AeroLeads people directory · profile

Hector Gonzalez Email & Phone Number

COO at Aalberts IPS Americas at Aalberts integrated piping systems
Location: United States 11 work roles 2 schools
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
COO at Aalberts IPS Americas
Location
United States
Company size

Who is Hector Gonzalez? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Hector Gonzalez is listed as COO at Aalberts IPS Americas at Aalberts integrated piping systems, a with 242 employees, based in United States. AeroLeads shows a matched LinkedIn profile for Hector Gonzalez.

Hector Gonzalez previously worked as Regional Operations Director at Grundfos and Plant Director Multi Division Site at Grundfos. Hector Gonzalez holds Master’S Degree, Ma from Egade Business School.

Company email context

Email format at Aalberts integrated piping systems

This section adds company-level context without repeating Hector Gonzalez's masked contact details.

Aalberts integrated piping systems

Review company-level records connected to Hector Gonzalez before choosing the right outreach path.

Profile bio

About Hector Gonzalez

Engineer with over 25 years of experience in Operations, Manufacturing, Toyota Production System (TPS), Lean Manufacturing, Maintenance, Visual Management, Shop Floor Control and Quality.

Current workplace

Hector Gonzalez's current company

Company context helps verify the profile and gives searchers a useful next step.

Aalberts integrated piping systems
Aalberts Integrated Piping Systems
COO at Aalberts IPS Americas
hilversum, north holland, netherlands
Employees
242
AeroLeads page
11 roles

Hector Gonzalez work experience

A career timeline built from the work history available for this profile.

Coo At Aalberts Ips Americas

Current

United States

Responsibilities and achievements:• Responsible of IPS-A Operations (3 Factories, 5DC’s).• Stablished a new Organization structure (APUs)• Improve OTIF from 70% to 93%.• Past due reduction -75%.• Stablished a problem-solving mindset.• Stablished a CI structure and methodology• Implemented and proposed objectives aligned with Group strategy.• Responsible of Region footprint.• Responsible for annual budgets and implementation of cost benefit analysis.• P&L accountability.• Full interaction with Sales.• SIOP Implementation.• EBITA improve from 5.1% to 10.5%.

May 2024 - Present

Regional Operations Director

United States

Responsibilities and achievements:• Responsible of WU Operations in Americas Region (Multi Plants).• Responsible of business and grow strategy for WU Operations in America Region.• Implemented and proposed objectives aligned with Group strategy.• Responsible of Region footprint.• Responsible for drawing up, co-coordinating and revising the Company’s policies within the frame of Group policies.• Responsible of proposals for long term plans of the Company as part of the long-range plans / budgets of the Group.• Responsible for building up and maintaining the effective organization of the Company.• Responsible for annual budgets and implementation of cost benefit analysis.• Responsible for developing Operational Culture and Routines (Solving Problems, Kaizens routines, Quality and EHS assurance, etc.) • KPI Control (EHS, Cycle Time, WIP, Scrap Reduction, LCP, Capacity, Turnover).• Responsible for developing and ensuring that the processes are carried out according to the Procedures and Plans.• Implemented Lean Manufacturing and TPS (GPS).• Implemented Facility Management, Visual Management and Shop Floor Control.• Responsible for establishing Operation Stability and Manufacturing Scheme.• Developed New Work Culture.• Implemented TPM.

Dec 2022 - May 2024

Plant Director Multi Division Site

United States

Responsibilities and achievements:• Responsible of Operations (Multi Divisions).• Responsible of business and grow strategy.• Implemented and proposed objectives aligned with Group strategy.• Responsible for drawing up, co-coordinating and revising the Company’s policies within the frame of Group policies.• Responsible of proposals for long term plans of the Company as part of the long-range plans / budgets of the Group.• Responsible for building up and maintaining the effective organization of the Company.• Responsible for annual budgets and implementation of cost benefit analysis.• Responsible for developing Operational Culture and Routines (Solving Problems, Kaizens routines, Quality and EHS assurance, etc.) • KPI Control (EHS, Cycle Time, WIP, Scrap Reduction, LCP, Capacity, Turnover).• Responsible for developing and ensuring that the processes are carried out according to the Procedures and Plans.• Implemented Lean Manufacturing and TPS (GPS).• Implemented Facility Management, Visual Management and Shop Floor Control.• Responsible for establishing Operation Stability and Manufacturing Scheme.• Developed New Work Culture.• Implemented TPM.

Jun 2022 - Dec 2022

Plant Director

Mexico

Responsibilities and achievements:• Implemented and proposed objectives aligned with Group strategy.• Responsible for drawing up, co-coordinating and revising the Company’s policies within the frame of Group policies.• Responsible of proposals for long term plans of the Company as part of the long-range plans / budgets of the Group.• Responsible for building up and maintaining the effective organization of the Company.• Responsible for annual budgets and implementation of cost benefit analysis.• Responsible for developing Operational Culture and Routines (Solving Problems, Kaizens routines, Quality and EHS assurance, etc.) • KPI Control (EHS -25%, Cycle Time -15%, WIP -4%, Scrap Reduction -15%, LCP +15%, Capacity +25%, Turnover -18%).• Responsible for developing and ensuring that the processes are carried out according to the Procedures and Plans.• Implemented Lean Manufacturing and TPS (GPS).• Implemented Facility Management, Visual Management and Shop Floor Control.• Responsible for establishing Operation Stability and Manufacturing Scheme.• Developed New Work Culture.• Implemented TPM.

May 2018 - May 2022

Production Manager

Pittsburgh Pa

Responsibilities and achievements:• Implemented Operational Strategy (Visual Management, Coordination Mechanisms, Organizational Proposal, Operational Routines Establishment, Development Methods and Work Instructions, Layout Definitions, Quality System Development, Define and implement Manufacturing Schemes).• Developed Operational Culture and Routines. (Solving Problems Thinking, Kaizens routines, Quality and EHS assurance, etc.) • KPI Control (EHS -10%, Cycle Time -12%, WIP -7%, Scrap Reduction – 5%, LCP +10%, Capacity +20%)• Responsible for developing and ensuring that the processes are carried out according to the Procedures and Plans.• Responsible for the Best in class technology investment (Commissioning and installed, VPD dry oven, Dry room, Environment Control System in Winding and Sizing).• Implemented Lean Manufacturing and TPS.• Implemented Facility Management and Shop Floor Control.• Responsible for establishing Operation Stability and Manufacturing Scheme.

May 2016 - Apr 2018

Operation Manager

Monterrey Area, Mexico

Responsibilities and achievements:• Implemented Operational Strategy (Coordination Mechanisms, Organizational Proposal, Operational Routines Establishment).• KPI Control (EHS -20%, Variable Costs -10%, Cycle Time -20%, WIP -50%, Scrap Reduction – 5%, LCP +13%, Capacity +40%)• Responsible for ensuring that the processes are carried out according to the Procedures and Plans.• Implemented One Piece Flow.• Implemented Kaizens Culture.• Developed Work Shops.• Responsible for establishing and promoting continuous improvement projects.• Developed Operator skills using the Toyota Talent System.• Responsible of Supplying.• Developed and implemented a Training Process, 50% learning curve reduction.• Established Facility Management and Shop Floor Control.• Responsible for establishing the Operation Stability and Manufacturing Scheme.

Jan 2014 - Jan 2016

Operation Head

Channai Tamil Nadu India

Responsibilities and achievements:• Implemented Operational Strategy (Coordination Mechanisms, Organizational Proposal, Operational Routines Establishment, Development of Methods and Work Instructions, Layout Definitions, Quality System Development, Manufacturing Scheme).• Responsible for sharing and implementing best practice activities and processes between Mexico and India. Know How Transfer.• Implemented employee skills certification and development system.• Implemented Continuous Flow in Distribution Transformers Production Line (Cycle Time -50%, WIP -25%). • KPI Control (EHS -80%, Cycle Time - 15%, Quality -27% DPMU, WIP -45%, Variable Costs -10%, Capacity +20%, LCP +10%).• Responsible for New Capital Investment needed for an optimal plant operation.• Responsible for ensuring that the processes are carried out according to the procedures and plans.• Responsible for establishing and promoting continuous improvement projects.• Implemented TPS (Toyota Production System).• Responsible for Innovation and Technology Development (New Products Manufacturing Development: Electric transformer 400Kv, Foil and Compressor Bonding Process).• Responsible for the implementation of XIGNUX work culture (CTX…TQM, TPS, Shop Floor Control and Visual Management).

Jan 2011 - Dec 2013

Operations Manager Ehv Transformers

Apodaca N.L. Mexico

Responsibilities and achievements:• Responsible for New facility start up.• Developed a new Manufacture Culture that manufactures transformers up to 500Kv.• KPI Control (EHS -70%, Cycle Time -10%, Quality -15% DPMU, Variable Cost -10%, Capacity +25%). • Responsible for New Capital Investment needed for an optimal plant operation.• Responsible for implementing an Operational Strategy (Product classifications, rules, cycles, macro flow, micro flow, layout etc.).• Responsible for ensuring that processes are carried out according to the plans.• Responsible for the staff development through education programs and training. (Experts Building program)• Established and promoted continuous improvement projects. • Implemented TPS (Toyota Production System).• Responsible for Innovation and Technology Development (New Product Manufacturing Development: Electric transformer 500Kv,1000MVA).• Established business strategies. (Vision, Mission, current business differentiators and gaps vs. best in class)• Established Operation Stability and Manufacturing Scheme.

Nov 2009 - Dec 2010

Operations Manager Industrial Transformers

Apodaca N.L.

Responsibilities and achievements:• KPI Control (EHS -80%, Cycle -20%, Quality -70% DPMU, Variable Cost -15%, Capacity +35%).• Responsible of Capital Investment Strategy.• Responsible for the Budget building process.• Established Staff development through education programs and training.• Responsible for Facility Management and Shop Floor Control.• Established and developed innovation and Technology (New Product Manufacturing Development: Electric transformer 69Kv, 15MVA).• Responsible for ensuring that the processes are carried out according to the procedures and plans.• Established the Operation Stability and Manufacturing Scheme.

Aug 2004 - Oct 2009

Factory Leader

TANK SHOP POWER TRANSFORMERS 320 Hourly, 15 Salary Reporting to: Operations Manager • KIP (EHS -80% OSHA, Output +30%, Cycle -20%, Quality -70% DPMU, WIP -10%).• Capital Investment strategy planning.• Budget building process.• Staff development through education programs and training.. • Facility Management.

Aug 2000 - Aug 2004

Manufacturing Leader

TANK SHOP POWER TRANSFORMERS 250 Hourly, 7 Supervisors Reporting to: Factory Leader • Facility Production Planning. • KIP (EHS- 15%, Productivity + 10%, WIP +70%).• Generate the best benefits in quality process, quantity and cost.

May 1998 - Aug 2000
Team & coworkers

Colleagues at Aalberts integrated piping systems

Other employees you can reach at aalberts-ips.com. View company contacts for 242 employees →

2 education records

Hector Gonzalez education

Master’S Degree, Ma

Egade Business School
FAQ

Frequently asked questions about Hector Gonzalez

Quick answers generated from the profile data available on this page.

What company does Hector Gonzalez work for?

Hector Gonzalez works for Aalberts integrated piping systems.

What is Hector Gonzalez's role at Aalberts integrated piping systems?

Hector Gonzalez is listed as COO at Aalberts IPS Americas at Aalberts integrated piping systems.

Where is Hector Gonzalez based?

Hector Gonzalez is based in United States while working with Aalberts integrated piping systems.

What companies has Hector Gonzalez worked for?

Hector Gonzalez has worked for Aalberts Integrated Piping Systems, Grundfos, Pennsylvania Transformer Technology Inc., Prolec Ge, and Prolec Ge India.

Who are Hector Gonzalez's colleagues at Aalberts integrated piping systems?

Hector Gonzalez's colleagues at Aalberts integrated piping systems include Amber Hurst, Sharon Ragusin, Antony Hirst, Leanette Lockhart, and Rudy Raley.

How can I contact Hector Gonzalez?

You can use AeroLeads to view verified contact signals for Hector Gonzalez at Aalberts integrated piping systems, including work email, phone, and LinkedIn data when available.

What schools did Hector Gonzalez attend?

Hector Gonzalez holds Master’S Degree, Ma from Egade Business School.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Hector Gonzalez you were looking for.

View similar profiles