Manufacturing Engineer
Current● Led design review meetings with suppliers for FA2 (14.2 GWh) and FA3 (14.8 GWh) projects, focusing on degas & final sealing, final inspection, and wrapping processes.● Prepared comprehensive RFI and RFQ documents, detailing both process and equipment specifications.● Developed FAT checklists for formation, degas, final sealing, ACIR, OCV, final inspection, and wrapping equipment.● Conducted FAT for three lines of final inspection and wrapping for the FA2 block (14.2 GWh, 56.6 PPM).● Reviewed technical documents from suppliers, including DFMEA, technical agreements, BOM lists, MC charts, P&IDs, and operational manuals.● Defined test procedures and performed Measurement System Analysis (MSA) for all measurement equipment during FA2 FAT.● Led standardization projects, including the combined FAT checklist for cylindrical and prismatic cells, technical agreements, global protection parameters, and design processes.● Led a brownfield retrofit project to introduce new products into the line.● Verified proof of concept through prototype testing and designed equipment for high-volume manufacturing.