Draftsman (Architect)
Bangladesh
Preparation of Master Plan in UTM Coordination and Local Coordination System. Preparation of Architectural & Structural Drawing for HSIA Terminal 3 Building.The total area of 253959 m2, including the basement, Ground Floor, 1st Floor & 2nd Floor. Coordination with the Electrical & Mechanical Team for MEP Services. Pile & Pile Cap Setting out Shop Drawing for Terminal 3, Multilevel Car Parking, Export Cargo, Import Cargo & Utility Building. Provide Each Pile Coordination Point for the Construction of pile Work. Preparing Contractor’s Facility Plan, like Contractor & consultant site office, Security Check Point, Guard House Etc. Door Window Layout Plan, Schedule & Hardware set code of Terminal 3, ICT, ECT, MCP & other Utility Building. Brick wall Setting out Shop Drawing of Terminal 3 building. Finishing Drawing Like Floor Finishes, wall finishes, Finishing Demarcation Drawing, Stone Cladding Drawing. (RCP) Reflected Ceiling Plan Drawing of Terminal 3 Building.