George Carter Email and Phone Number
George Carter work email
- Valid
- Valid
George Carter personal email
- Valid
George Carter is a Director Of Infrastructure - College of Engineering and Applied Science at University of Colorado Boulder. He possess expertise in construction, building materials, construction management, value engineering, contractors and 8 more skills. He is proficient in English.
University Of Colorado Boulder
View-
Director Of Infrastructure - College Of Engineering And Applied ScienceUniversity Of Colorado BoulderLafayette, Co, Us -
Director Of Infrastructure - College Of Engineering & Applied ScienceUniversity Of Colorado Boulder Dec 2020 - PresentBoulder, Colorado, United States -
Facilities ManagementUniversity Of Colorado Boulder Jul 2016 - Jul 2021Boulder, Co -
Waterproofing Division ManagerBlack Roofing, Inc. Jul 2013 - Dec 2015Boulder, CoNotable Projects with Black Roofing:Denver International Airport – Westin Hotel & Public Transit Center - Denver, COContract Amount - $3,000,000Major expansion to the Jeppesen Terminal including a 12-story hotel over a 5-story transit center. Scope of work included 150,000 square feet of a hot fluid-applied waterproofing assembly. Project was recipient of the 2015 Project of the Year Award by the Colorado Roofing Association. Monroe Street Apartment Tower - Denver, COContract Amount - $900,000Construction of a new 8-story luxury apartment tower in Denver’s Cherry Creek area. Project included self-adhering sheet waterproofing at below grade parking level, traffic coating at unit balconies, air barrier, interior/exterior expansion joint assemblies and hot fluid-applied waterproofing at level 8 amenity deck. -
Regional ManagerL.S. Decker, Inc. Jan 2003 - Jun 2013Dallas/Fort Worth AreaNotable Projects with L.S. Decker:Kimbell Art Museum Expansion - Fort Worth, TXContract Amount - $4,400,000Major expansion to existing museum facility including an underground garage, three gallery buildings and an operations tunnel connecting the existing museum. Project featured a 90,000 square foot garden roof area comprised of 11,000 cubic yards of lightweight soil and 1,800,000 board feet of rigid fill insulation. Expansion joint cover assemblies, both below grade and above grade, were abundant on the project.Cotton Bowl Restoration - Dallas, TXProject Value - $3,200,000Restoration of the historic Cotton Bowl Stadium in southeast Dallas. Project involved extensive concrete repairs within the stadium structure and seating bowl. A new cementitious coating was applied to the entire on-grade lower bowl and a polyurethane traffic coating was applied to the elevated seating decks. Over 1,000 cubic feet of concrete repairs, 200,000 square feet of deck coating and 2,400 linear feet of expansion joint covers were applied in a period of nine (9) months so stadium would be ready for college football bowl season. North Lake College – Waterproofing and Roofing Renovation - Irving, TXProject Value - $2,245,000Due to poor waterproofing installation and design by others during the original construction, numerous leaks in the brick façade created a huge problem. The project involved the removal of a large portion of the brick façade of three buildings, waterproofing replacement at the backup walls and replacement of the brick. Work also included removal and replacement of significant areas of topping slab concrete along with the waterproofing membrane below at plazas and exterior monument stairs.
-
Asst. Project ManagerD.E. Harvey Builders 1997 - 2002Houston, Texas AreaNotable Projects with Harvey Builders:Dallas FBI Field Office - Dallas, TX Project value – $25,000,000Construction of a 5-story, 180,000 square foot structural steel office building, including complete tenant build-out, with a 4-level, 178,000 square foot parking garage. Project involved close coordination with FBI and GSA representatives throughout construction leading to an on-schedule project delivery.Federal Justice Center - El Paso, TXProject Value - $11,000,000Construction of a 3-story tilt-up concrete panel office building occupied by the Federal Bureau of Investigation and Drug Enforcement Administration. The 259,000 square foot facility included general office area, secured structured parking and an automotive/radio maintenance facility.
George Carter Skills
George Carter Education Details
-
Construction Science
Frequently Asked Questions about George Carter
What company does George Carter work for?
George Carter works for University Of Colorado Boulder
What is George Carter's role at the current company?
George Carter's current role is Director Of Infrastructure - College of Engineering and Applied Science.
What is George Carter's email address?
George Carter's email address is gc****@****ail.com
What schools did George Carter attend?
George Carter attended Texas A&m University.
What skills is George Carter known for?
George Carter has skills like Construction, Building Materials, Construction Management, Value Engineering, Contractors, Pre Construction, Waterproofing, Contract Management, Change Orders, Subcontracting, Process Scheduler, Procurement.
Not the George Carter you were looking for?
-
George Carter
Greenville, Sc2sargentlundy.com, fluor.com2 +186440XXXXX
-
George Carter
Greater St. Louis1bunge.com -
-
George Carter
Alpharetta, Ga
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial