Sse - Et (Controls)
CurrentOverhaul of 4 PODs 6th Gen from Valaris DS 7 Drill ShipPODs fully disassembled, inspected, re-assembled and testedSupport to mechanical team during all project Electronic checks performed on all SEA wardware such as PLC modules, switches, power supply, breakers, isolators, sensors, wiring, and others) Carried out tests on CCSVs, PTs, conectors to make sure they are in accordance with operation requirementsPressure and vacuum test of Comp Chamber as well connectors (Flowmeter, Stack Wellbore and Riser Inc)Function test carried out with the use of BOP Simulator. SOAK test performed at the POD shop onboard as well