20 years of significant and international experience in the Construction sector of large Power Plants (Combined Cycles, Coal Power Plants, Nuclear Power Plants).Graduated cum laude in 2003 in Mechanical Engineering (Energy sector) from the University of Palermo, I have been working for three of the major counterparts usually involved in a typical EPC/EPCM contract of Power sector (Contractor, General Contractor, Owner) covering roles of increasing responsibility for over a dozen of Construction Projects in Italy, Spain, Russia and Slovak Republic.I have been therefore dealing with most of the Construction business issues (ordinary/extraordinary contract administration, accounting, cost controlling, budget preparation, scheduleing and progress reports, disputes, active/passive claims, variation orders, acceleration, extension of time, contractors coordination, any sort of technical/quality/safety issues, etc...) from different and sometimes opposite perspectives, getting to an integrated and mature understanding of the entire life cycle of a complex Construction Project.Such experiences, earned in a multi-ethnic/cultural environments, joined with my technical background and my true interest for the whole energy market, led me to consolidate my knowledge and skills in Project Management, in most of the technical issues related to the Constuction/Operation of Power Plant as well as in energy scenarios/regulation.
-
Project ManagerEnel Group Dec 2021 - PresentItalyPROJECT: Termini Imerese Power Plant - Repowering of n°2x150MW gas open cycle units (complete demolition of existing units, including civil foundations, and delivery of brand new units). -
Project ManagerEnel Group Apr 2021 - PresentItalyPROJECT: Termini Imerese Power Plant: 1,6MW of additional Photovoltaic capacity to be installed within existing Combined Cycle Power Plant. -
Project ManagerEnel Group Dec 2019 - Feb 2022ItalyPROJECTS: Upgrade, of following Combined Cycle Units, consisting in the Engineering, Procurement and Construction of CO and SOx reduction sytem (respectively, CO catalizer and SCR system including relevant ammonia storage/handling):- Pietrafitta Power Plant (400MW): n°1 unit (350MW).- La Casella Power Plant: n°1 unit (350MW).- Termini Imerese Power Plant: n°2 units (700MW).- Priolo Gargallo Power PLant: n°1 unit (350MW). -
Project ManagerEnel Group Jul 2019 - May 2020ItalyPROJECTS:- La Spezia Coal Power Plant - Remediation Works for fuel oil pipeline (2,5km) and n°2 fuel oil tanks (1x30.000m3 and 1x50.000m3).- Genoa Coal Power Plant - Demolition Works.- Porto Tolle Coal Power Plant: Engineering, Procurement and Construction of site electrical system (n°3 MV/LV transformation cabins and relevant 2km MV interconnecting cables) required for future demolition works. -
Project ManagerEnel Jun 2018 - Jun 2019Mochovce (Slovakia)PROJECT: Mochovce Nuclear Power Plant - Completion Works of Units 3&4 (2x440MWe VVER Reactor Type).POSITION: Project Manager for Mechanical Contracts in Conventional Island (Owner side).MAIN TASKS/RESPONSIBILITIES:-coordination of internal resources and third parties/vendors for the flawless execution of project;-ensuring that project is delivered on-time, within scope and within budget;-developing a detailed project plan to track progress;-using appropriate verification techniques to manage changes in project scope, schedule and costs;-perform risk management to minimize project risks;-dealing with procurement dpt during all phases of a contract life cycle. -
Construction ManagerEnel Jul 2012 - May 2018Mochovce (Slovakia)PROJECT: Mochovce Nuclear Power Plant - Completion Works of Units 3&4 (2x440MWe VVER Reactor Type).POSITION: Construction Manager Nuclear Island (Owner side).MAIN TASKS/RESPONSIBILITIES:-constructability analyses in order to find the best applicable construction procedures and sequences among various Contractors;-organizing meeting with Supervisory Personnel, Contractors, Designers to discuss and resolve any construction problem;-coordination among Contractors by prioritizing the activities;-coordination of the Supervisory Personnel;-evaluation of available workload versus available onsite workforce;-assessment of the construction schedule including analyses of delays/criticalities with proposal of the possible recovery actions to be implemented;-analyses of the interface points between two or more Contractors in order to avoid, mitigate or envisage disruptions, delays, claim or similar;-prepare and submit progress tracking reports;-estimating quantities, time, costs, resources or material needed to perform a work. -
Mechanical SuperintendentEnel Jul 2010 - Jun 2012Mochovce (Slovakia)PROJECT: Mochovce Nuclear Power Plant - Completion Works of Units 3&4 (2x440MWe VVER Reactor Type).POSITION: Mechanical Superintendent in Conventional Island (Owner side) for following erection contracts:-BOP Piping inside turbine hall (over 6.000 tons), including prefabrication;-BOP Equipments inside turbine hall (MSR's, Preheaters, etc.)MAIN TASKS/RESPONSIBILITIES:-on site daily management of the Construction Contracts;-management of claims and acceleration;-preparation and issuing of the monthly payment certificate for the activities carried out on site by the Contractor;-feasibility analyses for prefabrication workload based on availability of bulk material, approved for construction documentation and installation priorities;-feasibility analyses for installation workload based on available prefabricated isometrics and availability of erection areas and interfaces;-developing and sharing with Contractor the best operational schedule based on the above mentioned analyses;-prepare and submit progress tracking reports. -
Mechanical SuperintendentEnel Apr 2009 - Jun 2010Algeciras (Spain)PROJECT: 800MWe Algeciras Combined Cycle Power Plant (greenfield).POSITION: Mechanical Superintendent (Owner side) for following jobs:-installation of n°2 HRSG's (STF supply);-chemical cleaning and air blowing of the process piping.MAIN TASKS/RESPONSIBILITIES:-on site daily management of the Construction Contracts;-preparation and issuing of the monthly payment certificate for the activities carried out on site by the Contractors; -management of claims and acceleration;-prepare and submit progress tracking reports. -
Site SupervisorEnel Oct 2008 - Mar 2009Nevinnomyssk (Russia)PROJECT: 410MWe Nevinnomyssk Combined Cycle Power Plant (greenfield).POSITION: Site Supervisor (Owner side).MAIN TASKS/RESPONSIBILITIES:-overseeing the preliminary construction activities (such as earth moving and underground civil works, offices installation, demolitions);-evaluation of the way for the heavy transportation and heavy lifting;-preparation of preliminary operational construction time schedule;-preliminary approach with Contactors and local stakeholders. -
Mechanical SuperintendentEnel Jun 2007 - Sep 2008Puente Nuevo (Spain)PROJECT: Puente Nuevo existing Coal fired Power Plant (320MWe) - Environmental Retrofitting and Life Extension (brownfield).POSITION: Mechanical Superintendent (Owner side) for following jobs:-installation of a new Wet Desulphurization system (DeSOx) limestone-gypsum type;-refurbishment of the Steam Generator (replacement of all 16 burners, replacement of all SH and RH serpentines, refurbishment of the n°4 Air Preheaters Ljungstrom type);-refurbishment of the Steam Turbine (BROWN BOVERI manufacturer);-prefabrication & installation of new BOP piping;-refurbishment of the Electrostatic Precipitator.MAIN TASKS/RESPONSIBILITIES:-on site daily management of the Construction Contracts;-preparation and issuing of the monthly payment certificate for the activities carried out on site by the Contractors;-management of claims and acceleration;-prepare and submit progress tracking reports. -
Mechanical SupervisorEnel Nov 2006 - May 2007Fusina (Italy)PROJECT: Fusina existing Coal fired Power Plant - Environmental Retrofitting of Units 1&2 (165MWe and 171MWe respectively).POSITION: Mechanical Supervisor (Owner side) for following jobs:-installation of n°2 new Catalytic Denitrification system (DeNOx SCR);-installation of a new Wet Desulphurization system (DeSOx) limestone-gypsum type common to both units;-replacement of n°4 induced draft fans;MAIN TASKS/RESPONSIBILITIES:-daily on site supervision of the activities;-progress evaluation;-support to management of claims and acceleration;-on site coordination among the Contractors. -
Project ControllerSnamprogetti (Saipem) Feb 2006 - Oct 2006San Donato Milanese (Italy)PROJECT: Priolo Gargallo existing Oil Refinery - 480MWe Combined Cycle Power Plant (brownfield).POSITION: Project Controller (General Contractor side).MAIN TASKS/RESPONSIBILITIES:-planning of all engineering, procurement and construction activities;-definition of project WBS;-preparation of Project Progress Report (including Cost Control issues). -
Deputy Site ManagerGallo Nov 2004 - Jan 2006Termoli (Italy)PROJECT: 780MWe Termoli Combined Cycle Power Plant (greenfield).POSITION: Deputy Site Manager (Contractor side) for following jobs:-installation of n°2 HRSG's (N/E-CCT supply);-installation of n°1 Steam Turbine with relevant 320MWe generator, Water Cooled Condenser and auxiliaries (all SIEMENS supply);-prefabrication & installation of entire BOP piping (about 900tons);-installation of n°1 Cooling Tower to cool Condenser's water (SPX supply);-prefabrication and installation of a 5.000m3 fire fighting water tank.MAIN TASKS/RESPONSIBILITIES:-on site daily management of the Construction Contracts;-preparation and periodical updating of the construction time schedules;-track record of the actual progress achieved versus planned;-management of active/passive claims and acceleration;-preparation (towards Clients) and approval (towards Subcontractors) of the monthly payment certificates. -
Techical OfficerGallo Jul 2004 - Oct 2004Voghera (Italy)PROJECT: 400MWe Voghera Combined Cycle Power Plant (greenfield).POSITION: Technical Officer (Contractor side) for following jobs:-prefabrication & installation of entire BOP piping (about 400tons);-installation of n°1 Air Cooled Steam Condenser (GEA supply).MAIN TASKS/RESPONSIBILITIES:-preparation of the "test pack" for the over 130 piping systems to be hydraulically tested;-management of the welding register (including check of welder's percentage reparation and X-ray tests);-review of applicable welding books (WPS, PQR and Welders' Certificates). -
Project Engineer / Assistant Project ManagerGallo Dec 2003 - Jun 2004Rome (Italy)PROJECT: Various.POSITION: Assistant Project Manager (Contractor side) for following jobs:-installation of n°2x260MW Gas Turbines GENERAL ELECTRIC MS9001 (part of the Project: 780MW Altomonte Combined Cycle Power Plant);-prefabrication & installation of entire BOP piping and installation of the Air Cooled Steam Condenser (part of the Project: 400MW Voghera Combined Cycle Power Plant);-installation of n°2 N/E-CCT HRSG's (part of the Project: 780MW Combined Cycle Power Plant inside existing "Polimeri Europa" chemical plant established in Mantova);-installation of n°3 N/E-CCT HRSG's (part of the Project: 1.170MW Combined Cycle Power Plant inside existing "Polimeri Europa" chemical plant established in Brindisi);-transformation of n°1 Lignite/Fuel Oil fired Steam Generator into a Biomass fired one (part of the Project: Mercure existing Lignite/Fuel Oil fired Power Plant - Transformation of Unit 2 (75MW) into a 41MW Biomass fired one.MAIN TASKS/RESPONSIBILITIES:-study of the awarded Contracts (both with Clients and Subcontractors);-detailed cost budget preparation;-management of active/passive claims and acceleration;-management of "purchasing request" coming from various site (for materials, consumables, detail design services, lifting, etc...);-expediting at Subcontractor's premises;-preparation and periodical updating of the construction time schedules;-analyses of the expected cash flows. -
Technical&Planning OfficerNuova Montaggi Industriali May 2003 - Nov 2003Termini Imerese (Italy)PROJECT: Termini Imerese existing Fuel Oil fired Power Plant - Transformation of Unit 5 (320MWe) into a 400MWe Combined Cycle (brownfield).POSITION: Technical Officer (Contractor side) for following jobs:-installation of n°1 Gas Tubine SIEMENS V94.3A2 with relevant 260MWe generator and auxiliaries;-installation of n°1 HRSG (ANSALDO supply);-prefabrication & installation of entire BOP piping;-prefabrication & installation of all new Steel Structures (gas turbine building, pipe rack, heater bay).MAIN TASKS/RESPONSIBILITIES:-piping isometrics spooling and preparation of welding registers;-interface with gas turbine manufacturer supervisor;-geodetic survey on site;-as built drawings preparation;-preparation and periodical updating of the construction time schedules.
Giuseppe Messina Skills
Giuseppe Messina Education Details
-
110/110 Cum Laude
Frequently Asked Questions about Giuseppe Messina
What company does Giuseppe Messina work for?
Giuseppe Messina works for Enel Group
What is Giuseppe Messina's role at the current company?
Giuseppe Messina's current role is Project Manager - PMP®.
What is Giuseppe Messina's email address?
Giuseppe Messina's email address is gi****@****inet.it
What schools did Giuseppe Messina attend?
Giuseppe Messina attended Università Degli Studi Di Palermo.
What skills is Giuseppe Messina known for?
Giuseppe Messina has skills like Epc, Project Management, Energy Industry, Piping, Thermal Power Plant, Steam Generators, Steam Turbines, Gas Turbines, Welding, Vba, Microsoft Excel, Contract Management.
Who are Giuseppe Messina's colleagues?
Giuseppe Messina's colleagues are Salvatore Daniele La Bella, Claudia Cardilli, Ricardo Del Pozo, Francesco Guidi, Tatyana Fernandes, Denis Zhirnov, Andrés Sáez Hermosilla.
Not the Giuseppe Messina you were looking for?
-
-
Giuseppe Messina
Milan -
Giuseppe Messina
Orta San Giulio -
Giuseppe Messina
Rome1pg.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial