and RenovationVisit our website for more info; www.frjjtechnical.com
  • Quantum Dynamics
    Technical Affiars Manager / Partner
    Quantum Dynamics Apr 2017 - Oct 2017
    1795 Shawson Dr Mississauga, On L4W 1T9
    My over 25 years experiences' to design, fabricated and install of sophisticated steel structures for residential, commercial and refineries and owning 12000 sqft fabrication shop with over head cranes and all required machines including in house Structural engineers, designers, crews for fabrication and installation are ready to serve all steel structural and miscellaneous need of your project.
  • Canadian Solar Inc.
    Senior Project Engineer
    Canadian Solar Inc. Feb 2015 - Mar 2017
    545 Speedvale Avenue West, Guelph, On
    Canadian solar is an international solar farm developer, across the globe, with running projects at Ontario-Canada, Japan, Brazil (visit http://www.canadiansolar.com/projects.html for more info) and USA (Recently purchased” Recurrent Energy”, visit http://recurrentenergy.com) .There are several project under feasibility study for other Canadian provinces’, and various countries at 5 continents.I have been appointed to look for integrated project tasks on running and future projects simultaneously. Including;1) Collaborating with development team at “feasibility study” phase to allocate land of interest2) Evaluating of potential EPCs/ Vendors, from technical point of view3) Preparing and sending RFP to EPCs/ Vendors 4) Evaluating replied RFPs5) Assisting procurement to Negotiation and award projects, locally and internationally, to EPC6) Monitoring and controlling technically and contractually EPCs for project progress 7) Reviewing request for change, negotiate/ approve or reject them8) Issuing change orders as per available contingency 9) Closing of project., including internal testing and commissioning, connecting to transmission lines and approval from local authority for handing over10) Obtaining operation & maintenance procedure, which will be used by company O & M team during project life time (20 to 25 years)11) Publishing project booklet for completed project, where has an offer to purchase At this short period, by stablishing review procedure for engineering deliverable, several faulty design and not coordinated drawings were found and returned for modification. These were resulted to avoid duplicated work at construction phase, that will resulted to delay on connecting to grid, or in other word electricity production will be delayed. To better understand solar farm project see the following video
  • Unistrut Construction
    Project Manager
    Unistrut Construction Aug 2014 - Jan 2015
    Www.Unistrutconstruction.Com
    Unistrust is original and international metal framing system featuring a unique weld less connection since 1914. This system evolved from a simple connection concept to a comprehensive engineered system for the medical support, fall arrest system, grating, solar system and roof walk ways. Project 1: Saint Justine Hospital, Montreal, Quebec (www.chusj.org). Main contractor SNC LAVALIN construction and committed of LEED “Silver” Certified. There are 441 medical supports.Firstly reviewed the available estimation and reduced the original quote by 10%, which resulted the award of subcontract. Second achievement, suggested to redesign and utilizing lighter medical support framing which consequently reduce in material cost by 25% as well as saved installation time by 75%. Project 2: Humber River Hospital, Toronto, Ontario (www.hrrh.on.ca). Main contractor is PCL. This project was started since 2013 for Unistrut scope of work and it has 535 medical supports.Appointed to review project status to find out root case of delays and evaluate the impact of change orders, working on resubmitting shop drawings, preparing recovery schedule and replying pending change orders.
  • Tetra Tech
    Senior Structural Engineer
    Tetra Tech Sep 2013 - Jul 2014
    Toronto, Ontario
    Tetra Tech is a leading provider of provider of consulting, engineering, program management, construction management and technical services worldwide.Ontario Power Generation (OPG): Retube Waste Storage Building (RWSB) at Darlington Hydro one Refurbishment: i) Power distribution substations at Longlac DS,Barwick DS, CrowRiver DS ii) Transformer stations located at Scarborogh TS, Bramele TS, Toronto Finch TS and Richview TSSiemens project at Alberta: 4 HVDC 500 kV for Altalink and ATCO located at Alberta (each one 950 Million Dollars) Atomic Energy of Canada (AECL): Emergency Power supply upgrade for Building 420 at Chalk River of AECL Transmission Line: Nextra Transmission line for blue water line (Southern Ontario)Managing 2 junior engineers and 7 designers for simultaneously running 5 projects for period of 12 weeks to accomplish delivery of all drawings on time and quality, also I am responsible for o Preparing Proposals for other client’s i.e. Hydro one, Newfoundland Power Inc.o Studying the issued RFIs from site and reply technically/ contractually to them for Nextra Transmission Line as construction support
  • Amec
    Senior Structural Engineer
    Amec Jan 2013 - Aug 2013
    Calgary, Alberta
    AMEC is a focused supplier of consultancy, engineering and project management services to its customers in the world’s oil and gas, and mining, clean energy, environment and infrastructure markets. Project: Sunshine Oil Sands, SAGD, Fort McMurray, Alberta (485 Million Dollars - phase 1) Hired to monitor an internal project structural team of 4 engineers and 6 designers to withdraw uncompleted design of structural elements from sub-consultant that were 6 weeks behind schedule. Accomplishments were included:o Completed all structural drawing on time, quality and budget within 11 weeks and delivered to site crew to avoid any delay in project handing over o Achieved acceptance quality according to AMEC quality plano Visited site at Fort McMurray once every two weeks and Inspected 2 fabrication yards at resulted to due to tight schedule of project handing over and resulted in construction completed 2 weeks ahead o Controlled MTOs for designed structures/ piles/ concrete and masonry works resulted procurement of project were on time with minimum wastageo Reviewed 3D model to predict clashes resulted to avoid reworking at site after delivery of fabricated pipe racks or pipe supporto Completed as-built drawings for phase 1 on time and on budget and delivered to client and resulted the phase 2 of project were awarded to AMEC
  • Snc-Lavalin
    Senior Structural Engineer
    Snc-Lavalin Jun 2012 - Jan 2013
    Calgary, Alberta
    Project : Oil Sands, CNRL, Froth treatment plant, Fort McMurray, Alberta (650 Million Dollars)This was an EPCM project and I was seconded to Calgary to speed up delivery of design drawings to contractors’. The area of work was Zone “C” which was included a building made of steel structure where were supported by concrete piles and steel platform for electrical panels for electrical building and a 3 storey pipe rack to hold all cable tray for in and out power cables.My accomplishment was based on implementing interactive discussion via Skype between Calgary where engineers and checkers were sitting and Mumbai where 20 designers were working. This procedure was helped to avoid re-working due to not understanding of mark up drawings and answer the designer doubt about engineers or checkers comments.In addition, by utilizing Tekla software to check the prepared shop drawing by steel fabricator located at Texas-U.S, resulted to delivery all pre-assembled pipe racks resulted in on time delivery, including their pipes without any need of modification or additional site work at project location (Fort McMurray).
  • Snc-Lavalin
    Structural Engineer
    Snc-Lavalin Apr 2010 - May 2012
    Sarnia, Ontario
    Main Project:BioAmber Succinic Acid plant, Sarnia, Ontario (300 Million Dollars)This was an EPC project and I had coach a team of 3 junior engineers and 4 designers and reported to department manager. I was prepared conceptual drawing for mat foundations, steel structures, material take off of steel, concrete, excavation and rebar’s including technical specifications for 4 parts of projects on less than 18 weeks which could help to procurement department to prepare bid document and ask contractors to participate to the bid. Moreover, these drawings were submitted on time to the City to start their procedure of issuing building permits and correct estimation of the fees while staying within budget.Integrating Projects: Rehabilitation and new extension at existing Imperial oil facility, Sarnia, OntarioI had edited existing check lists and proposed new comprehensive check lists resulted in correct site assessment of existing condition which was helped to prepare detailed drawing for new extensions/modifications or prepare a structural strength/ weakness report of existing element(s).
  • Grey Tower Construction
    Construction Manager
    Grey Tower Construction Aug 2005 - Nov 2009
    Canadian Based Company, Dubai Office
    This was a mid. Size company focusing on contracting project, which was not attracting the share holders to invest on it. Therefore, by proposing design-build idea, company could win about 20 numbers bid which was worth about $50M of turn-key industrial/ institutional projects in less than five years. I was directing our multidisciplinary engineering team of 6 engineers, 7 draftspersons, and 3 estimators.My responsibilities were included:1) Participate on requested bids, prepare the whole package with the cost and schedule to get award 2) Upon of award of project prepare the design package with our engineering team to get building permit 3) Monitor and Control project execution for quality, progress and budget. Including change managements for requested change order from clients or supplier/sub trades. Shareholders, invested for company to buy a 5000 sqft office and a 35000 sqft yard with a covered area of 15000 sqft for fabrication of steel structure, also they invested a lot to purchase 3 Pick-up, new construction equipments, office furniture and engineering, estimation and accounting software.Furthermore, net profit increased from nil on 2004 prior to my hiring date to $5.4M on 2009.
  • Techno Steel Construction, Dubai, Uae, Www.Technosteel-Uae.Com
    Projects Manager
    Techno Steel Construction, Dubai, Uae, Www.Technosteel-Uae.Com Jan 2000 - May 2005
    Dubai, United Arab Emirates (Iso 9001 Registered From Dnv-Uk)
    This design-build company which was established on 1993 and it was having their own engineering office, steel fabrication yard, covered storage, concrete framing team, team of masons to do all finishing works, and several pickups, trailers and cranes to handle project efficiently, on fast past and on lower budget which were make it un bitable. Company had 250 staff under its payroll at my hiring and increased to 500.I proposed to management to obtain an ISO certificate, which would make us eligible to participate on high qualified bid. I was assigned to follow and establish ISO system; therefore with help of an expert, we could prepare organization chart for whole company and introduce the job description for each person, train the staff, engineers and crew to follow the system properly. We issued several check lists and a quality control department to avoid reworking and have the best result from each departments.As matter of fact; Company obtained ISO 9002 and it resulted to win more bids and turnover increased from $4.6M on 2002 to $18M on 2005.
  • Zambagh Consultancy Office,
    Senior Structural Engineer
    Zambagh Consultancy Office, Mar 1998 - Dec 1999
    Istanbul, Turkey
    This engineering firm traditionally designs concrete structures for various types of projects, I delivered ideas for bolted steel structure which was fabricated and imported from Iran (Lower cost than local steel structures) and install at Turkey. This attracts several industrial clients in Istanbul and Izmir free zone for the factories production warehouse which resulted in, a 40% reduction in project duration.
  • Design Office Of Unesco (United Nation) And Ministry Of Health
    Structural Engineer
    Design Office Of Unesco (United Nation) And Ministry Of Health Mar 1996 - Feb 1998
    Karaj, Iran
    There was an approved budget from UNESCO to renovate an existing extension of Vaccine production plant where it was damaged. I performed vulnerability assessment of an existing 2 storey steel structure and prepared rehabilitation design respectively, to construct a 3 storey building where, the 3rd floor was the place to accommodate all electrical/mechanical equipments and at ground floor there were 3 isolated rooms for vaccine productions located.By performing very detail analysis, I reuse the whole 6000 sqm building without demolishing the existing foundations, and just by strengthening exiting foundations, columns, beams and their connection and with the help of composite system the new building was blast proof and stable against the announced highest earthquake. This is resulted in saving of 35% of construction budget and it was utilized to construct a new lab
  • Architect Sahfee- Engineering Firm
    Structural Engineer
    Architect Sahfee- Engineering Firm May 1994 - Feb 1996
    Tehran- Iran
    This was a resort at Caspian Sea with 168 suites. Built in a wing shape where the middle block was a 5 storey building to locate restaurant at 5th floor with two connected 4 storey building at both sides. I was assigned to design the structure and due to limited access to the site, I proposed a cast-in-place concrete structure and flat slabs which was the best system at a high risk of seismic zone and roof could be casted in slope which by waterproofing of roof and using clay tile as a decorative elements, Architect could keep the traditional elevation for this resort and it became a part of that exiting small and old community.
  • Suliran Corporation (Under License Of American Soule-U.S.A)
    Junior Structural Engineer
    Suliran Corporation (Under License Of American Soule-U.S.A) May 1990 - Apr 1994
    Tehran, Iran
    This was a Pre-Engineered steel manufacturing company under the license of American Soule with capacity of 2000 ton per month, ordered by various clients for their light to very heavy industrial projects I as part of design team of company was responsible for ;o Detail design of steel structure with built-up sections and required welding details o Detail design of bolted connection and , of built-up crane run way beam, brackets o Check cold formed section i.e. purlins, girts and end-post column By a team work of 3 senior designers, 10 draftspersons, 2 other engineer and our engineering manager who was a PHD in structural design from MIT, we change the drafting system from hand drawing to AutoCAD system and this was an excellent experience of teamwork and improving AutoCAD still of mine.In addition, by purchasing new software the structural calculation could be fast and more accurate, and then our company was able to approach international market of Saudi Arabia, U.A.E, Qatar and Kuwait.

Farid Ghorbani, P.Eng,Pmp Skills

Project Planning Staad Sap2000 Civil Engineering Primavera P6 Cad Prokon S Frame Foundation Design Etabs Steel Structures Construction Management Steel Detailing Revit Autocad Reinforced Concrete Ms Project Bridge Steel Construction Engineering Structural Engineering Concrete Contract Management High Rise Project Management Project Control Feasibility Studies Deep Foundations Epc Project Estimation Steel Design Project Engineering Engineering Design Structural Analysis Petrochemical Retaining Walls Drainage Structural Engineers Process Scheduler Construction Safety Highways Road Metal Fabrication Seismic Design Piping Microstation Earthworks Geotechnical Engineering Structures

Farid Ghorbani, P.Eng,Pmp Education Details

Frequently Asked Questions about Farid Ghorbani, P.Eng,Pmp

What company does Farid Ghorbani, P.Eng,Pmp work for?

Farid Ghorbani, P.Eng,Pmp works for Evo-Tech Construction Inc.

What is Farid Ghorbani, P.Eng,Pmp's role at the current company?

Farid Ghorbani, P.Eng,Pmp's current role is An individual with construction expertise is active in Design, Build of residential and Commercial project at GTA.

What is Farid Ghorbani, P.Eng,Pmp's email address?

Farid Ghorbani, P.Eng,Pmp's email address is af****@****ahoo.ca

What schools did Farid Ghorbani, P.Eng,Pmp attend?

Farid Ghorbani, P.Eng,Pmp attended Ryerson University, Humber College, Seneca Polytechnic, George Brown College, Islamic Azad University.

What are some of Farid Ghorbani, P.Eng,Pmp's interests?

Farid Ghorbani, P.Eng,Pmp has interest in Travelling By Road Across Country, Documentary And New Released Movie, Home Renovation By Myself.

What skills is Farid Ghorbani, P.Eng,Pmp known for?

Farid Ghorbani, P.Eng,Pmp has skills like Project Planning, Staad, Sap2000, Civil Engineering, Primavera P6, Cad, Prokon, S Frame, Foundation Design, Etabs, Steel Structures, Construction Management.

Not the Farid Ghorbani, P.Eng,Pmp you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.