Structural Engineer
CurrentProject 1: Review Design Kuala Tanjung-Indera Pura TOL Road-Coordinator project for Consultant.-Analyze and Design for 4 Box Underpass and a Box Culvert.Project 2: Heavy Shoring Pier Head P-25 Jogja-Bawen TOL Road-Coordinator project for consultant.-Analyze and Design Shoring for Pier Head including lifting method.-Pier Head properties: Length 56 m, height 5 m, crossing the river.-Main Beam formwork using build up section by 3 combined steel beam that have total height 3.6 m.-Assisted by coworkers. Mentored by Senior Engineer (Pak Ebang).Project 3: Design and Build Quaywall and Revetment Dumping 2 Benoa Harbour-Quaywall used SPSP 1016 mm for retaining wall, connected by slab to 3 rows anchor. An anchor used 2 CSP 600 Class B. Distance between anchor is 6m.-Working method use half slab precast with dimension 5.4 x 7.5 m.-Structure Engineer on site project.-Analyze and solved problem that happened on site.-Propose approval design, drawing, problem analysis to Construction Management Consultant.-Help for calculation and analysis about working method.