Hassan Mousa

Hassan Mousa Email and Phone Number

Automation Department Manager at Hydro Plants Generation Company @
Hassan Mousa's Location
Egypt, Egypt
About Hassan Mousa

Although my experience - more than 25 years- is concentrated in hydro-power plant as control system maintenance engineer, but I'm confident and able to work in any other site containing DCS.My experience transcends DCS to all automation,control system and instrumentation.My current job title is "electrical department manger" so I've very good knowledge of all electrical equipment.Since I have long period experience, so I prefer to join a consultant company.

Hassan Mousa's Current Company Details
Hydro Plants Generation Company

Hydro Plants Generation Company

Automation Department Manager at Hydro Plants Generation Company
Hassan Mousa Work Experience Details
  • Hydro Plants Generation Company
    Electrical Department Manager
    Hydro Plants Generation Company Jul 2012 - Present
    Aswan, Egypt
  • Hpgc
    I&C Division Manager
    Hpgc Jul 2001 - Dec 2009
    Egypt
    • Prepare , develop and following the execution of the annual plant for Preventative maintenance and time Schedule Scope of work for the following :• ABB Symphony/Harmony (former Bailey NETWORK90 & INFI90) Control Systems as a DCS.• All PLC Systems and Equipment like Motor Drivers (MMV) Or EEPROMS Controllers (SIEMENS PLC).• Electronic Speed Governor System.• Passenger and Freight Elevators.• Water Level Measurement System• Telephone Systems BAPX• Review the faults report and take the necessary action to prevent repetition of faults • Supervised upgrading DCS System Project for the PP executed by ABB ( PGP4 , Composer 4.3 )
  • Hpgc
    I&C Engineer
    Hpgc Jan 1997 - Dec 2000
    Egypt
    • execution of Preventative maintenance , site tests , repair the faults of the control circuit and arrange the time Schedule Scope of work for BAILEY NETWORK90 control system equipment, speed governor system, other PLC equipment, Level Measurement devices, communication system and Elevators.• During this period that followed the end of guarantee period I was interested in studying the control sequences of all Esna Plant Equipment, specially those linked with the control system like switchgear, general auxiliaries (shaft seal, HAVC , drainage and dewatering systems and fire fighting ... etc) and unit auxiliaries.• Prepare the faults report and take the necessary action to prevent repetition of faults
  • Hydro-Power Generation Company - Hpgc
    Operation Engineer
    Hydro-Power Generation Company - Hpgc Apr 1993 - Dec 1996
    Egypt
    Operation of Esna Hydro-power plant on shift rotation bases, ensuring the nomination for the production of power by Egyptian National Dispatch Center is fulfilled.Responsible of operation and supervision of all the plant equipment that consists of six bulb turbines 14.28 MW each, 132 KV substation and all plant auxiliaries.
  • Army
    Electronics Officer Engineer
    Army Sep 1990 - Mar 1993
    Egypt
    Operation and maintenance for some electronic equipment

Hassan Mousa Education Details

Frequently Asked Questions about Hassan Mousa

What company does Hassan Mousa work for?

Hassan Mousa works for Hydro Plants Generation Company

What is Hassan Mousa's role at the current company?

Hassan Mousa's current role is Automation Department Manager at Hydro Plants Generation Company.

What schools did Hassan Mousa attend?

Hassan Mousa attended Assiut University.

Not the Hassan Mousa you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.