Faseeh Ud Din Email and Phone Number
As a Business Development and Project Manager with over 9 years of professional experience, I have developed a reputation for being dedicated, detail-oriented, and capable. My expertise spans across multiple domains, including EPC, electrical installation, testing and commissioning, and contract management and negotiation. I have a proven track record of successfully managing power plants and substations, and I'm eager to bring my skills to new challenges.
-
Managing DirectorE-Strategic Engineering Technologies Pvt. Ltd.Karachi, Pk -
Managing PartnerE-Strategic Engineering Technologies Pvt. Ltd. Aug 2023 - PresentPakistan
-
Senior ConsultantArzachel Pvt. Ltd. Aug 2023 - Oct 2024Karachi Division, Sindh, Pakistan -
Business And Project Development ManagerSumec Energy Holdings Co., Ltd. Feb 2020 - Sep 2023Pakistan• Built new relations with Lucky Cement Limited to have business with them• Worked with Lucky Cement for their 52MW hybrid (Solar+Wind) Captive Power Plant to be installed• Provided technical support to tendering department for new projects biddings and meeting with client for Job Explanation meetings, Site Visits and Pre/Post bid clarifications.• Proposal review & submission for 50MW Hybrid Project which includes Electrical & Civil drawings for client’s review and approval as per agreed system• Prepared different combinations of wind and solar to have best LCOE for Hybrid project• Working with different investors in Pakistan as well abroad to develop new business which includes 600MW Solar under G2G scheme.• Working with different clients who intend to develop renewable project in Pakistan including IPP and Captive power plants like Amreli Steel Mills 80MW Hybrid Plant, K.E 200MW Hybrid plant in Gharo, 40MW RE solar in Dadu, 5MW Solar Rooftop project in Islamabad.• Attending NEPRA’s meeting to have understanding of upcoming projects in Pakistan -
Site ManagerSumec Energy Holdings Co., Ltd. Jan 2019 - Jan 2022Karachi• Worked at Zephyr project with EPC Contractor SUMEC as an Assistant Site Manager and handed all SUMEC’s responsibilities to complete this project in its last phases from commissioning time to COD and then TOC, controlled all types of documentations and handed over this project to Owner till the end of WP O&M Contract.• Closed all outstanding works and proceeded for commissioning of WTGs.• Compilation and Reviewing of Documents of whole project including Testing Protocols, Test reports, FAT reports, IFCs, As built drawings, OEM Manuals and SOPs to be handed over to Owner.• Coordination with IE, OE and Subcontractors to have smooth testing and timely RITs signing.• Coordination with NTDC to have smooth operations during energization of plant and during O&M phase.• Coordination with K.E and NTDC to have smooth shifting of network from NTDC to K.E• Closed Punch List/Snag List points within given time period of 90 days after TOC• Coordination with Logistics to cope up with additional spare parts and replenishment of spares being used during warranty period.• Dealings with Owner (ZPL) and all SUMEC’s Subcontractors to complete all outstanding jobs to have completion in time.• Coordination with client to clear all pending payments in a timely manner• Worked as O&M lead from SUMEC to cover all Warranty and Maintenance related works in 2 years of WP O&M Contract. -
Site ManagerZain Engineering Company (Zec) Pvt. Ltd. May 2018 - Jan 2019Karāchi, Sindh, Pakistan• Project Management, Engineering & construction driven execution of 132kv GIS substation.• Monitor and control projects contract activities and report the job status periodically to management on critical issues with solutions.• Ensure that contract procedures are followed during implementation of projects. • Finalize the project reconciliation and variation orders in line with provisions of contract. • Ensure procurement of all substation equipment/materials by giving technical support to procurement dept. as per scope of works and project requirement to issue PO.• Design review & submission of Substation Primary & secondary, Electro-Mechanical & Civil drawings for client’s review and approval as per agreed schedule.• Ensure to arrange coordination & design review meetings with Client & vendors to expedite review progress and the resolution of any technical/contractual issues. • Ensure all materials are delivered to the construction site in compliance with the contract requirements and the approved drawings from client.• Control, review and approve issued invoices and ensure releasing of payments to subcontractors/vendors as per the project's progress and contractual payment terms.• Ensure to provide all required technical support to construction site staff for the installation/erection of equipment by providing approved drawing s & layouts.• Ensure systems are tested in accordance with specifications and approved inspections and test plans by providing testing & commissioning team all necessary support.• Plan all actions & follow up of quality of execution, contracts deliveries, customer inspections & invoicing with client to maintain cash flow. Well capable to withstand high pressure during project execution in order to achieve targets within the stipulated time as per schedule.• Ensure to provide all necessary technical support and materials required for clearance of Pre/Post energization punch list and closing out of the substations.
-
Site ManagerZain Engineering Company (Zec) Pvt. Ltd. Aug 2017 - Apr 2018Karāchi, Sindh, PakistanWorked as a Site Manager at SEPCO III Port Qasim coal fired 1320MW power plant for Erection of Lighting poles, Distribution Boards, cable laying and conduit work & 132 KV K Electric/ Siemens Grid stations at Landhi & KEPZ, RECP for Extension program Under TP-1000 projects which includes Supervision of:• 40MVA Power Transformer Installation, Testing and commissioning.• Complete Earthing work.• Control and power Cable laying.• 132KV Equipment installation (Wall Bushing, Surge arrestors, Current transformers, Circuit breakers and Disconnector switches).• Capacitor banks Installation testing.• Bus-bar installation.• 11KV switch gear installation, testing and commissioning.• Control panels installation.• Scada/RTU Panels installation.
-
Site ManagerZain Engineering Company (Zec) Pvt. Ltd. Jul 2017 - Aug 2017Karāchi, Sindh, Pakistan• Erection of 250 MVA CHINT Auto-Transformer along with oil filling and dehydration at Pipri Grid. • Erection of 250 MVA Siemens Power Transformer along with Oil filling and circulation at KAPCO.
-
Project LeadZain Engineering Company (Zec) Pvt. Ltd. Mar 2017 - Jul 2017Multan, Punjab, Pakistan• As a Project Lead at Coca-Cola Beverages Green-Field Project Multan for cable Laying, cable trays installation, MV/LV Panels installation, UPS installation, Transformer installation, Cables termination and Earthing pits installation.• Planned and designed the cable system, including determining the routing, selecting the equipment and materials, and preparing specifications and drawings.• Managed the installation of the cable system, ensuring that the work is completed on time, within budget, and to the required quality standards.• Managed the project budget, and for ensuring that costs are controlled throughout the installation process.• Ensured that the installation of the cable system complies with all relevant safety regulations and standards.• Selected and procured the equipment and materials required for the installation of the cable system.• Commissioned of the cable system, including testing and start-up activities, and ensuring that the system meets performance and reliability requirements.
-
Project EngineerZain Engineering Company (Zec) Pvt. Ltd. Feb 2017 - Mar 2017Karāchi, Sindh, Pakistan• Worked as a Project Engineer at Gul Ahmad Energy Limited for 12 days Shutdown of Power plant.• Planning and preparing the shutdown of the plant, including identifying maintenance and repair work that needs to be carried out and coordinating the activities of different departments.• Ensuring that the shutdown, maintenance, and restart of the plant comply with all relevant safety regulations and standards.• Scheduling the shutdown, maintenance, and restart activities, and ensuring that the work is completed on time and within budget.
-
Project EngineerZain Engineering Company (Zec) Pvt. Ltd. Jul 2016 - Feb 2017Karāchi, Sindh, Pakistan• As a Project Engineer at SEPCO III Port Qasim coal fired power plant for Cable Laying and conduit installation work.• Responsible for managing the design, construction, commissioning, and maintenance of coal-fired power plants, ensuring that projects are completed on time, within budget, and to the required quality standards.• Involved in the technical design of the power plant, including the selection of equipment, systems, and materials, as well as the preparation of specifications and drawings.• Preparing and managing the project budget, and for ensuring that costs are controlled throughout the project.• Managing and coordinating with vendors and contractors to ensure that their work meets the project requirements.• Ensuring that the construction and operation of the power plant comply with all relevant safety regulations and standards.• Commissioning of the power plant, including testing and start-up activities, and ensuring that the plant meets performance and reliability requirements.• Developing and implementing a maintenance program for the power plant, and for ensuring that the plant is maintained in good condition and operating efficiently.
-
Business Development OfficerZain Engineering Company (Zec) Pvt. Ltd. Nov 2015 - Jul 2016Karachi• Identifying new business opportunities: This involves researching and analyzing market trends, identifying new customer segments, and identifying new revenue streams.• Networking: Building and maintaining relationships with clients, partners, and stakeholders is a crucial part of the role. This helps to create new business opportunities and to secure existing ones.• Sales and Marketing: Business Development Managers are responsible for promoting the company's products and services and working with the sales team to close deals.• Strategic Planning: Business Development Managers are involved in developing and implementing business strategies to achieve company goals and objectives.• Negotiating Contracts: Business Development Managers play a key role in negotiating contracts and agreements with clients and partners.• Market Research: Business Development Managers are responsible for conducting market research to gather information about the market, competitors, and customers.• Team Management: Business Development Managers may lead and manage teams of sales and marketing professionals, providing guidance and direction to achieve business goals.
Faseeh Ud Din Education Details
-
Electrical And Electronics Engineering
Frequently Asked Questions about Faseeh Ud Din
What company does Faseeh Ud Din work for?
Faseeh Ud Din works for E-Strategic Engineering Technologies Pvt. Ltd.
What is Faseeh Ud Din's role at the current company?
Faseeh Ud Din's current role is Managing Director.
What schools did Faseeh Ud Din attend?
Faseeh Ud Din attended University Of Engineering And Technology, Taxila.
Not the Faseeh Ud Din you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial