Haries Yolanda Email and Phone Number
I am a professional, communicative, passionate who consistently undertakes challenging project. I had experience to do significant amount of experience applying excellent project management skills in oil and gas. I also capable to execute project management plan, working method, cost analysis and bidding process procedure. I am also highly motivated, sure will work, learn hard, safety awareness, great adaptability, effective team participant, have good problem analysis, relishing new challenges with leadership role to achieve the best of my performance.I have experience participating in managing role, participated in managing several personals, especially project team, cost estimating and bidding team. I am grateful with the opportunity given to be responsible to manage the team, gave me insight and lots of good experiences. The experience of managing several projects and being directly involved is an extraordinary experience that I often go through. I am very interested in the opportunity to continue to improve my skills both in terms of project execution and managerial.
-
Senior Project EngineerPt Pertamina Hulu Rokan Jul 2024 - PresentRumbai, Riau, Indonesia -
Cost Estimating CoordinatorPt Wijaya Karya (Persero) Tbk Feb 2022 - Jul 2024Jakarta, IndonesiaOperation Marketing Department of Engineering Procurement Construction Commisioning (EPCC) Division, Main Office, Cawang – East Jakarta, Indonesia.Responsible for providing bidding proposal especially for bidding cost and leading the coordination with all related function/department for getting the competitive cost with considering the engineering aspects, construction method, vendor/subcontractor quotation, time duration, indirect cost, insurance, transportation, payment method, bidding bond, taxes, etc. As for the submitted bidding proposal is engaged in Industrial and Oil & Gas Company (already involved in 18 biddings) -
Engineering ManagerPt Wijaya Karya (Persero) Tbk Apr 2019 - Jan 2022Balikpapan, East Kalimantan, IndonesiaProject Engineering Department of EPC Site Development 2A of RDMP RU V Balikpapan Project, PT. Pertamina (Persero), Balikpapan – East Kalimantan, Indonesia.a. Provide Project Engineering Planb. Coordinate with the scheduler to provide Engineering time schedulec. Manage and monitoring to provide Detail Engineering Design (DED) for Civil, Mechanical, Piping, Electrical and Instrument i.e. basic design, specification, calculation, drawing, work method analysis, Request for Quotation (RFQ), Technical Bid Evaluation (TBE), Material Take Off (MTO) and Technical Query (TQ)d. Lead the routine coordination internal meeting with engineering team especially for Internal Discipline Check (IDC) to ensure design interfacee. Lead the coordination external meeting with Client / Representatives to accelerate engineering document approval progress and solving the engineering issuesf. Lead the external meeting with Vendor / Subcontractor to ensure the specification and constructability suitable with designg. Provide the formal letter to client due to requisiton of existing technical data related to design interface with existing facilitiesh. Manage the personel to be involved in site surveying and coordinating at site with Client / Representativesi. Involved in several testing activities for material and working testing at site or factory j. Lead to solve the problem with construction team related to design workability issues day by dayk. Lead the communication with Project Management related to contractual issuesl. Routine coordination with other department i.e. QA/QC related to quality of work and report (include internal and external punch list)m. Routine coordination with other department i.e. Project Control related to work schedule and costo. Routine coordination with other department i.e. Rigging and Lifting related to lifting plan studyp. Routine coordination with other department i.e. Commissioning related to Commissioning and Start-up activity (include PSSR) -
Engineering ManagerPt Wijaya Karya (Persero) Tbk Feb 2019 - Apr 2019Balikpapan, East Kalimantan, IndonesiaProject Engineering Department of Flood Handling of RDMP RU V Balikpapan Project, PT. Pertamina (Persero), Balikpapan – East Kalimantan, Indonesia.a. Provide Project Engineering Planb. Coordinate with the scheduler to provide Engineering time schedulec. Manage and monitoring to provide Engineering documents for Civil work i.e. Construction drawing, Work Method Analysis, Request for Quotation (RFQ), Technical Bid Evaluation (TBE), Material Take Off (MTO) and Technical Query (TQ)d. Lead the routine coordination internal meeting with engineering team especially for Internal Discipline Check (IDC) to ensure design interfacee. Lead the coordination external meeting with Client / Representatives to accelerate engineering document approval progress and solving the engineering issuesf. Lead the external meeting with Vendor / Subcontractor to