Gomathinayagam M

Gomathinayagam M Email and Phone Number

Sr.Engineer Quality and Engineering @ PIONEER WINCON PRIVATE LIMITED
Tirunelveli, TN, IN
Gomathinayagam M's Location
Tirunelveli, Tamil Nadu, India, India
About Gomathinayagam M

I have Vast Experience Quality and Electrical Engineering Field in the Renewable Energy wind & Solar sector. Sr.QA Engineer Total Experience 15 years ,Pioneer Wincon at 4 Years to till date,Suzlon Energy Limited as a QA/QC Engineer 2years 6 months, Regen powertech at 1 year 8 month,Supreme power equipment pvt ltd as a Testing Engineer 5 years & 5 months...

Gomathinayagam M's Current Company Details
PIONEER WINCON PRIVATE LIMITED

Pioneer Wincon Private Limited

View
Sr.Engineer Quality and Engineering
Tirunelveli, TN, IN
Website:
bing.com/maps
Employees:
177
Gomathinayagam M Work Experience Details
  • Pioneer Wincon Private Limited
    Sr.Engineer Quality And Engineering
    Pioneer Wincon Private Limited
    Tirunelveli, Tn, In
  • Pioneer Wincon Private Limited
    Sr.Engineer Quality & Engineering
    Pioneer Wincon Private Limited Aug 2018 - Present
    Chennai Area, India
    a) Competent in applying QA tools & approaches as per Industrial Standards; skilled in assuring that all products manufactured represent the maximum quality & reliability attainable by establishing effective quality control inspections, tests & corrective proceduresb) Excels in conducting inspection of the Current Transformer, Potential Transformer, Distribution Transformers & Power Transformer, Power Cables, VCB, SF6 Breaker, Lightning Arrestors other Insulation… Show more a) Competent in applying QA tools & approaches as per Industrial Standards; skilled in assuring that all products manufactured represent the maximum quality & reliability attainable by establishing effective quality control inspections, tests & corrective proceduresb) Excels in conducting inspection of the Current Transformer, Potential Transformer, Distribution Transformers & Power Transformer, Power Cables, VCB, SF6 Breaker, Lightning Arrestors other Insulation Materials.c) Track record of establishing QA Functions like Incoming, In-Process, Final Product Inspection, Production & Performance Testing; deft in managing day-to-day supplier performance to ensure meeting of cost, delivery & quality normsd) A keen planner with skills in preparing MIS & Quality Reports to provide feedback to top management on progress; competent in overseeing performance bottlenecks & taking corrective measures to avoid the samee) Preparation of Technical Specification for BOP items (Transformer, CT, PT, Lightning arrester, Cables and Insulator).f) Technical support to Purchase team.g) BOP items Technical discussion had with Vendor.At Site:-a) Incoming inspection of WTG materials like tower section, Nacelle, Generator, Hub, Transformer and all electrical items. b) WTG Materials incoming inspection checklists updating.c) Identifying the Non conformity (transit damage , short supply & manufacturing defects) during incoming inspection and raise NCR For Defects.d) In process inspection of Erection and Electrical Activities.e) FTR process Training for Project Team and Erection contractor. f) WTG Inspection as per Audit Checklist.g) Daily Quality Report raise any deviation in the process is recorded as NC. h) Root cause analysis For Deviation process and Corrective Action Preventive Action is identified. i) Electrical 33KV Line and DP yard materials BOP Preparation and Verification done.successful Commissioned of 100MW Polling Sub station Show less
  • Suzlon Energy Limited, Pune
    Quality Engineer
    Suzlon Energy Limited, Pune Nov 2016 - Aug 2018
    Tirunelveli Area, India
    m) Site Incoming inspection of WTG materials like tower section, Nacelle, Generator, Hub, Transformer and all electrical items. n) WTG Materials incoming inspection checklists updating in timely & handover in time to store. o) Identifying the Non conformity (transit damage , short supply & manufacturing defects) during incoming inspection and raise NCR Declaration p) NCR follow up with Central Quality team and updating. q) In process inspection of WTG Erection… Show more m) Site Incoming inspection of WTG materials like tower section, Nacelle, Generator, Hub, Transformer and all electrical items. n) WTG Materials incoming inspection checklists updating in timely & handover in time to store. o) Identifying the Non conformity (transit damage , short supply & manufacturing defects) during incoming inspection and raise NCR Declaration p) NCR follow up with Central Quality team and updating. q) In process inspection of WTG Erection activities and relevant as per QCPIR and PQHC. r) FTR process Training for site Project Team and Erection contractor. s) WTG Inspection as Safe Run checklist. t) Daily Quality Report raise any deviation in the process is recorded as NC. u) Root cause analysis For Deviation process and Corrective Action Preventive Action is identified. v) Timely support to Site Project team as to complete the target as targeted. w) Verification of civil cube test. x) Maintaining 5S and Improve the quality process with Implementation of Kaizen,8 waste, 6M.Overhead line 33KV AND 220KV Tower Line, Single and Double pole:- a) Proper Pole Distance marking as per given diagram.b) Proper Depth is maintaining for Pole Erection.c) Using the line conductors depends upon Current rating (Dog, Panther,).d) After completing line stringing IR value checking done.e) Pole earthing to be done as per given diagram. f) Coping and Muffing as per given diagram.g) DFT(Deflection film Thickness) Verification done for Pole.h) More than 500KM line inspection was done.Elevated DP yard 33KV :- a) Compact Substation and inter connection with Marshaling Box checking as per given Scheme, Like Alarm and Trip signal checking for transformer preventive accessories. b) Routine Tests of Transformer in site level.c) Local and remote checking of Circuit breaker. d) Transformer LT cable IR value checking.e) Earth pit excavation and strip laying as per given diagram.f) Isolator Alignment and Smooth operation checking. Show less
  • Suzlon Energy Limited, Pune
    Quality Engineer
    Suzlon Energy Limited, Pune Nov 2016 - Aug 2018
    Andhra Pradesh, India Tamilnadu
    Completed project Amidalaya -2 100MW, Borampalli -2 100 MW and Chandragiri 1st SECI Project - 250 MW
  • Regen Powertech
    Quality Engineer
    Regen Powertech Mar 2015 - Nov 2016
    Chennai Area, India
    a) Site Incoming inspection of WEC materials like Foundation can, tower section, Nacelle, Generator, Hub and Blades within 24 Hours of unloading. b) WEC Materials incoming inspection checklists updating in timely & handover in time to store. c) Identifying the Non conformity ( transit damage , short supply & manufacturing defects ) during incoming inspection and NCR Declaration d) NCR follow up to Central TQM and updating. e) IN process inspection of WEC Erection… Show more a) Site Incoming inspection of WEC materials like Foundation can, tower section, Nacelle, Generator, Hub and Blades within 24 Hours of unloading. b) WEC Materials incoming inspection checklists updating in timely & handover in time to store. c) Identifying the Non conformity ( transit damage , short supply & manufacturing defects ) during incoming inspection and NCR Declaration d) NCR follow up to Central TQM and updating. e) IN process inspection of WEC Erection activities and relevant. f) FTR process Training for site Project Team for enhancing his competency skill. g) WEC Audit as per HOTO Check list PRJ PTC 69. h) Daily safety observation and Field safety observation report preparation. i) Timely support to Site Project team as to complete the target as targeted. j) Verification of duly filled PTW forms and Toolbox Meeting Report. k) Validation of Calibration of Site PPEs and WEC Erection Tools and Instrument. l) Verification of Operation Process Sheets (Torqueing) in the fasteners of WEC .m) Verification of civil cube test. n) Overhead line 33KV, Pole & DP yard inspection Overhead line 33KV :- Sand Blasting for pole, DFT check for pole painting, Span distance of line, Sag of the line, Depth of the pole, using conductor are Dog, Panther and Horse. DP yard for 33KV :- Transformer and VCB Plinth Construction done as per diagram, Control wiring verification between C&R Panel to VCB and Transformer, Relay Setting, CT and PT testing, Checking proper operation breaker. In the period of 2015 to 2016 working with different sites like Hatuniya MP and Dhar MP Total completion of project is 105 MW. OH Line inspection done. Show less
  • Supreme Power Equipment Private Limited
    Test Engineer
    Supreme Power Equipment Private Limited Sep 2009 - Feb 2015
    Chennai Area, India
    a) Raw Material Inspection as per Quality Assurance Plan And IS Standard (Incoming Inspection). b) On site and off site in Fabricated tank inspection up to 25 MVA c) In processInspection done all process of Transformer Manufacturing. d) Preparing and maintaining the incoming and in process records. e) Final inspection done before dispatch As per checklist.f) Knowledge of 5S. 1. ROUTINE TEST OF TRANSFORMER UPTO 16MVA/110KV/33-11KV:-a) Winding resistance… Show more a) Raw Material Inspection as per Quality Assurance Plan And IS Standard (Incoming Inspection). b) On site and off site in Fabricated tank inspection up to 25 MVA c) In processInspection done all process of Transformer Manufacturing. d) Preparing and maintaining the incoming and in process records. e) Final inspection done before dispatch As per checklist.f) Knowledge of 5S. 1. ROUTINE TEST OF TRANSFORMER UPTO 16MVA/110KV/33-11KV:-a) Winding resistance test. b) IR value. c) Ratio test. d) Magnetic core balance test. e) Vector group test. f) Open circuit test. g) Short circuit test. h) Induced over voltage test. i) Power frequency dry withstand test. j) Heat run test. k) Breakdown voltage test for oil. l) Leak test for tank. m) Marshaling box scheme testing. 2. REMOTE TAP CHANGER CONTROLLER PANEL:a) Scheme Checking. b) Remote operation checking drive mechanism to RTCC. c) Checking of Annunciation. d) Remote operation checking of the Cooler Control Cubical Panel and there indications. e) Annunciation of the all transformer Auxiliary Contacts and Protective Device. f) Parallel operation of RTCC in the three modes INDEPENDENT, MASTER AND FOLLOWER. 3. MARSHALLING PANEL :-a) Checking and setting the temperature in the Oil temperature indicator,Winding temperature indicator and its contacts are Alarm&Trip are checked. b) Magnetic oil level gauge, Oil surge relay,Buchholz relay checking of all contacts. 4. DRIVE MECHANISM :-a) Scheme Checking. b) Local and Remote operation checking drive mechanism. c) Checking of Annunciation. d) Checking of indication. Show less

Gomathinayagam M Education Details

Frequently Asked Questions about Gomathinayagam M

What company does Gomathinayagam M work for?

Gomathinayagam M works for Pioneer Wincon Private Limited

What is Gomathinayagam M's role at the current company?

Gomathinayagam M's current role is Sr.Engineer Quality and Engineering.

What schools did Gomathinayagam M attend?

Gomathinayagam M attended Srm University.

Not the Gomathinayagam M you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.