President
CurrentCurrently providing HVAC evaluation services, and using those findings for project development for construction for a local 30 story condominium tower that performs with 1200 tons of air-cooled chillers and primary/secondary distribution system piping system. Energy savings performance calculations along with a life cycle for the new equipment is being.