Hari Prasad Acharya Email and Phone Number
A committed professional 16 years in Electrical Testing, Maintenance and Troubleshooting of Plant and involved on Commissioning of projects across Power Plants. Currently working with Gulf Fluor LLC (Chemical Plant) – Abu Dhabi, UAE, since may 2015, in the capacity of Electrical Technician.
-
Electrical Maintenance TechnicianGulf Fluor Llc May 2015 - PresentAbu Dhabi Uae Daily job planning, Job distribution and supervision, Issuing permit, PM records and reporting. Regular inspection and monitoring of plant equipment (HV/LV Motor, Transformer, VFD, UPS, MCC, EDG etc.) in different locations i.e. Simon Carves, Buss Chem. Tech, R/O, DM, WWTP Plant. Testing, maintenance and participated in commissioning of 11KV ABB Switchgear, REF503/REM504/REF505 Relay, Emirates 11/0.41KV transformer, 11KV WEG Motor, Siemens Micro-master 440/420, SINAMICS S120/G120 Drive. Regulation plant maintenance and breakdown maintenance as per requirements. Fully conversant and performs work within the Permit to Work (PTW) system and the statutory Health and Safety procedures. Plan, Study and implement the replacement and upgrade of obsolete electrical equipment with the latest technology to meet the operational availability and minimize downtime. JLG 860SJ(4*4)DIESEL TELESCOPIC BOOM LIFT (28.22m) -
Plant InchargeUpper Mai Valley Hydro Power Project Dec 2014 - May 2015Ilam Nepal Site supervision and coordination, Meeting and submittal follow up. Site Preparation and Cabling, fulfillment, staging and logistics, help in Installation and site signoff Control cable and power cable laying and termination Electromechanical installation (Turbine. Generator. Transformer. UPS, VCB Breaker etc.) Preventive Maintenance and Troubleshooting of Electrical system and equipment. Control cable laying, power cable laying, high voltage cable termination and low voltage termination and testing of all VCB Transformer, UPS, testing, repair and maintenance of 132KV transmission line Liaises with contractor and constructor electrical teams to review project progress and Discuss different issues to propose rectification actions.
-
Monitoring Consultant Of Urban Solar SystemAlternative Energy Promotion Center Nov 2014 - Dec 2014Kathmandu Nepal Site supervision and coordination, Meeting and submittal follow up. Site Preparation and Cabling, fulfillment, staging and logistics, help in Installation and site signoff To checked Control cable from solar panel to several l lights and controller -
Asst Site EngineerElectrocom And Research Pvt. Ltd Aug 2014 - Nov 2014Sindhupalchok Nepal Site supervision and coordination, Meeting and submittal follow up. Control cable and power cable laying and termination Control cable laying, power cable laying, high voltage cable termination and low voltage termination and testing of all VCB, Transformer, UPS, 11Kv transmission line Survier , testing ,repair and maintenance of 11KV transmission line Electromechanical installation (Turbine. Generator. Transformer. UPS, VCB Breaker etc.) Preventive Maintenance and Troubleshooting of Electrical system and equipment
-
Asst Site EngineerAlternative Energy Promotion Center Aug 2014 - Sep 2014Kathmandu Nepal Site supervision and coordination, Meeting and submittal follow up. Site Preparation and Cabling, fulfillment, staging and logistics, help in Installation and site signoff Provide guidelines to project team for the implementation and handover with complete documentations. Assist to electromechanical installation of Turbine, Generator. Transformer and Transmission and Distribution line as and when needed. -
Plant Incharge.Nepal Hydro Developer Pvt. Ltd Jan 2014 - Aug 2014Dolakha Nepal Identify, propose and implement the modifications in Electrical power and controlSystems/operation to meet different plants operational methodology. Site Preparation and Cabling, fulfillment, staging and logistics, help in Installation and site signoff Control cable laying, power cable laying, high voltage cable termination and low voltage termination and testing of all VCB, Transformer, UPS, testing, repair and maintenance of 33KV transmission line Control cable and power cable laying and termination Electromechanical installation (Turbine. Generator. Transformer. UPS, VCB Breaker etc.) Repair and maintenance (Turbine. Generator. Transformer. UPS, VCB Breaker etc.)Preventive Maintenance and Troubleshooting of Electrical system and equipment
-
: Asst Plant InchargeSiprin Khola Hydro Power Project Jan 2013 - Jan 2014Dolakha Nepal Site supervision and coordination, Meeting and submittal follow up. Site Preparation and Cabling, fulfillment, staging and logistics, help in Installation and site signoff Electromechanical installation (Turbine. Generator. Transformer. UPS, VCB Breaker etc.) Repair and maintenance (Turbine. Generator. Transformer. UPS, VCB Breaker etc.) Preventive Maintenance of Turbine. Generator. Transformer. UPS, VCB Breaker and Troubleshooting of Electrical system and equipment.
-
Sr Electrical TechnicianLaughing Buddha Power Pvt. Ltd Jul 2012 - Jan 2013Sindhupalchok Nepal Site supervision and coordination, Meeting and submittal follow up. Site Preparation and Cabling, fulfillment, staging and logistics, help in Installation and site signoff Talking to clients to determine the nature of problems at site and resolving the issues within the given timeline. Control cable and power cable laying and termination Electromechanical installation (Turbine. Generator. Transformer. UPS, VCB Breaker etc.) Preventive Maintenance and Troubleshooting of Electrical system and equipment.
-
Lead Electrical TechnicianUnique Hydel And Electric Pvt. Ltd Jan 2011 - Feb 2012Kathmandu Nepal Industrial and residential power, light and communication designing, supervising, estimating and costing. General bid preparation and coordination with client and contractors. Testing Commissioning and maintenance of electrical equipment.
-
Electrical TechnicianUnique Hydel Company Pvt. Ltd L Jan 2006 - Feb 2008Sindhupalchok Nepal Diagnosis and remedy fault participate in the installation, maintenance and operation of Hydro Equipment such as Generator, Breakers, Substation, Transformers, Turbine, Governor and Transmission line. Involved on testing and erection of substation, transmission line, generator and plant. Switching and synchronization with transmission line.
Hari Prasad Acharya Education Details
-
Balaju School Of Enginnering And Technology Balaju Kathmandu NepalDiploma -
Patan Multiple CampusSociology -
Shree Bhubaneshwari Mv Khaira Puythan NepalHigh School
Frequently Asked Questions about Hari Prasad Acharya
What company does Hari Prasad Acharya work for?
Hari Prasad Acharya works for Gulf Fluor Llc
What is Hari Prasad Acharya's role at the current company?
Hari Prasad Acharya's current role is chemical refinery plant at Gulf Fluor.
What schools did Hari Prasad Acharya attend?
Hari Prasad Acharya attended Balaju School Of Enginnering And Technology Balaju Kathmandu Nepal, Patan Multiple Campus, Shree Bhubaneshwari Mv Khaira Puythan Nepal.
Not the Hari Prasad Acharya you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial