Principal Engineer
CurrentPrincipal Engineer (Hydraulics) for Detailed Design of Mujahidin Hydropower ProjectPrincipal Engineer (Hydraulics) Daral khwar Rehabilitation and Restoration ProjectWorked as Design Specialist for Detailed Engineering Design of Rongkong Multipurpose Dam in Indonesia. The Dam is CFRD 108m and with Installed Hydropower Capacity of 30 MW.Worked as Hydraulic Design Engineer at Feasibility Study and Detailed Engineering Design of Murunj Dam, Rajanpur, Pakistan.Worked as Hydraulic Design Engineer Consultancy services for Construction design, Construction supervision and contract administration of Diamer Basha Dam Project 4500 MW.