AeroLeads people directory · profile

Gerard M. Email & Phone Number

Resident Engineer at RPS
Location: County Tipperary, Ireland 14 work roles 6 schools
LinkedIn matched
✓ Verified Jul 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
RPS
Role
Resident Engineer
Location
County Tipperary, Ireland
Company size

Who is Gerard M.? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Gerard M. is listed as Resident Engineer at RPS, a with 38 employees, based in County Tipperary, Ireland. AeroLeads shows a matched LinkedIn profile for Gerard M..

Gerard M. previously worked as NEC 4 Site Superintendent at Dps Group Global and Construction Manager at Construction. Gerard M. holds Bsc Civil Engineering Management Degree, Civil Engineering Managment&Civil Engineering, Honors from Limerick Institute Of Technology.

Company email context

Email format at RPS

This section adds company-level context without repeating Gerard M.'s masked contact details.

RPS

Review company-level records connected to Gerard M. before choosing the right outreach path.

Profile bio

About Gerard M.

To successfully manage and advance multiple large scale projects, utilising the latest management, business and cost control techniques, whist employing the latest technology and value engineering options and developing a winning team. To further my development in the world of Civil construction management.

Current workplace

Gerard M.'s current company

Company context helps verify the profile and gives searchers a useful next step.

RPS
Rps
Resident Engineer
County Tipperary, Ireland
Employees
38
AeroLeads page
14 roles

Gerard M. work experience

A career timeline built from the work history available for this profile.

Resident Engineer

Rps

County Tipperary, Ireland

Resident Engineer

Rps

Killaloe, County Clare, Ireland

Acting Resident Engineer on behalf of the Client for the Killaloe Bypass, Shannon Bridge crossing &R494 improvement scheme.

Nec 4 Site Superintendent

Clarecastle, County Clare, Ireland

Demolition and Remediation of a large pharmaceutical site. Project management on behalf of Roche.

Aug 2021 - Nov 2022

Construction Manager

Construction
Jul 2020 - Aug 2021

Design And Construction Manager

Curragh

Redevelopment of the Curragh Racecourse which entails a new grandstand and racing facilities along with the refurbishment of existing stables and the new build of a new high specification stable block to enhance the offering to the stakeholder. New build of a D&B waste water treatment plant to cater for the new grandstand.

Jun 2016 - Jun 2019

Infrastructure Project Manager

Dubai, United Arab Emirates

Theme Park Infrastructure. Responsible for the delivery of the related services to the Theme Park and Parking Areas. Coordinating the external works with the internal requirements of the Theme Park. Close coordination with all external stakeholders in relation to design review, program management and completion certificates from Authorities.

Oct 2015 - Jun 2016

Project Manager

Dubai

Client side PMC management for Infrastructure Projects. Development of Design Management Plans and Procedures for the Riyadh Metro in KSA. Preparing Project Plans for the Project Team. Risk Review and Management along with Reviewing of Contract documents and Scope of Service.PMC services for Abu Dhabi General Services Company on Emirati Housing and Infrastructure Projects through out Abu Dhabi. Full Contract Management and Programme Management. Client Meetings, Progress Meeting and Reporting along with full review of all submitted documents.

Nov 2012 - Sep 2015

Project Manager

Aecom Pm Project

Abu Dhabi Uae

Project Management for Civil and Construction Projects in UAE. Contract Management for Design and Build Projects (FIDIC Yellow). ADM approvals and Client approvals along with Contractors issues dealt with.• Responsible for the implementation of the Project Management Process from Initiation to Close out.• Responsible for managing the Program for the design and Procurement.• Creating the WBS and identifying the Critical Path.• Project Tools such as FIDIC Conditions of Contract Red Book, MS Project and PMBOK Method for Project Management followed.• Management of the Project Budget and Cash flow projections.• Managing the risk register and critical Path of the project. • Managing the resources for the site and team leadership within the project team.• Weekly reporting to the Client on Progress, Design and Procurement and managing the Variations and RFP,s• Weekly Meetings with Client and Stakeholders.• Making sure Client Scope is managed to deliver the product in accordance to the Contract and the Quality Management Plan. • Fit Out of 3 no FB untis Ranging from 800m2, an Operation Head office of 400m2 • Responsible for developing and reviewing the method statements and Safety Plan on site.• Responsible for approvals of all required Permits for handover from ADDC, Civil Defence and ADNOC.• Responsible for development of O&M manuals and Project Close out.

Nov 2012 - Aug 2013

A. Resident Engineer/ Construction Manger

Kpiz Abu Dhabi

Review of submittals, Method Statements and H&S for port works. Daily Safety review of contractor works. Quality Management of Port works. PMC management of KPIZ.• Responsible for construction management of civil works including 6km roadwork’s, 12 km of utility corridors and 13 of 26 buildings, Portable water pumping station, Sewage Pumping stations, Storm water outfall works, 11kv and 33kv network and Sub Stations.• Assists the Resident Engineer with administering the contract package Design and Build and providing technical direction and approval of site works, ES&H standards, design reviews, construction works, quality and schedule.• Provides interface with contractor’s site team, through daily, weekly meetings, site visits, and supervising the site team inspection process.• Ensure contractors perform their work safely, to the required quality standard, schedule and cost. • Coordinate the review and processing Contractor’s Submittals, RFIs, Method Statements, Risk Analyses, Shop Drawings, Materials reviews, and ES&H submissions.• Supervises the site co-ordination and ensures works are built to the required milestone requirements.• Monitor QA/QC plan to ensure Contractor compliance – ensure correctness of reports.• Ensures works are built to the specified standards and quality.• Ensures application of relevant project procedures and processes.• Measure Contractor Progress for comparison with programme for reporting and RE action purposes.https://www.linkedin.com/redirect?url=http%3A%2F%2Flnkd%2Ein%2FbYb3WwS&urlhash=YWpA&_t=commentary-share-link&trk=commentary-share-link

May 2011 - Nov 2012

Site Agent Super Structures

Abu Dhabi

Project: Al Sowah Island Abu Dhabi Infrastructure, Roads and BridgesProject Value: 2.5 Billion EuroMain Responsibilities: Responsible for the development and implementation of Method Statements on site.Management of all engineering staff and coordination of all information through Auto Cad.Implementation of Quality Control on works and approval of Quality Systems on SiteLiaising with main contractor on informationSupervision and training of all staff working on the Super Structures. eg piling in-situ (Swiss Boring) and Sheet Piling( ESC Piling), transition areas, columns, Cross Heads, Diaphragm Walls and Decks, waterproofing, and about 10,000 lm of Safety Barrier insitu and Pre-Cast, Sea wall works around the island services and finishing works.Dealing with all the temporary works issues on site as all works involved a large scale temporary works and design and checks produced for the Resident Engineers. Method Statements and Safe work practice statements also produced for all works. Also dealing with all pre-cast elements on site, 3000 beams ranging from 16m to 35m in length. Good experience in dealing with crainage ranging from 100t, 250t and 500t mobile and crawlers and large lifts in very difficult areas.Supervision of sub-contractorsPreparation of weekly and Project construction programme and progress reports via MS Project.Management of all construction issues for project completion in regards to structuresLiaising with consultants and local authorities and clientHealth and Safety policy implementation and system maintenance.Weekly meetings with Sub-contractors, staff and Main contractor

Oct 2008 - Sep 2011

Project Manager/Construction Manager

Ireland

Project: N7 Bridges 12no Reinforced Earth.1 no culvert underpass, Motorway works and Piling works. Duration: 20 monthsContract Type: (P.F.I /P.P.P) Design and Build Joint Venture on Motor Way (200 million Euro)Project Scope: to construct and complete 13no Bridge structures on the N7 Limerick to Nenagh HQDC. Bridges involve heavy RC in the bank seats, wing walls, decks and parapets. Involved in ground pedestal and ground stabilisation 12 of these structures are Reinforced Earth, one is opti cadre pre-cast and Pre-Cast Piles driven to foot the road aboveProject Value: 270m euroMain Responsibilities:Responsible for the development and implementation of Method Statements on site.Management of all engineering staff and coordination of all information through Auto Cad.Implementation of Quality Control on works.Liaising with main contractor on informationSupervision of sub-contractorsPreparation of weekly and Project construction programme and progress reports.Management of all construction issues for project completion.Liaising with consultants and local authorities and clientDesigning of Traffic Management Plans for the erection of beams over live roads and all required Road DiversionsHealth and Safety policy implementation and system maintenance.Weekly meetings with Sub-contractors, staff and Main contractors

Feb 2007 - Oct 2008

Senior Engineering

Portella

Project: Residential, Commercial and industrial Contract Type: Developments for private clientsProject Scope: to construct and delivery of 7no industrial units. Units were constructed of steel structures and of pre-cast concrete columns and walls RC foundations and ground floor slabs. Erection of 7 steel frame industrial units. Housing developments and site developments on 100 large dwellings and the construction of large retaining walls and a reservoir. Services and drainage for all developments includedProject Value: 10 million EurosMain Responsibilities: Management of 3 sites and all aspects of setting out, design issues and management of all staffLiaison, addressing all project and contractual matters.Client liaison Project programming and reporting to contracts manger and client.Managing all H&S issues on site with management.

Apr 2006 - Feb 2007

Senior Setting Out Engineer

Project: various projects Duration: 23 monthsContract Type: Contract workProject Scope: The large development on Dublin's East link.(Spencer Dock) in the setting out and placing of all elements in a pre-cast structure and the placing of tecrete panels. The management and liaising with the project manager on own section of work. Structure was 7 story apartment complexes, also worked on the demolition and underpinning of surrounding structures on another apartment complex and the rebuild involving insitu piling of foundations.Main Responsibilities:Carrying out clients instructions and running the day to day management of the site.Involved in all the setting out and plant management on site.Keeping records of all excavations, piling records and plant productionLiaising with client and designers

May 2004 - Apr 2006

Site Engineer

Ireland

Project: Main drainage scheme for Nenagh, Retail development in Clonmel, Residential and sewage treatment plant in Ratoath Co MeathContract type: PPP& Contract DevelopmentProject scope: The construction and delivery of a new storm and sewage system for the town of Nenagh. The project had a radius of 10 miles which involved the insertion of culverts running under the town and outfalls. The excavation and placing of 1200mm pipes up to 4m deep.Retail development (12 no) that was constructed using steel frames anchored in using holding down bolts set in place with a tolerances of 0-5 mm. all site development works included to deliver the finished project. e.g drainage works, realignment of existing road, car parks and all services to units. Residential involved all site works and the construction of new sewage pump station and 2 no in situ RC attenuation tanks. Main Responsibilities:Supervision of sub - contractorsSetting out of all elements on projects.Keeping all site records and daily allocationsLiaising with clients representativePlant Management and operating when necessary to progress works on my sections

Jun 2002 - Apr 2004
Team & coworkers

Colleagues at RPS

Other employees you can reach at ifsmexico.com.mx. View company contacts for 38 employees →

6 education records

Gerard M. education

Bsc Civil Engineering Management Degree, Civil Engineering Managment&Civil Engineering, Honors

Graduated with Honors in Civil Engineering Management. International Company Training Programs.

Certificate Level 3, Safety And Health In Construction Certificate, Level 3

Health And Safety Authority

• recognise the importance of managing safety and health in construction and key legislation. • be able to report workplace accidents •.

Certificate, Construction Safety: The Safety Management Pack (Smp20)

Health And Safety Authority

Managing Safety within Companies.

Environmental/Environmental Health Engineering, Certified Site Assessor

Epa

EPA Certified Site Assessor for protection of Groundwater and effluent treatment

FAQ

Frequently asked questions about Gerard M.

Quick answers generated from the profile data available on this page.

What company does Gerard M. work for?

Gerard M. works for RPS.

What is Gerard M.'s role at RPS?

Gerard M. is listed as Resident Engineer at RPS.

Where is Gerard M. based?

Gerard M. is based in County Tipperary, Ireland while working with RPS.

What companies has Gerard M. worked for?

Gerard M. has worked for Rps, Dps Group Global, Construction, The Curragh Racecourse, and Ilyas & Mustafa Galadari Group.

Who are Gerard M.'s colleagues at RPS?

Gerard M.'s colleagues at RPS include Miguel Rodriguez, Janeth Miranda, Ana Rubio Martinez, Marc Veyron, and Alejandro Colmenares.

How can I contact Gerard M.?

You can use AeroLeads to view verified contact signals for Gerard M. at RPS, including work email, phone, and LinkedIn data when available.

What schools did Gerard M. attend?

Gerard M. holds Bsc Civil Engineering Management Degree, Civil Engineering Managment&Civil Engineering, Honors from Limerick Institute Of Technology.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Gerard M. you were looking for.

View similar profiles