- Pre-commissioning and Commissioning Database Preparation- Project System/Sub-system breakdown, delimitation and definition- Instrument equipment operational test procedures preparation- Instrument Pre-commissioning and Commissioning execution- Fire & Gas System.- Gas Compressor.- ICCS ( Cause & Effect and Logic Matrix ).- PLC ( Programable Logic Control )- DCS ( Distributed Control System )- Telemetry.- Measuring Unit.- Computer (AutoCAD, MS Office, Troubleshooting, and Installation).
-
Electrical/Instrument SuperintendentBp Aug 2020 - Jun 2023West Papua, IndonesiaBP TANGGUH EXPANSION PROJECTPart of Actemium Oil & Gas team, organize the team to perform the electrical commissioning activities, prepare required commissioning documents, permit to works and job risk assessment prior to execute the job.As the Operating Authority is generally represented a member of Commissioning Team authorized by the Commissioning Manager. Responsible the following: • Ensure that all the precautions stated in the PTW are in place before work commence.• With Isolation Authority ensuring to demonstrate the integrity of isolation prior commence the work and prove dead.• Authorising all PTW certificates within the site area of responsibility.• Sign all categories of PTW within the area of competency and ensuring that the appropriate hazards and controls have been identified and mitigations are in place for the planned task.• Attend proactively the Daily PTW Coordination Meeting.• Ensuring that regular worksite inspections are carried out during shift to confirm that the activity ongoing is within the task description and that all mentioned control measures remain in place.• Ensuring that the appropriate level of risk assessment has been carried out for the task.• Sign the PTW continuation and extension.• Cooperate with COMPANY representative for operation activities to ensure all control measures are in place when interaction with operational activities is foreseen.• Ensure energy isolations are applied and removed in the correct sequence.• Responsible to ensure the integrity of isolations are proved before issuing the permit.• Responsible for ensuring that the correct level of isolation is applied if required and ensuring that the relevant Discipline Superintendent/Supervisor has signed and countersigned the Permit to Work.• Ensuring specific gas testing requirements have been performed -
Sr Commissioning EngineerPertamina Hulu Energi Onwj Ltd Jun 2020 - Aug 2020East Java Offshore, IndonesiaCOMMISSIONING & SYSTEM COMPLETION PROJECT• As part of Berca Engineering team, responsible to organize the preparation and execution of commissioning activities• Prepare all Commissioning procedures and OTP, including (ICAPS) Pre-commissioning status index and the Commissioning technical database, the handover dossiers / certification, punch list control, planning and progress.• Ensure the Contractors deliverables are produced in an acceptable format and content in a timely manner.• To provide assistance to the Commissioning Lead during the detailed preparation of the Commissioning planning, in order to optimise the schedule by maximising the onshore Commissioning this keeping offshore Commissioning activities to a minimum.• Identify and address all interface issues with other project packages with respect to commissioning.• To attend the execution of FATs at manufacturer Premises• Review and comment EPCC contractor Commissioning spare parts, First Fill, Special Tools..• Ensure that all interface activities are managed and controlled correctly.• Witnessing the pre-commissioning activities performed by the Contractor, ensuring that Project requirements and the OPERCOM methodology are fulfilled.• Review, organize and supervise all commissioning activities. • Organize the commissioning preparations prior to the execution of an OTP.• Review the pre-commissioning dossiers• Prepare the commissioning dossiers • Contribute to punch list clearance.• Supervise the OTP execution to ensure that all technical, and planning information is properly recorded, collected and available for inspection/reference as required by Company policies.• Report immediately any unexpected events which may affect the commissioning of the plant or the start up. • Ensure the equipment during and after Commissioning is suitably preserved and maintained by Contractor. -
Commissioning CoordinatorPertamina Hulu Energi Onwj Ltd Mar 2019 - Jun 2020East Java Offshore, IndonesiaCOMMISSIONING & SYSTEM COMPLETION PROJECT• As part of Titis Sampurna team, responsible to organize the preparation and execution of commissioning activities• Prepare all Commissioning procedures and OTP, including (ICAPS) Pre-commissioning status index and the Commissioning technical database, the handover dossiers / certification, punch list control, planning and progress.• Ensure the Contractors deliverables are produced in an acceptable format and content in a timely manner.• To provide assistance to the Commissioning Lead during the detailed preparation of the Commissioning planning, in order to optimise the schedule by maximising the onshore Commissioning this keeping offshore Commissioning activities to a minimum.• Identify and address all interface issues with other project packages with respect to commissioning.• To attend the execution of FATs at manufacturer Premises• Review and comment EPCC contractor Commissioning spare parts, First Fill, Special Tools..• Ensure that all interface activities are managed and controlled correctly.• Witnessing the pre-commissioning activities performed by the Contractor, ensuring that Project requirements and the OPERCOM methodology are fulfilled.• Review, organize and supervise all commissioning activities. • Organize the commissioning preparations prior to the execution of an OTP.• Review the pre-commissioning dossiers• Prepare the commissioning dossiers • Contribute to punch list clearance.• Supervise the OTP execution to ensure that all technical, and planning information is properly recorded, collected and available for inspection/reference as required by Company policies.• Report immediately any unexpected events which may affect the commissioning of the plant or the start up. • Ensure the equipment during and after Commissioning is suitably preserved and maintained by Contractor. -
E/I Commissioning EngineerPertamina Hulu Energi Onwj Ltd Aug 2017 - Mar 2019West Java Province, IndonesiaCOMMISSIONING & SYSTEM COMPLETION PROJECT• As part of Titis Sampurna team, Responsible organize the preparation and execution of commissioning activities• Prepare all Commissioning procedures and OTP, including (ICAPS) Pre-commissioning status index and the Commissioning technical database, the handover dossiers / certification, punch list control, planning and progress.• Ensure the Contractors deliverables are produced in an acceptable format and content in a timely manner.• To provide assistance to the Commissioning Lead during the detailed preparation of the Commissioning planning, in order to optimise the schedule by maximising the onshore Commissioning thus keeping offshore Commissioning activities to a minimum.• Identify and address all interface issues with other project packages with respect to commissioning.• To attend the execution of FATs at manufacturer Premises• Review and comment EPCC contractor Commissioning spare parts, First Fill, Special Tools..• Ensure that all interface activities are managed and controlled correctly.• Witnessing the pre-commissioning activities performed by the Contractor, ensuring that Project requirements and the OPERCOM methodology are fulfilled.• Review, organize and supervise all commissioning activities. • Organize the commissioning preparations prior to the execution of an OTP.• Review the pre-commissioning dossiers• Prepare the commissioning dossiers • Contribute to punch list clearance.• Supervise the OTP execution to ensure that all technical, and planning information is properly recorded, collected and available for inspection/reference as required by Company policies.• Report immediately any unexpected events which may affect the commissioning of the plant or the start up. • Ensure the equipment during and after Commissioning is suitably preserved and maintained by Contractor. -
Instrument Commissioning SuperintendentPertamina Hulu Energi Wmo Nov 2015 - Mar 2017Madura OffshoreEPCI-1 PHE 12, PHE 24 and CPP 2 Platform and Pipeline Project• As part of Teknika Regulindo Asia & Gunanusa Utama team, Responsible organize the preparation and execution of commissioning activities• Prepare all Commissioning procedures and OTP, including (ICAPS) Pre-commissioning status index and the Commissioning technical database, the handover dossiers / certification, punch list control, planning and progress.• Ensure the Contractors deliverables are produced in an acceptable format and content in a timely manner.• To provide assistance to the Commissioning Lead during the detailed preparation of the Commissioning planning, in order to optimise the schedule by maximising the onshore Commissioning thus keeping offshore Commissioning activities to a minimum.• Identify and address all interface issues with other project packages with respect to commissioning.• To attend the execution of FATs at manufacturer Premises• Review and comment EPCC contractor Commissioning spare parts, First Fill, Special Tools..• Ensure that all interface activities are managed and controlled correctly.• Witnessing the pre-commissioning activities performed by the Contractor, ensuring that Project requirements and the OPERCOM methodology are fulfilled.• Review, organize and supervise all commissioning activities. • Organize the commissioning preparations prior to the execution of an OTP.• Review the pre-commissioning dossiers• Prepare the commissioning dossiers • Contribute to punch list clearance.• Supervise the OTP execution to ensure that all technical, and planning information is properly recorded, collected and available for inspection/reference as required by Company policies.• Report immediately any unexpected events which may affect the commissioning of the plant or the start up. • Ensure the equipment during and after Commissioning is suitably preserved and maintained by Contractor.
