Sudeep Ghimire Email and Phone Number
With a decade of working as an "Environmental Professional", I have had the experiences of working in different settings, including private, public, government, and I/NGOs. There, I have become familiar with the working culture, beliefs, and traditional norms of multilingual communities. Understanding these multiple social values helps me during the formulation of projects and programs with the objective of "social change.".
-
Coordinator (Environment, Social, Health And Safety)Rastriya Prasaran Grid Company LimitedKathmandu, Np -
Environmental OfficerRastriya Prasaran Grid Company Limited Jan 2023 - PresentKathmandu, Bāgmatī, NepalKey Achievements:• Facilitated and integrated environmental and social safeguard and occupational health and safety literacy and its importance among the RPGCL staff, and stakeholders.• Prepared official documents under the guidance of administrative unit, and procurement unit.• Reviewed/updated/revised the E&S documents including but not limited to ToR, BID-documents, ESIA reports, Tree Enumeration Methodology, feasibility study reports, cadastral reports and similar other safeguard documents under guidance of Project Managers of Karnali Corridor, Lamabagar-Barhabise, Sitalpati-Dhungesangu and provide feedback timely for the correction.• Drafted guiding/operating document for resolving grievances as "Standard Procedure for Grievance Redress Mechanism" for RPGCL.• Coordinated closely with ministries, departments, province level government counterparts, district level government counterparts and local level counterparts for securing the forest clearance permits, land acquisition through involuntary -related processes.• Coordinated closely, facilitated and guided the contractor of Karnali Corridor Project for the preparation of Contractor’ Environmental and Social Management Plan, Occupational Health and Safety Plan, Community Development Plan under Corporate Social Responsibilities after the completion of RESA. In the case of the Lamabagar-Barhabise Project, since the transmission line passes through the conservation area, acted similarly to the consultant for the preparation of the Biodiversity Action Plan (BAP).• Prepared periodic progress infographic reports, self-monitoring reports of Karnali Corridor and Haitar-Sitalpati Projects that needs to be submitted to DoEnv and DoED.• Arranged large databases using excel and ArcGIS tools, used tools for preparation of infographics to aid reporting, communications, and public disclosure and provided supervisory support to on-site E&S assistants. -
EnvironmentalistNea Engineering Company Limited Apr 2021 - Dec 2022Kathmandu, Bāgmatī, NepalInvolved ProjectEnvironmental and Social Studies of Distribution System Upgrade and Expansion Project (DSUEP) Funded by Asian Infrastructure and Investment Bank (AIIB) and European Investment Bank (EIB)’s).Key Achievements:• Worked closely with the administrative and EHSSD team of NEAEC in setting assigned Project's objectives, target based on AIIB and EIB safeguard policies.• Supported EHSSD in finalizing the Inception Report for AIIB & EIB’s funded Sub-Projects.• Supported EHSSD in finalizing the 18 Screening report for AIIB and 13 as per EIB' requirement.• Prepared 5 site specific ESMP as per AIIB safeguard policy and 7 as per EIB's safeguard policy. Requirements and conceptual framework provisioned in Environmental and Social Management Framework (ESMF) for DSUEP has been duly fulfilled as it serves as a guiding document developed and agreed by AIIB, EIB, NEA. • Supported NEAEC Team for producing 20 Terms of Reference (ToR) for Brief Environmental Study (BES) for DSUEP Project as provisioned by the Environment Protection Act 2076, and Environment Protection • Regulation 2077.s• Coordinated with NEA Project Management Team during finalization of ESMPs and ToR.• Proactively supported DSUEP team in the preparation of Stakeholder Engagement Plan (SEP), Due Diligence Report (DDR), Resettlement Action Plan (RAP), Community Development Plan (CDP) reports.• Facilitated NEACE's EHSSD unit, NEA PMU, and lenders representative joint monitoring visit.• Reviewed feedback provided on ESMPs and other safeguard documents from AIIB, EIB's Regional Office/Nepal's Country Consultant, incorporated all the concerns raised by respective lenders; and submitted timely. • Prepared periodic reports as per EHSSD requirements.
-
Environmental SpecialistNational Reconstruction Authority Jul 2020 - Apr 2021Tanahun District, Gandakī, NepalInvolved Project:Earthquake Housing Reconstruction Project (EHRP) under the Technical Assistance of The World Bank Group.Key Achievements:• Facilitated the NRA engineers, social mobilizers and local level staffs on reporting and other aspects in coordination with SDS and DLPIU Chief.• Provided Enviro-Socio-Technical assistance during DFS of the Sub-Projects related to slope instabilities/water supply in Tanahun district. • Participated in central level field missions related to reconstruction.• Facilitated awareness and sharing of environmental concerns as per specific environmental sensitivities in the project areas in coordination with the Project components and designs as this was a National Priority Project.• Prepared RESA Checklist for screening study to meet requirements of WB and NRA’s Safeguards Policy Statement (NRA 2020) giving priority to vulnerable and PAF.• Undertaken feasibility studies, site visits, and completed 33 settlement level screening studies.• Prepared 9 technically feasible ESMPs under the compliance framework of ESMF, 2020 for NRA and WB under the Environmental and Social Safeguard Program.• Coordinated and consulted with local levels, DCC, DFO, DSCWMO, DAO for the efficient implementation of the reconstruction of housing units under the World Bank Reimbursement Process.• The Grievance Redressing Mechanism (GRM) was well established from the submission of applications from people to compliance studies in the field.• Prepared detailed ESMP reports, action plans, and monitoring plans for proper safeguard program execution. • Maintained all the documents and databases related to E&S information that is foremost during liaison with CLPIU and WB.• Supported DLPIU during documentation of beneficiaries with issues related to resettlement, landlessness, and appellate beneficiary processing.
-
Environmental ExpertAbhiyantra Consulting Pvt Ltd Jan 2020 - Jul 2020Kathmandu, Bāgmatī, NepalInvolved Projects:Environmental and Social Assessment Related AssignmentsA. IEEs of 4 Grid Connected Solar PV Projects (10 MW each) in Kapilvastu and Lamahi; 1. Grid Tied Solar PV Project Part -1 (10MW), Kapilvastu2. Grid Tied Solar PV Project Part -2 (10MW), Kapilvastu3. Grid Tied Solar PV Project (10MW), Lamahi4. Grid Tied Solar PV Project (10MW), Lamahi-1B. EIA of Infrastructure/Building1. Finalized ToR and SD of Multi Modal Logistic Park, Biratnagar for Chaudhary Group Corp.Key Achievements:• Prepared Inception Report.• Prepared RESA Checklist to meet requirements of EPR 2053.• Supported during feasibility study, site visits, screening study for solar grid Project and infrastructure/building• Prepared ToR and SD (in case for EIA only).• Identified key stakeholder and ensured effective engagement during field visit.• Analyzed the level of impact and proposed probable practical and acceptable mitigation measures for the minimizing adverse impacts in environment and society.• Prepared IEEs and EIA as per GoN’s legal provisions.• Prepared and presented findings among the DoED and Ministry.Incorporate all the feedback provided from review committee and re-submitted to the ministries for approval process. -
Environmental ExpertAbhiyanta Solutions Pvt. Ltd. Jul 2019 - Dec 2019Kathmandu, Bāgmatī, NepalInvolved Projects:Environmental and Social Assessment Related Assignments(i) IEE of 1. Dharan -Kerabari- Letang- Madhumalla Road Project (53 Km)2. Karaputar-Tallobesi-Hemja MH Highway Project (49 km)3. Khandbari -Num Road Section of Koshi Corridor (39 km)4. Swarna Sagarmatha Brihat Chakra Path Road Project (36 Km)5. Tinau-Danab Corridor Road Project (50.33 Km)6. Singhiya Bridge (60m)(ii) EIA of 1. EIA-Hotel Saffron C.K. Pvt. Ltd.Key Achievements:• Prepared Inception Report.• Prepared RESA Checklist to meet requirements of EPR 2053 and EPR 2077.• Supported during feasibility study, site visits, screening study for solar grid Project and infrastructure/building• Prepared ToR and SD (in case for EIA only).• Identified key stakeholder and ensured effective engagement during field visit.• Analyzed the level of impact and proposed probable practical and acceptable mitigation measures for the minimizing adverse impacts in environment and society.• Prepared IEEs and EIA as per GoN’s legal provisions.• Prepared and presented findings among the Departments and Ministry.• Incorporate all the feedback provided from review committee and re-submitted to the ministries for approval process.
-
Environmental SpecialistNational Reconstruction Authority Nov 2016 - Jul 2019Nuwakot District, NepalInvolved Project:Earthquake Housing Reconstruction Project (EHRP) under TA of WBG.Key Achievements:• Lead for overall safeguard implementation within the district for reconstruction Project.• Facilitated the NRA engineers, social mobilizers and local level staffs on reporting and other aspects in coordination with SDS and DLPIU Chief.• Prepared RESA Checklist for screening study to meet requirements of WB and NRA’s Safeguards Policy Statement (NRA 2020) giving priority to vulnerable and PAF.• Categorized and stratified 303 settlements within 28 former VDCs based on similar topography, resource utilization and administrative boundary as defined in ESMF for EHRP for GoN and WB for Enviro-Social Screening with the help of social mobilizers.• Prepared 34 cluster level Environmental and Social Screening Report (ESSR) from 303 settlement reports for Nuwakot District under the compliance framework of ESMF, 2020 for NRA and WB.• Prepared, finalized and implemented 14 site specific Environment and Social Management Plan (ESMP) within Nuwakot district.• Prepared the District Level Environment and Social Management Plan for Nuwakot district, Nepal.• Provided technical input in revised ESMF mainstreaming DRM, GESI and climate change in Nepal for World Bank on behalf of DL-PIU (GMaLI), Nuwakot.• Prepared Operational Manual for Plantation Management in Nuwakot District for Reconstruction Project.• Established Good Relationship with Partner Organizations, Elected Body of Rural Municipality and Municipality along with District Level Government Line Agencies.• Provided input on reconstruction and upgrading of Gerkhutar-Chokhade Road Sub-Project, Nuwakot for EFAP Project as well.• Prepared completion report for the safeguard implementation sub-Projects.• Accomplished as Assistant Polling Officer during Local Level Election and Polling Officer for Election of Members of the House of Representatives and Members of the State Assembly in FY 2017/018 elections in Nepal.
-
Project CoordinatorCenter For Integrated Urban Development Jul 2016 - Nov 2016Lalitpur District, NepalKey Achievements:• Finalized concept papers/proposals of NRs. 5.9M and reports for OXFAM GB in Nepal for “Earthquake Response Program in Godavari Municipality” for 3, 4, 5, 6 & 7 Wards through Community Led Total Sanitation (CLTS) approach.• Prepared Monitoring Log Framework for the intervention of Project activities. • Supervised 8 field staffs as per Project plan and campaigns• Organized meetings, workshops, and review meeting with field, local and center office teams• Prepared detailed budget and its tracking mechanism for and resource mobilization• Facilitation for capacity building and performance appraisal of team members• Conduct coordination with Project level stakeholders and donor agencies in planning, reporting and monitoring• Developed effective working relationship with local CBOs/CSOs, governmental line agencies and donor agencies/development partners.• Accomplished 150 children, gender and disability friendly HHs level improved latrines benefiting 639 beneficiaries, other 65 HHs with safe and reliable drinking water benefiting 277 beneficiaries with inclusiveness approach while developing user’s friendly water facilities, 1 community primary school toilet benefiting 130 school children/beneficiaries through improved sanitation and hygiene facilities, software activities like 1 Solid Waste Management, 2 domestic and environmental sanitation, 2 Menstrual Hygiene Management (MHM) promotion trainings, 5 Female Community Health Worker (FCHV) training on hygiene and promotional activities, 2 Water Quality Test Training using ENPHO-Kit and 1 Vulnerable Capacity Assessment (VCA) at community level.• Accomplished all related administrative works related to Project activities and other instructions/concerns expressed by center office.
-
Monitoring And Evaluation OfficerCenter For Integrated Urban Development Jul 2014 - Jun 2016Lalitpur District, NepalKey Achievements:• Monitor Nala, Kavre WASH in School, Shelter, Kamalalmai WASH Project activities.• Generated primary field-level data• Mobilized staff as per Project plan and campaigns• Organized meetings and reviews of teams works• Developed budget tracking and resource mobilization system• Facilitated capacity building trainings for field staffs• Coordinated with national stakeholders and international donor agencies–planning, reporting and monitoring• Develop effective networking with local CBOs/CSOs, governmental line agencies and donor agencies/development partners• Prepared and shared monthly plan, monitoring report (quarterly, semi-annual, annual) to center office and donor agencies.• Supported in preparation/review of concept papers/proposals and reports for OXFAM GB in Nepal, Water Aid Nepal, UN-Habitat and Government of Nepal.
-
InternWwf Nepal Mar 2014 - Jun 2014Kathmandu, Bāgmatī, NepalUsed photo-point monitoring and analysis for the identification of 7 Tigers, Common Leopard and striped Hyena through camera trap more than 500 identical photographs from Terai Arc Landscape (TAL) Program -
Environmental OfficerSolid Waste Management Technical Support Center Apr 2012 - Jun 2012Lalitpur District, NepalSolid Waste Management Baseline Survey Training and baseline study of solid waste management in Ratnanagar Municipality, Chitwan through assisting to finalize sampling design, undertaking baseline survey, liaison with local bodies and preparing report as per ADB standards
Sudeep Ghimire Education Details
-
Environmental Science -
Environmental Science
Frequently Asked Questions about Sudeep Ghimire
What company does Sudeep Ghimire work for?
Sudeep Ghimire works for Rastriya Prasaran Grid Company Limited
What is Sudeep Ghimire's role at the current company?
Sudeep Ghimire's current role is Coordinator (Environment, Social, Health and Safety).
What schools did Sudeep Ghimire attend?
Sudeep Ghimire attended Tribhuvan University, Tribhuvan University.
Who are Sudeep Ghimire's colleagues?
Sudeep Ghimire's colleagues are Ishwar Bhatta, Nirmal Kadariya, Sujan Paudyal, Jharendra K.c., Nagendra Chaudhary, Sujan Paudel, Raj Kiran Basukala.
Not the Sudeep Ghimire you were looking for?
-
-
-
Sudeep Ghimire
Deputy Manager (Project Monitoring Control And Billing) At Solu Hydropower Ltd.Nepal2 +977984XXXXXXX
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial