Hesham Elgazzar

Hesham Elgazzar Email and Phone Number

Senior Structural Engineer, Project Manager @ Tecne Speri Bridge Designers
Rome, IT
Hesham Elgazzar's Location
Rome, Latium, Italy, Italy
Hesham Elgazzar's Contact Details

Hesham Elgazzar personal email

About Hesham Elgazzar

Senior Structural Engineer with great passion for innovative, holistic designs of challenging structures, especially bridges. Diverse experience of more than 10 years gathered from managing, coordinating, and being involved in a number of high profile and megaprojects for transport infrastructure, aviation, energy and real estate in 8 countries/ 4 continents as part of leading international consultants and contractors. Holds a Licentiate of Engineering degree in dynamics of bridges for High-Speed Railways on top of a M.Sc. in Infrastructure Engineering & B.Sc. in Structural Engineering. Have acquired practical construction field experience during working on several multi-million construction projects in aviation, energy, and high-end/tourism real estate sectors. Pursuing a career as a Senior Structural/Bridge Engineer with inter-cultural management, optimal problem solving, team collaboration and time management along with rapid skills development as my core strengths.

Hesham Elgazzar's Current Company Details
Tecne Speri Bridge Designers

Tecne Speri Bridge Designers

View
Senior Structural Engineer, Project Manager
Rome, IT
Employees:
39
Hesham Elgazzar Work Experience Details
  • Tecne Speri Bridge Designers
    Senior Structural Engineer, Project Manager
    Tecne Speri Bridge Designers
    Rome, It
  • Tecne Speri Bridge Designers
    Senior Bridge Engineer
    Tecne Speri Bridge Designers Apr 2023 - Present
    Rome, Latium, Italy
    Working as a Senior bridge Engineer as part of the joint Engineering consultant between Speri S.p.A. and Tecne - Autostrade d'Italia.Rehabilitation and strengthening of bridges:Executing the bridges and viaducts as part of the national Recovery and resilience Plan or "Piano Nazionale di Ripresa e Resilienza (PNRR)". The scope is focused on checking and reviewing the capacity of the bridges and viaducts according to the current codes as a primary step. It also includes proposing and executing the remedies, rehabilitation and strengthening interventions to achieve the required capacities for all the bridges and viaducts to achieve a resilient and sustainable national highway network.Rail Baltica High-Speed Railway:Independent design review and calculation check of bridges and viaducts of the Rail Baltica high speed railway project (as a partner with 3TI progetti). Mainly occupied with long span bridges with complex geometry and design aspects, performing full design review and calculation check of the bridges at all design stages, developing all required analysis, calculation models and verifications to guarantee the robustness and integrity as required for signing off the bridges.
  • Btp Infrastrutture Spa
    Structural Engineering Manager, Project Manager
    Btp Infrastrutture Spa May 2022 - Feb 2023
    Rome, Latium, Italy
    Iraqi 1200 KM long High-Speed Railway and Highway:Involved in the preparation of the structures part of the prefeasibility and feasibility study of ca.1200 km long Highway-Railway major infrastructure project to connect the New Grand Al Faw port in the South of Iraq to the Turkish border in the north.The project included preliminary, detailed design, prequalification and management of contractors.The 17 billion USD contract is performed along with high-profile subconsultants in Italy and Iraq as well as holding bi-monthly meetings with the Iraqi authorities to coordinate and approve every detail of the project.The major national project aims to develope and modernize the Iraqi Transport network to support and strengthen the socio-economic development plans of the country including the opening of the Grand Al Faw port in 2028.Bridges for Nasiriyah road Interchanges:Performed the preliminary and detailed design of bridges for 2 major road interchanges elevating the heavily trafficked highway above the local roads. The prestressed precast bulb tee beams of the superstructure of the simply supported 5-span bridges are supported by 4 piers and 2 abutments resting on piled foundations.The fast-track project involved close collaboration with the contractor and few rounds of adjustments and optimization to reach the most optimum solution that satisfies the client, the municipality of Nasiriyah and the contractor.Al-Zaytoun steel arch Bridge in Nasiriyah:Project Manager for the design review of the Al-Zaytoun Bridge crossing over the Euphrates River with a Steel arch main span of 186 m along with 10 smaller spans of 25 m.The design review process included very preliminary collaboration with the designer/contractor to improve the quality of the design and the overall project to meet the requirements of the adopted American standards.Prepared the structural clauses several successful bids for projects in Italy in collaboration with other cosultants.
  • Rendel Limited
    Senior Structural Engineer
    Rendel Limited May 2021 - Feb 2022
    London, England, United Kingdom
    Performed independent Category 3 design checks for the Viaducts and Culverts along the £98 billion HS2 project as part of a joint venture with Jacobs for contract C2C3. Developed FE models and spreadsheets to structurally analyse the Structures globally and locally applying all possible loading and checking the capacity of all the elements of the structure under all possible loading effects. Issued comments and liaised with the designer about failures and possible adjustments in order to certify the design for each Structure.Performed Independent design checks of complex bridges as part of the proof Engineering of the A$4.8 billion major Road interchange between West Connex and Sydney airport. Developed FE model for 8 spans, curved, skewed composite bridge with 6 Steel box girders to check the capacity of the elements of the road bridge under all possible loading effects.
  • Saitec
    Senior Structural Engineer, Project Manager
    Saitec Oct 2018 - Apr 2021
    Madrid, Madrid, Spain
    Led the structural design of several infrastructure projects between Madrid, Bilbao, Stockholm, and Lund offices for multi-million design and design-build contracts.Acted as project manager for bridge design and maintenance projects towards commissioning authorities.Prepared technical documents and study of bridge alternatives for the bidding process of several projects for commissioning authorities.Supported the structural teams, as well as other teams, within the company in the management, design and production of documents of all projects in Sweden to help establish Saitec in the market.Prepared design manuals and guidelines for the projects in Sweden to adapt the design methods and delivered documents to the Swedish market and fulfil the design codes and codes of practice Sweden.
  • Afry
    Structural Engineer
    Afry Jul 2016 - Aug 2018
    Stockholm, Sweden
    Designed several infrastructure and bridge projects as part of design and design-build contracts.Worked on early stage assessments and structural analysis of large-scale infrastructure projects.Performed dynamic effects assessment and analysis of bridges for normal and high-speed railway projects e.g. The east link high-speed railway in Sweden. Optimized calculations sheets and standardized calculations for more efficient design process.Independently reviewed the structural design of several projects including the new slussen masterplan in Stockholm and several projects for Trafikverket and Stockholm City.Supervised graduation projects of students in collaboration with the bridge department at the royal institute of technology KTH.Assisted in teaching finite element analysis courses for the bridge department at the royal institute of technology KTH.
  • Kth Royal Institute Of Technology
    Researcher Phd Student
    Kth Royal Institute Of Technology Nov 2013 - Jun 2016
    Stockholm, Sweden
    Analyzed the dynamic responses of Bridges for High-Speed Railway with a case study bridge from the Bothnia-line railway in the middle of Sweden. Studied the effects of soil-structure interaction, along with other factors, on the Bridge's dynamic behavior through comparing results from the field measurements with those of the finite element models.Performed extensive Finite element modelling of the bridge and surrounding soil using Abaqus and studied many modelling alternatives to reach the most optimal, accurate and time efficient 3-D model to simulate the real behavior of the bridgePerformed the field measurements as part of the KTH lab team acquiring field experience regarding the measurement of the accelerations of the bridge under the controlled forced vibration of a hydraulic load shaker designed at KTH lab.Used ARTeMIS and Matlab programs to reconstruct the real behavior of the bridge and compare it to the 3-D FE models.Assisted in teaching several finite element courses for bachelor and master’s degree classes.
  • Åf Reinertsen Sverige Deal Ab
    Structural Engineer
    Åf Reinertsen Sverige Deal Ab Sep 2012 - Nov 2013
    Stockholm, Sweden
    Performed the structural design of several infrastructure and bridge projects as part of design and design-build contracts in Sweden and Norway.Optimized calculations sheets and standardized calculations for more efficient design process.
  • Tiba Integrated For Construction
    Construction Engineer
    Tiba Integrated For Construction Mar 2010 - Jul 2010
    Sharm El Sheikh, South Sinai, Egypt
    Supervised the concrete, steel, timber and finishing works of all residential unts, buildings and swimming pools of the Savanna Beach resort to complete the turn-key construction contract.Managed, planned, and supervised the works, deliveries, and billing of the subcontractors on the construction site.
  • Archirodon Group N.V.
    Construction Engineer
    Archirodon Group N.V. Oct 2008 - Feb 2010
    Cairo, Egypt
    Supervised the construction of the steel structure for the 2*350 MW Cairo west power plant.Technically supported the steel structure teams of the subcontractors through the production, delivery and approval of the design and drawings of the project.
  • Contrack Watts, Inc.
    Construction Engineer
    Contrack Watts, Inc. Jul 2007 - Aug 2008
    Alexandria, Egypt
    Supervised the construction works of the C130 maintenance hangers in Cairo west airbase with the consultancy of the US army corps of Engineers.Supervised the civil, piling, pretensioned steel reinforcement and concrete construction works for the Al Marassi Beach clubhouse as well as the rest of the 10 km beach-front long resort.Managed, planned, and supervised the works, deliveries, and billing of the subcontractors on the construction site.