-
Electrical/ Instrument Commissioning EngineerPertamina Hulu Energi Onwj Ltd May 2013 - Sep 2015Jakarta, IndonesiaCOMMISSIONING & SYSTEM COMPLETION PROJECT• As part of the Teknika Regulindo Asia and TITIS Sampurna team, Responsible to organize the preparation and execution of the commissioning activities of his discipline• Prepare all Commissioning procedures and OTP, including (ICAPS) Pre-commissioning status index and the Commissioning technical database, the handover dossiers / certification, punch list control, planning and progress.• Ensure the Contractors deliverables are produced in an acceptable format and content in a timely manner.• To provide assistance to the Commissioning Lead during the detailed preparation of the Commissioning planning, in order to optimise the schedule by maximising the onshore Commissioning thus keeping offshore Commissioning activities to a minimum.• Identify and address all interface issues with other project packages with respect to commissioning.• To attend the execution of FATs at manufacturer Premises• Review and comment EPCC contractor Commissioning spare parts, First Fill, Special Tools..• Ensure that all interface activities are managed and controlled correctly.• Witnessing the pre-commissioning activities performed by the Contractor, ensuring that Project requirements and the OPERCOM methodology are fulfilled.• Review, organize and supervise all commissioning activities. • Organize the commissioning preparations prior to the execution of an OTP.• Review the pre-commissioning dossiers• Prepare the commissioning dossiers • Contribute to punch list clearance.• Supervise the OTP execution to ensure that all technical, and planning information is properly recorded, collected and available for inspection/reference as required by Company policies.• Report immediately any unexpected events which may affect the commissioning of the plant or the start up. • Ensure the equipment during and after Commissioning is suitably preserved and maintained by Contractor. -
Instrument & Control System TechnicalTotal Feb 2013 - May 2013East Kalimantan, IndonesiaFIELD OPERATION MAINTENANCE PROJECT• Prepare all commissioning procedures and OTP, including (ICAPS) commissioning technical database, handover dossiers/certification, punch list control, planning and progress.• Responsible for managerial, technical authority and safety of Instrumentation and Control System commissioning on the project. • Responsible to provide technical reference of all matter related to Instrumentation and control system commissioning and providing solution of technical issues in coordination with engineering, start-up team and FO maintenance department.• To ensure the safety on commissioning activities, good coordination with other parties involved and in respect with company regulations. -
Instrument Commissioning SupervisorStar Energy Sep 2012 - Dec 2012Natuna Offshore, IndonesiaKF BOOSTER GAS COMPRESSOR PROJECT• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permit• Supervise and witnessing of contractor Pre-Commissioning activity.• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc • Raise and clear punch list item and report any non conformity to superintendent.• Validate commissioning test sheet before superintendent approval.• Provide daily reporting as Superintendent requirements.• Start-up assistance during performing the start-up. -
Instrument Commissioning SupervisorConocophillips Oct 2011 - Dec 2011Natuna Offshore, IndonesiaBAWAL PROJECT• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permit• Supervise and witnessing of contractor Pre-Commissioning activity.• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc • Raise and clear punch list item and report any non conformity to superintendent.• Validate commissioning test sheet before superintendent approval.• Provide daily reporting as Superintendent requirements.• Start-up assistance during performing the start-up. -
Instrument Commissioning SupervisorPttep Jun 2011 - Jul 2011Banten, IndonesiaBONGKOT PROJECT• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permit• Supervise and witnessing of contractor Pre-Commissioning activity.• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc • Raise and clear punch list item and report any non conformity to superintendent.• Validate commissioning test sheet before superintendent approval.• Provide daily reporting as Superintendent requirements.• Start-up assistance during performing the start-up. -
Instrument Commissioning SupervisorHess Corporation Oct 2010 - Jun 2011Madura Offshore, IndonesiaUJUNG PANGKAH OFFSHORE PHASE II CPP & AUP PROJECT• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permit• Supervise and witnessing of contractor Pre-Commissioning activity.• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc • Raise and clear punch list item and report any non conformity to superintendent.• Validate commissioning test sheet before superintendent approval.• Provide daily reporting as Superintendent requirements.• Start-up assistance during performing the start-up. -
Instrument Commissioning SupervisorPt Pgn Lng Indonesia Oct 2008 - Sep 2010Sumatra- Jambi, IndonesiaJABUNG GAS BOOSTER STATION PROJECT• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permit• Supervise and witnessing of contractor Pre-Commissioning activity.• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc • Raise and clear punch list item and report any non conformity to superintendent.• Validate commissioning test sheet before superintendent approval.• Provide daily reporting as Superintendent requirements.• Start-up assistance during performing the start-up. -
Instrument Commissioning SupervisorTotal Aug 2008 - Oct 2008Middle East, YamanKHAIRIR BASEMENT PHASE 1-CCU PERMANENT GAS COMPRESSOR PROJECT• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permit• Supervise and witnessing of contractor Pre-Commissioning activity.• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc • Raise and clear punch list item and report any non conformity to superintendent.• Validate commissioning test sheet before superintendent approval.• Provide daily reporting as Superintendent requirements.• Start-up assistance during performing the start-up. -
Instrument CommissioningTotal Jul 2008 - Aug 2008East Kalimantan Province, IndonesiaTUNU PHASE 11 SOUTH OFFSHORE PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
Instrument CommissioningTotal Dec 2007 - Jun 2008East Kalimantan Province, IndonesiaTATUN OILY WATER TREATMENT ( OWT ) PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
Instrument CommissioningTotal Jan 2007 - Dec 2007East Kalimantan, IndonesiaSISI NUBI PHASE 3 OFFSHORE MWPN, MWPS AND WPN2 PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
Instrument CommissioningTotal Jul 2006 - Jan 2007East Kalimantan Province, IndonesiaSISI NUBI PHASE 1 OFFSHORE SNPS PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
SupervisorPt Bukit Muria Jaya Sep 2005 - May 2006Karawang, West Java, Indonesia• Ensure all instrument activities are executed safely• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permitPM#2 PROJECT• Supervise and witnessing of contractor Pre-Commissioning activity.• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc
-
Instrument CommissioningTotal Sep 2004 - Jul 2005East Kalimantan Province, IndonesiaPECIKO PHASE 4 SENIPAH ONSHORE PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
Instrument CommissioningTotal Nov 2003 - Sep 2004Balikpapan, East Kalimantan, IndonesiaPECIKO PHASE 4 OFFSHORE SWP-G, SWP-E & SWP-K PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
Instrument CommissioningTotal Aug 2003 - Nov 2003Balikpapan, East Kalimantan, IndonesiaPECIKO PHASE 3 ONSHORE PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
Electrical CommissioningPt Pln (Persero) Apr 2003 - Jul 2003Kediri, East Java, IndonesiaKE3 / LOT 3 - KEDIRI 500KV SUBSTATION PROJECT• Ensure all Electrical activities are executed safely• Function Test Electrical Equipment• Function Test System Protection -
Instrument CommissioningTotal Aug 2002 - Mar 2003Balikpapan, East Kalimantan, IndonesiaTUNU PHASE 8 OFFSHORE NCP & OWT PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas) -
EngineeringTotal Mar 2002 - Apr 2002Balikpapan, East Kalimantan, IndonesiaENGINEERING PROJECT• Mark Up Drawing GTS-A, GTS-B, GTS-C, GTS-D, GTS-F & GTS-G -
Construction & CommissioningVico Indonesia Nov 2001 - Mar 2002• Responsible to manage small execution team and organize the work in respect with company standing instruction and work permit, ensuring the safety and work is performed in professional manner respecting to company specification. • Supervise yard and site work execution as describe in the work permit• Supervise and witnessing of contractor Pre-Commissioning activity.VICO MUTIARA PROJECT• Manage small team of technician to ensure that the work identified in the work permit is performed in professional manner in respect with company specification.• Organize the work and the team to get the job done with quality and avoid waste time: manpower, logistic, tools, authorization, spare parts, documents etc -
Control System EngineerUnocal Indonesia Company Mar 2001 - Nov 2001UNOCAL YAKIN PROJECT• Ensure all instrument activities are executed safely• Function Test Instrument Equipment• Function Test ICC Cause & Effect (USD,PSD,ESD) and Logic Matrix ( Fire and Gas)• Execution and Modify Program PLC
Heru Sumarsono Skills
Heru Sumarsono Education Details
-
Institut Teknologi Sepuluh Nopember SurabayaElectrical Engineering -
Smun 12 Surabaya
Frequently Asked Questions about Heru Sumarsono
What is Heru Sumarsono's role at the current company?
Heru Sumarsono's current role is Electrical/Instrument Superintendent at ACTEMIUM.
What schools did Heru Sumarsono attend?
Heru Sumarsono attended Institut Teknologi Sepuluh Nopember Surabaya, Smun 12 Surabaya.
What skills is Heru Sumarsono known for?
Heru Sumarsono has skills like Commissioning, Dcs, Gas, Offshore Drilling, Plc, Control Systems Design, Engineering, Energy, Testing, Metal Fabrication, Water Treatment, Energy Industry.
Not the Heru Sumarsono you were looking for?
-
-
-
-
Heru Sumarsono
Indonesia
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial