Hossam Omar Email and Phone Number
Having a large experience for 33 years in managing mega projects for all construction activities in Oil & Gas filed In Egypt and Gulf countries Keeping in touch with the modern management skills and field construction updates in the industry with high impact to team members to achieve the organizational strategies with our client’s satisfaction also as Program Director in oil & gas is multifaceted and demanding, encompassing responsibilities that span the entire lifecycle of a program. These include Strategic Vision & Alignment, Developing and maintaining a clear program vision that aligns with the broader business goals of the company.
Petrojet
View- Website:
- petrojet.ca
- Employees:
- 3969
-
Project ManagerPetrojet Jan 2024 - PresentAsyut, EgyptManage construction of 2 projects simultaneously in same timeproject number 1: construction of SALLAM Water intake for Assiut oil refining company ASORC company as a client including the following work.- construction of main pump room.- construction of Nile jetty with extension of 60 m in Nile River.- construction of chlorination building.- construction of utility building as generator building, substation building, and warehouse building.- construction of HDPE 900 mm diameter pipeline with length of 15 km.Project number 2: Construction of AL-IMAN hospital for critical cases for the Egyptian ministry of health the project is to execute a hospital on area of 2000 m2 5 floors including all construction activities for all Desplaines till complete delivery for hospital to the client. -
Project DirectorPetrojet Jan 2023 - Jan 2024Saudi ArabiaNeom project water transmission system from oxagon to gayal - Saudi Arabia Client: Neom, BechtelDuties As Project Director• Act as the representative of the chairman of the board of Directors of the company in the project to make all urgent decisions to finish the project according to the schedule while providing all urgent requirements and maintaining the quality of work according to the standard specifications of the client while maintaining a safe working environment in accordance with the instructions of the Occupational Safety and health system.• The value of the project is 8 billion Saudi riyals, and it consists of delivering water through a concrete culvert with length 100 km long and width of 20 meters and a height of 4 meters, inside which there are two water lines, the diameter of each line is 2000 mm, with all mechanical and electrical connections being done, with the construction of a giant water pumping station.• Study all interfaces in our project with other projects inside the program and solve all interfacing problems with all stakeholders.• Study the logistic plan with all parties specially the transportation strategy for all 2000 mm diameter pipes with length of 18 meters along the project route from Neom port to site.• Ensure always work with safety and sustainability along the project time frame to meet the client requirements and standards. -
Project ManagerPetrojet Apr 2018 - Jan 2023Damietta, Dumyat, EgyptJetty Upgrade for DCHC - Egypt Client: Damietta Container and Cargo Handling CompanyDuties As Project Manager:• The value of the works is 1.5 billion Egyptian pounds, which is the rehabilitation of the existing berth with an increase in depth from 14.5 meters to 17 meters, knowing that the berth was created in 1984, that is, in a dilapidated condition and consists of flat sheet piles.• the job was cut a front beam of the berth to pieces the weight of one peace 55 tons and the dimensions of the front beam length 1 km and width 7.5 meters and Hight 2 meters and was lifted off-site. • And also, implementation of a network of bored piles behind the sheet piles for the possibility of deepening in front of sheet piles to reach a depth of 17 meters to receive ships and huge containers. -
Project ManagerPetrojet Aug 2014 - Aug 2018IraqZubair North New Degassing Station Project - IraqClient: Samsung, South Oil Company AS Project Manager:• The project is a gas separation plant in the state of Iraq, the general contractor of the project is Samsung and the owner of the project is South Oil Company, and the field of work was completely all civilian workers in the project with the installation of various equipment, pipe works of different diameters, drainage and water networks in the station and Dike works around the tanks area with two types concrete and sand forms. -
Civil Work ManagerPetrojet Oct 2013 - Aug 2014Saudi ArabiaRABIGH Phase ll Petrochemical Project - Saudi ArabiaClient: Petrofac, Petro RabighAS Civil Work Manager:• Execution of all civil work inside the plant as follow:- Tanks.- Water treatment station.- Operational and non-operational buildings.- Equipment installation.- Air cooler installation. -
Construction ManagerPetrojet Apr 2009 - Oct 2013Port Said, Bur Sa'Id, EgyptPort Said East Container Terminal Phase 2 Project-EgyptClient: Sues Canal Container Terminal, Royal HasKoning, Pacer consultingAS Construction Manager:• The project consisted of yard works with dimensions of 1200 meters length and 600 meters width for the second stage of the East Port Said container port, for Suez Canal container terminal as a client.• Soil replacement works with a depth of 7 meters, complete dewatering of the project, work on layers with a thickness of 25 cm on the entire surface of the project.• infrastructure works of water networks, drainage networks, rainwater drainage networks, electricity networks of low voltage and medium voltage, interlock works, route marking after completion of all works, with the completion of the entire project and preparing it to receive containers and ships with all service necessary.• Execution for all buildings such as workshops, mosque, administrative buildings, power station buildings, substation and warehouses. -
Construction ManagerPetrojet Jul 2008 - Apr 2009Ra’S Gharib, Al Bahr Al Ahmar, EgyptScimitar Projects (Ras Gharib)-EgyptClient: General petroleum company GPC, Scimitar EgyptAS Civil Work Manager:• The project was the construction of 3 tanks for crude petroleum oil inside the General Petroleum Company in Ras Gharb area, including all civil works from soil replacement, pouring ordinary concrete, reinforced concrete, pouring the bases for tanks, insulation, mastic and all the necessary civil workers, as well as the work of the tank itself from welding, assembly, pipe networks and installation of measuring equipment. -
Construction ManagerPetrojet Jul 2006 - Jul 2008QatarRas Laffan Olefins Project-QatarClient: Qatar Petroleum, TechnipAS Civil Work Manager:• The project is within the port of Ras Laffan in the State of Qatar. The main contractor is the Technip France company and the owner is Qatar Petroleum Company.• The activities executed within the project as follow:- Spherical tank foundation.- All underground work(water-electrical-drainage)- Pipeline for the whole project.- Water treatment. -
Construction ManagerPetrojet Aug 2005 - Jul 2006EgyptGasco Projects-EgyptClient: Egyptian Natural gas Company GascoAS Civil work Superintendent:• Manage and follow all the civil work activities for Gas facilities station for the Egyptian Natural Gas company. -
Civil SuperintendentPetrojet Aug 2004 - Aug 2005Port Said, Bur Sa'Id, EgyptGuidance towers-Port Said-EgyptClient:AS Civil work Superintendent:• Construction of a fully concrete tower with a height of 45 meters was poured continuously for 10 work days with a slip form system.• The tower attached with an administrative building on two floors along the body of the tower.• The foundation of the tower over a bored piles with a depth of 60 meters.• the project includes all civil and mechanical works, fire networks, feeding networks and all electrical works. -
Civil SuperintendentPetrojet Mar 2003 - Aug 2004Damietta, Dumyat, EgyptLNG Plant Project-Port Said-EgyptClient: UGDC, EnppiAS Civil work Superintendent:• Manage and responsible for all civil work activities for petrochemical plant with the united gas derivative company as a client and under Enppi company as a main contractor.• Construction of pipe rack.• Industrial building.• Tanks and utilities area.• Spherical tanks. -
Construction ManagerPetrojet Mar 2001 - Mar 2003Port Said, Bur Sa'Id, EgyptMarine Works for Suez Canal Co.-Port Said-EgyptClient:AS Civil Work Manager:• Construction of all marine work such as:• Free boat jetty at Raswa area in two sides of Port Said and Port Fouad.• fishing port at port said.• including all maritime marine work activities for the client Suez Canal Authority -
Project ManagerLibyan Construction Companies Jul 1991 - Mar 2001LibyaMany Projects at LibyaClient: Ministry of works and infrastructure of the state of LibyaAS Project Manager:• Management of many construction projects, including schools, hospitals, administrative buildings, sewage networks, water networks, residential buildings, roads and infrastructure projects in the state of Libya.
Hossam Omar Education Details
-
Very Good
Frequently Asked Questions about Hossam Omar
What company does Hossam Omar work for?
Hossam Omar works for Petrojet
What is Hossam Omar's role at the current company?
Hossam Omar's current role is Project manager, Project director at PETROJET Company.
What schools did Hossam Omar attend?
Hossam Omar attended Port Said University.
Who are Hossam Omar's colleagues?
Hossam Omar's colleagues are Shady Gomaa, Amin El Beheiry, Khattak Adnan, Ahmed Abdo, Ibrahim Rehan, Mahmoud Abdel-Razik, Kaka Amazigh.
Not the Hossam Omar you were looking for?
-
-
-
-
1actglobe.net
-
1barclays.com
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial