Project Manager
CurrentMajor projects included:Project Manager (PM) OPF-3 Transition & Retirerment- Contract valve $1,566,116 (April 2011 – September 2011)• PM Pad B O&M of Legacy Systems & Corrosion Control- Contract valve $3,262,927 (October 2008 – September 2011). • PM ASRC Task Order Contact Technical Manager (December 2009-September 2010). • PM KSC Launch Complex 39 WLAN Communications (January 2009-September 2010). • PM Ares 1-X Roll Control System ground servicing equipment (Requirements development, Design, Implementation, Qual testing, Activation)- Contract value $536,553 (April 2007-May 2009). • PM Pad A RSS Refurbishment and Antenna Platform Mod (Design, Implementation, Activation)- Contract Value 2,613,438 (March 2002-Feburary 2007). • PM Launch Complex 41 Atlas V Autocoupler (Concept Study, Design, Manufacture/Build, Test)- Contract Value $6,090,322 (March 1999- August 2001) • PM X-33 Aft Umbilical, Hold Down System and Vehicle Positioning System Contract (January 1996- July 1999).• PMPad B CLV LH2 Mods Designs- Contract valve $231,343 (October 208 - September 2009)• PM Pad A RSS Refurbishment and Antenna Platform Modification (Design, Implementation, Activation)- Contract Value 2,613,438 (October 2003- Jauary 2006)• PM Pad A Cable Tray and Support Refurbishment and Repair (Design, Implementation, Activation)- Contract Value 1,775,121 (October 2003 - January 2005)• Authored NASA KSC GSE Fabrication IDIQ Response (May 2007) • Authored Lockheed Martin O&C Construction Management RFP. “Experiences and Past Performance” and “Project Management” (February 2007).• Authored NASA Broad Agency Announcement for Constellation Operations Concept (May-July 2006). Cryogenic requirements for the Constellation Ares I & Ares V program & facilitated a Study team to determine the best configuration solution for satisfying the storage capacity issue. • System Design Engineer for Hypergol System (February 1991- March 1999).