AeroLeads people directory · profile

George A. Hudspeth Email & Phone Number

Los Alamos National Laboratory at Longenecker & Associates
Location: United States 15 work roles 3 schools
1 work email found @xcelenergy.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email g****@xcelenergy.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Los Alamos National Laboratory
Location
United States

Who is George A. Hudspeth? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

George A. Hudspeth is listed as Los Alamos National Laboratory at Longenecker & Associates, based in United States. AeroLeads shows a work email signal at xcelenergy.com and a matched LinkedIn profile for George A. Hudspeth.

George A. Hudspeth previously worked as Field Engineer III at Longenecker & Associates and Electrical Inspector at Leeward Renewable Energy, Llc. George A. Hudspeth studied at The University Of Memphis.

Company email context

Email format at Longenecker & Associates

This section adds company-level context without repeating George A. Hudspeth's masked contact details.

ghudspeth@xcelenergy.com
76% confidence

AeroLeads found 1 current-domain work email signal for George A. Hudspeth. Compare company email patterns before reaching out.

Profile bio

About George A. Hudspeth

Over 41 forty one yrs. of progressive experience in the Utility Power Industry;........Electrical Field Engr. Start-Up Test & Commissioning, Capital Projects, QA/QC, Owner's rep/Site rep, Operations, Construction/Maintenance.Fields of Expertise; Coal Fired, Gas Fired both (combined/simple cycles), Nuclear, Wind , Solar, Steam Turbines, Hydro Plants, Research & Development.

Listed skills include Power Plants, Commissioning, Electricians, Power Generation, and 42 others.

Current workplace

George A. Hudspeth's current company

Company context helps verify the profile and gives searchers a useful next step.

Longenecker & Associates
Longenecker & Associates
Los Alamos National Laboratory
AeroLeads page
15 roles

George A. Hudspeth work experience

A career timeline built from the work history available for this profile.

Qa/Qc Regional Manager, Colorado

Minneapolis, Minnesota, Us

Oversee QA/QC activities within the Colorado region for Xcel Energy

Jul 2019 - Jul 2021

Sr Electrical Field Engineer / Qaqc

Minneapolis, Minnesota, Us

Install and Commission various systems and components for upgrades/replacements on (8) eight different power plant facilities through the panhandle of west, TX and eastern, NM. Gas fired combined/simple cycles, and (5) Coal fired Units. Also Hale County Wind Farm. QA/QC (inspections, reports,...Turnover Packages to the client Xcel).

Apr 2013 - Jun 2019

Sr Lead Electrical Engineer (Owner'S Rep) (Start-Up)

Juno Beach, Fl, Us

Start-UP Testing & Commissioning / A combined 250-megawatt solar energy power generating station facility located on the edge of the Mohave Desert.This facility is serial #2 ,..................#1 is located in Spain.

Sep 2012 - Mar 2013

Sr.Lead Electrical Engineer/Sandridge Century Plant (Owner'S Rep) (Start-Up)

Oklahoma City, Ok, Us

Units 1 & 2 Hydrocarbon gas processing plant facility. Century plant is the largest single industrial source CO2 capture facility in North America. Capacity of up to 8.4 Mt/yr however only 5 Mt/yr is being used. The plant also produces Methane gas for market.

Nov 2011 - Aug 2012

Lead Electrical Engineer (Start-Up & Testing)

Tempe, Az, Us

Added new environmental upgrades & controls to the projects at the Salt River Project’s Coronado Generating Station (773 MW coal fired units) to reduce emissions of sulfur dioxide, nitrogen oxide and mercury.

Jul 2011 - Nov 2011

Sr Lead Electrical Engineer (Site Rep) (Outage)

Portland, Oregon, Us

Field Engineering oversee Outage/Overhaul; U-3 GE Exciter EX2100 installation/Start-Up,7.2KV Switchgear,480V Loadcenters, and MCC pm’s.Generator Stator bar rewind,VFD replacements, GSU, and Start-Up Xfmr’s, Iso Phase,and all Protective Relay upgrades,while (mentoring) new direct PacifiCorp (EE) Electrical Engineer.

Mar 2011 - Jul 2011

Systems Completion Mgr (Start-Up)

Akron, Oh, Us

Completion of a combined cycle (2 on 1) 501F natural gas-fired turbines power plant for FirstEnergy. The plant includes two natural gas turbines and a steam turbine capable of producing 544 MW of load-following capacity and 163 MW of peaking capacity.

Mar 2010 - Nov 2010

Lead Electrical Test Tech S/U Test & Commissioning

Minneapolis, Minnesota, Us

Start-UP Test & Commissioning Units 5 & 6 (GE Frame 7) simple cycle combustion turbines.

Apr 2009 - Jul 2009

Lead Electrical Engineer (Owner'S Rep) (Capital Projects)

Las Vegas, Nv, Us

Assigned to Capital Projects overseeing (4) four coal fired units. Natural Gas Igniters, Baghouses, DCS, and CEMS.

Dec 2006 - Apr 2009

Systems Completion Manager (Start-Up) Site Rep

Des Moines, Iowa, Us

Liason between Construction & Start-Up Test/Commissioning all Systems throughout Unit-4 / 790 MW supercritical coal fired power plant.

Sep 2005 - Dec 2006

Lead Electrical Engineer Start -Up Test Commissioning (Site Rep)

Burbank Water And Power

The Southern California Public Power Authority’s 310 MW combined cycle, natural gas fueled, and water treatment facility zero limit discharge. Magnolia Power Project won Power Magazine Project of the Year award in September 2005 in downtown Burbank, Ca.

Apr 2004 - Sep 2005

Lead Qa/Qc Inspector (I & E) Start-Up Test Commissioning (Site Rep)

Minneapolis, Minnesota, Us

Chanarambie Wind (65 Tower's) 1.5 MW Series Wind Turbines, Murry Co. MNMoriane Wind (34 Tower's) 1.5 MW Series Wind Turbines, Buffalo Ridge, MN

Sep 2003 - Feb 2004
3 education records

George A. Hudspeth education

Education record

The University Of Memphis

Education record

Northwest Mississippi Community College

Education record

Neta National Electrical Testing Association
FAQ

Frequently asked questions about George A. Hudspeth

Quick answers generated from the profile data available on this page.

What company does George A. Hudspeth work for?

George A. Hudspeth works for Longenecker & Associates.

What is George A. Hudspeth's role at Longenecker & Associates?

George A. Hudspeth is listed as Los Alamos National Laboratory at Longenecker & Associates.

What is George A. Hudspeth's email address?

AeroLeads has found 1 work email signal at @xcelenergy.com for George A. Hudspeth at Longenecker & Associates.

Where is George A. Hudspeth based?

George A. Hudspeth is based in United States while working with Longenecker & Associates.

What companies has George A. Hudspeth worked for?

George A. Hudspeth has worked for Longenecker & Associates, Leeward Renewable Energy, Llc, Xcel Energy, Nextera Energy Resources, and Sandridge Energy.

How can I contact George A. Hudspeth?

You can use AeroLeads to view verified contact signals for George A. Hudspeth at Longenecker & Associates, including work email, phone, and LinkedIn data when available.

What schools did George A. Hudspeth attend?

George A. Hudspeth studied at The University Of Memphis.

What skills is George A. Hudspeth known for?

George A. Hudspeth is listed with skills including Power Plants, Commissioning, Electricians, Power Generation, Energy, Engineering, Electricity, and Turbines.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.