President
CurrentCurrently providing HVAC evaluation services, and using those findings for project development for construction for a local 30 story condominium tower that performs with 1200 tons of air-cooled chillers and primary/secondary distribution system piping system. Energy savings performance calculations along with a life cycle for the new equipment is being developed to identify actual savings to be seen with equipment upgrades. Controls and pool heating equipment will be completely revamped as well that will show significant cost impacts via water and electric utility savings.Providing BIM Coordination for new 5 story, 149 room themed hotel utilizing REVIT and AUTOCAD MEP for coordinating engineering documents. NAVISWORKS is being used for developing clashes between trades and resolving those issues between disciplines to minimize RFI’s and conflicts.Experience in engineering services for local food processing plant to include Ammonia refrigeration system evaluation, and system troubleshooting, steam boiler system engineering, and Chilled water plant engineering upgrades.Experience in Chiller plant upgrades and replacements, Chiller change outs, troubleshooting mechanical systems, Thermal Storage system upgrades, and HVAC evaluation reports for problem systems.Experience in high end residential and light commercial plumbing and HVAC engineering systems, working with manufacturers for the latest and greatest equipment coordination.Have vast experience in engineering mechanical, plumbing, and fire protection systems for local schools, commercial, industrial, and residential facilities to include BIM (Building Information Modeling - REVIT, AUTOCAD MEP, NAVISWORKS), engineering and energy calculations, building code review, life cycle cost analysis, equipment selections, and coordination with multiple disciplines for project completion.