ensure the specification and constructability suitable with designg. Provide the formal letter to client due to requisiton of existing technical data related to design interface with existing facilitiesh. Manage the personel to be involved in site surveying and coordinating at site with Client / Representativesi. Involved in several testing activities for material and working testing at site or factory j. Lead to solve the problem with construction team related to design workability issues day by dayk. Lead the communication with Project Management related to contractual issuesl. Routine coordination with other department i.e. QA/QC related to quality of work and report (include internal and external punch list)m. Routine coordination with other department i.e. Project Control related to work schedule and costn. Routine coordination with other department i.e. Material Control related to availability of material which required by Constructiono. Routine coordination with other department i.e. Human Capital related to employee hiring and extension of employee contract -
Engineering ManagerPt Wijaya Karya (Persero) Tbk Dec 2016 - Apr 2019Balikpapan, East Kalimantan, IndonesiaProject Engineering Department of EPC Site Development of RDMP RU V Balikpapan and New Construction Jetty Project, PT. Pertamina (Persero), Balikpapan – East Kalimantan, Indonesia.a. Provide Project Engineering Planb. Coordinate with the scheduler to provide Engineering time schedulec. Manage and monitoring to provide Detail Engineering Design (DED) for Civil, Mechanical, Electrical and Instrument i.e. basic design, specification, calculation, drawing, work method analysis, Request for Quotation (RFQ), Technical Bid Evaluation (TBE), Material Take Off (MTO) and Technical Query (TQ)d. Lead the routine coordination internal meeting with engineering team especially for Internal Discipline Check (IDC) to ensure design interfacee. Lead the coordination external meeting with Client / Representatives to accelerate engineering document approval progress and solving the engineering issuesf. Lead the external meeting with Vendor / Subcontractor to ensure the specification and constructability suitable with designg. Provide the formal letter to client due to requisiton of existing technical data related to design interface with existing facilitiesh. Manage the personel to be involved in site surveying and coordinating at site with Client / Representativesi. Involved in several testing activities for material and working testing at site or factory j. Lead to solve the problem with construction team related to design workability issues day by dayk. Lead the communication with Project Management related to contractual issuesl. Routine coordination with other department i.e. QA/QC related to quality of work and reportm. Routine coordination with other department i.e. Project Control related to work schedule and costo. Routine coordination with other department i.e. Rigging and Lifting related to lifting plan studyp. Routine coordination with other department i.e. Commissioning related to Commissioning and Start-up activity (include PSSR) -
Construction Engineering LeadPt Wijaya Karya (Persero) Tbk Jul 2012 - Nov 2016Mandau, Riau, IndonesiaProject Engineering Department of EPC North Duri Development (NDD) Area 13 Project, PT. Chevron Pacific Indonesia, Duri – Riau, Indonesia.a. Manage to provide detail construction design i.e. calculation and drawings for construction activityb. Manage to provide Standard Operating Procedure (SOP) of Construction Worksc. Review and analyze the SOP related to Safety and Quality of workd. Lead to solve the problem for construction issue day by daye. Lead the communication with Internal Department related to detail design and construction issuef. Lead the communication with Project Management related to contractual issuesg. Lead the communication with Owner / Representatives related to detail design and construction issue.h. Routine coordination with other department i.e. QA/QC related to quality of work and report (include internal and external punch list)i. Routine coordination with other department i.e. Project Control related to work schedule and costj. Routine coordination with other department i.e. Material Control related to availability of material which required by Constructionk. Routine coordination with other department i.e. Rigging and Lifting related to lifting plan studyl. Routine coordination with other department i.e. Commissioning related to Commissioning and Start-up activity (include PSSR)m. Routine coordination with other department i.e. Human Capital related to employee hiring and extension of employee contractn. Lead the coordination internal meeting with construction engineering teamo. Lead the coordination external meeting with client to discuss solving the construction work issuesp. Lead and monitor approval of marking up drawing to be used as as-built drawing referencesq. Routine site surveying and coordinating at site with Client / Representativesr. Involved as Trainer of Incident and Injury Free (IIF) Orientation Training -
Civil EngineerPt Wijaya Karya (Persero) Tbk Feb 2010 - Jun 2012Jakarta, IndonesiaEngineering Bureau of Industrial Plant Department, Main Office, Cawang – East Jakarta, Indonesia.Responsible for preparing bidding document relating to civil work such as design calculation, design drawing, calculating detail work volume and work method. As for the involved projects are as follows:a. West Point Terminal Project, Batam, PT. Batam Sentralindob. Bangko GS Tank Facility Upgrade Project, PT. Chevron Pacific Indonesiac. Central Processing Plant (CPP) Project, Gundih, PT. Pertamina EPd. Transit Terminal Development, Kotabaru – South Kalimantan, PT. Pertaminae. Relocation of Fuel Supply Facilities Development Project, Hasanuddin Airport, Makassar – South Sulawesi, PT. Pertaminaf. Fuel Supply Facilities Development Project, Lombok, PT. Pertaminag. Surya Cipta CNG Station Project, Karawang – West Java, PT. Perusahaan Gas Negara (PGN)h. Upgrading of Lubricant Production Unit Project, Jakarta, PT. Pertaminai. Relocation of LPG Depot Project, Tanjung Priok – North Jakarta, PT. Pertaminaj. PUSRI NPK Steam Fused Granulation Plant Capacity 3 x 100.000 MTPY Project, Palembang – South Sumatera, PT. Pupuk Sriwidjajak. Avtur Pipeline from Tanjung Perak to Juanda, East Java, PT. Pertaminal. Oil Palm Factory Aur Gading, Jambi, PT. PTPN VIm. Cilacap Refinery RFCC Project, Cilacap – Central Java, PT. Pertaminan. 200.000 MTPY Phosporic Acid & by Product Plan Project, Gresik – East Java, PT. Petro Jordan Abadi (PJA)o. LPG Terminal Project, Tuban – East Java, PT. Tuban LPG Indonesiap. Submarine Pipeline (SPL) Balongan Project, Balongan, PT. Pertaminaq. Suaran Upgrade I and Lati Upgrade V Project, Berau – East Kalimantan, PT. Berau Coalr. Tie-in Well 29 & 29A and Well 30 & 30A to Steam Gathering System PLTP Dieng, Wonosobo – Central Java, PT. Geo Dipa Energis. Crude Oil Pipeline Tempino – Plaju, South Sumatera, PT. Pertamina Gast. North Duri Development (NDD) Area 13 Project, Duri – Riau, PT. Chevron Pacific Indonesia -
Civil EngineerPt Wijaya Karya (Persero) Tbk Aug 2009 - Jan 2010Deli Serdang, North Sumatra, IndonesiaProject Engineering Department of EPC New Aviation Fuel Supply Facilities Development Project, PT. Pertamina, Kualanamu – North Sumatera, Indonesia.a. Design of Equipment Foundation such as Avtur Tank Foundation, Degas Tank Foundation, Fire Water Tank Foundation, etc.b. Design of Road (Flexible and Rigid Pavement) and Fencec. Design of Building such as Fire Pump House, Office Building, Temporary Office for Construction Team, etc.d. Design of Drainage Systeme. Design of Hydrant Pit and Valve Chamber -
Civil EngineerPt Wijaya Karya (Persero) Tbk Apr 2009 - Jul 2009Jakarta, IndonesiaEngineering Bureau of Industrial Plant Department, Main Office, Cawang – East Jakarta, Indonesia.Responsible for preparing bidding document relating to civil work such as design calculation, design drawing, calculating detail work volume and work method. As for the involved projects are as follows:a. Coal Dryer Project, PT. Titan Mining Indonesiab. LPG Pressurized Project, Panjang Lampung Depot, PT. Pertaminac. LPG Pressurized Project, Tanjung Sekong – Banten, PT. Pertaminad. Water flood Pilot Injection Facility Project, Lapangan Bunyu, PT. Pertamina EPe. Oil Palm Factory Sei Mangke Project, Medan, PTPN IIIf. Terminal Project, Lirik Field, PT. Pertaminag. Coal Handling Facility Project, Muara Tiga Besar, PT. Bukit Asamh. Coal Port Barge Loading Project, Tarahan, PT. Bukit Asami. Crude Oil Pipe Route Project, Tasikmalaya – Ujung Berung, PT. Pertaminaj. Refinery & KCP Complex Project, Pulau Laut – South Kalimantan, PT. Golden Hope -
Civil EngineerPt Wijaya Karya (Persero) Tbk Oct 2008 - Apr 2009Gresik, East Java, IndonesiaProject Engineering Department of Rehabilitation & Flexible Operation (RFO) PF-II Plant Project, PT. Petrokimia Gresik, Gresik – East Java, Indonesia.a. Design of Foundation Modification such as Compressor Plant Air Foundation, Motor / Gearbox Foundation, Phosphoric Pump Foundation, Scrubber Pump Foundation, Ammoniac Tank Foundation, etc.b. Design of Structure Modification such as Dehumidifier Storage, Duct Scrubber Platform, Electrical Control Room, Pipe Rack, Process Building, Dozometer Room, etc.c. Calculate Material Take Off (MTO) of Civil Work such as concrete, steel structure, grating, acid proof brick, etc.d. On the Job Training (OJT) Paper : “Design Optimization of Acid Retaining on RFO PF II Plant Project”
Frequently Asked Questions about Haries Yolanda
What company does Haries Yolanda work for?
Haries Yolanda works for Pt Pertamina Hulu Rokan
What is Haries Yolanda's role at the current company?
Haries Yolanda's current role is Sr. Project Engineer | Facility Engineering | WK Rokan | PHR Riau.
Not the Haries Yolanda you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial