Operations Superintendent
Yopal, Casanare, Colombia
In charge of the executive, technical and administrative management of the productive oil and gas fields, in the Alcaraván A, Alcaraván B, Rio Verde and Llanos 23 blocks, following CEDCO guidelines, ensuring compliance with the objectives and production goals, cost, safety management and HSE. Construction and control of the operating expenses and investments budget in the production blocks, establishing the necessary controls to ensure compliance and optimize resources.◎ Increased the injectivity index of the Tilodirán Well 06 managing to inject an additional 10,000 BWPD (barrels of water per day) which allowed to increase production by 400 BOPD (barrels of oil per day), I also managed to reduce the cost of water treatment by US $ 70,000 / Month. For this reason, the intervention of the well was not necessary and it generated savings of $USD 1.5 MM.◎ Recovered the production of 3 wells (Tilodirán 11, 07 and Canacabaré 09) for a total of 450 BOPD, through various processes based upon an adequate interpretation and analysis of the variables. The intervention of these wells was also avoided, reducing costs by $USD 4 MM