Hesham Elgazzar Skills

Steel Structures Structural Analysis Finite Element Analysis Mathcad Construction Structural Dynamics Microsoft Office Sap2000 Concrete Abaqus Matlab Lusas Brigade Plus Bridge Design

Hesham Elgazzar Education Details

Frequently Asked Questions about Hesham Elgazzar

What company does Hesham Elgazzar work for?

Hesham Elgazzar works for Tecne Speri Bridge Designers

What is Hesham Elgazzar's role at the current company?

Hesham Elgazzar's current role is Senior Structural Engineer, Project Manager.

What is Hesham Elgazzar's email address?

Hesham Elgazzar's email address is el****@****ail.com

What schools did Hesham Elgazzar attend?

Hesham Elgazzar attended Kth Royal Institute Of Technology, Kth Royal Institute Of Technology, Ain Shams University, Nefertari International Schools.

What are some of Hesham Elgazzar's interests?

Hesham Elgazzar has interest in Armutsbekämpfung, Wissenschaft Und Technologie, Kunst Und Kultur, Menschenrecht, Umwelt, Ausbildung, Katastrophen Und Humanitäre Hilfe.

What skills is Hesham Elgazzar known for?

Hesham Elgazzar has skills like Steel Structures, Structural Analysis, Finite Element Analysis, Mathcad, Construction, Structural Dynamics, Microsoft Office, Sap2000, Concrete, Abaqus, Matlab, Lusas.

Not the Hesham Elgazzar you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.