Current- Developed a comprehensive methodology for determining the Facility Ratings Baseline process in compliance with NERC FAC-008-5 standards. Worked closely with Engineering and Construction, Transmission Asset Planning.
- Led the… Show more
- Led the implementation of the Facility Ratings Baseline process for each facility ensuring that all equipment was identified, measured, and compared to drawings/diagrams/specifications and Facility Equipment Lists.
- Examined and assessed 72 sites flagged for Transmission Line Clearance discrepancies, prioritizing two key areas: Safety and NERC compliance to mitigate potential financial penalties. Reviewed data pertaining to sites.