Hussein Mahfouz Mohamed personal email
- Valid
1)Technical Office Engineer (13 Years)2)Cost Estimator (12 Years)3)Procurement (8 Years)4)Technical Office Site Manager (4 Years)5)Supplier QC. Engineer (4 Years)6)QC. Engineering (3 Years)7)Site Manager (2 Years)8)Owner Eng. Support (2 Years)9) Projects Manager (2 Years)10) Familiar with (ASHRAE Standards , SMACNA Standards, )11) Familiar with (NFPA Standards)13)Familiar with codes (ASME, DIN, ....etc.) .14)HVAC load calculation by HAP Software .15)Review the MEP Design .
Al Tabarak For Engineering & Contracting
-
Executive ManagerAl Tabarak For Engineering & Contracting Sep 2018 - PresentCairoFollow up the implementation of fire, air conditioning and medical gases for the following sites:1) Benha Health Insurance Hospital2) Fayom Health Insurance Hospital3) Hospital 175 beds in the new city of Qena4) Benha Educational Hospital5) Fayoum Faculty of Nursing6) Police hospital for recruits in Shorouk City7) Institute of Arab Research and Studies - 6 October8) National Bank of Egypt Stores9) Sheikh Zayed Mall
-
Mechanical Engineer In General Department Of Projects In Prince Sattam Bin Abdulaziz Universityجامعة الأمير سطّام بن عبدالعزيز Dec 2015 - Mar 2018Prince Sattam Bin Abdulaziz University1) Review and Approved the Design Dwg., Bill of Qty., Specification & Calculation for all mechanical activities (HVAC, Plumbing & Fire) for more than 15 Buildings ( Colleges, celebration hall, Sports facilities, Central Ware House, Administration Building, Safety & Security Building, Operation And Maintenance Bldg. & Hospital )2) Review and Approved the Materials Submittals 3) Review and Approved the Supplier 4) Design of mechanical activities (HVAC, Plumbing & Fire) for some building (Masjid , Security Rooms, Ware House 5) Follow up the progress of projects 6) Revising periodic invoices for contractors 7) Member of the committees for the receipt of works from contractors 8) Hold meetings as owner's representative with consultants and contractors 9) Follow-up maintenance contractor at the university, and make the necessary reports in case of problems of maintenance work at the university ( Fire fighting system, HVAC & Ventilation system, Water Supply system, Plumbing system, Gases system) . -
Mechanichal Eng. Site ManagerEl Soumly For Contracting Establishment Building Jun 2013 - Jun 2015Saudi ArabiaWork as director of the mechanical work of the buildings Deans Umm Al Qura University in Mecca for two months, then move on to work as director of the mechanical work of the buildings of central services at King Faisal Ahsa and workable included the following: -1) Review the drawings before submission to the consultant.2) coordination between the HVAC system, fire fighting system, Plumbing system, Civil and Architectural to avoid conflicts during execution.3) Make submittal materials and drawing to the consultant.4) orders for the supply of raw materials to the site.5) Follow-up the erection of the work and delivered to the consultant.
-
Technical Office & Tendering Engineer .Energya Steel Solutions Jul 2007 - May 201398 Hassan Ma'Moun St. – Naser City - Cairo. Factory Industrial Zone A 6 East 1My work included the next :-1) Follow up tow project first one in Egypt 10 of Ramadan city & Second in Sudia (Rabigh City ) for Workshop drawing, bill of quantity, specifications & quotations from subcontractors (HVAC, Fire Fighting & Plumbing) .2) Review The Work Shop Drawing from Consultant & Bill of Quantity before start construction .3) Preparation the Bill of Quantity for some item like Piping, Fitting, Valves, Duct, Split Unite, ……etc. 4) Cost Estimated for the installation works in the Project ( Piping, Valves, Site Weld Tanks, Silo, Duct, Steel Structure, Equipment's, ….etc.) .5) And I'm estimated cost for More than one hundred and fifty project . -
Technical Office & Tendering Engineer .Hassan Allam Holding Dec 2004 - Jun 2007Yehia Zakaria St. Industrial Zone, Behind Sheraton Heliopolis .I'm working at Allam Sons in tow position The first position is Technical Office Site Manager in the smart village site about one and half year for :- 1) Preparing the Submittal to Consultant .2) Contact with a supplier for receiving material .3) Follow up & review the workshop mechanical erection drawing & composite drawing .4) Preparing the as belt drawing for plumping , fire fighting & HVAC .5) Follow up the productivity .6) director of the following position :-i) Material control engineer.ii) Planning engineer.iii) Cost Control engineer .iv) Draftsman .Second position from 2006 to 2007 in the Head office for estimated tendering cost manager, man-hour, supervision & material supply and I'm already estimated cost for the next project :-1) Suize cement Project (Ramlya project) .2) Beni Suef Line 2 cement project .3) Sinai Grey cement project .4) Zafarana 80 MW power plant project .5) Underground pipe for nubaria power plant project .6) United Sugar Company of Egypt (USCE) Refinery Project pipe & equipment .7) QENA II cement project .8) New cairo water treatment plant .9) Al_Nouran Beet Sugar Factory & Refinery . 10) Under ground pipe for Sidi Krir Power Station 11) Under ground pipe for Al_atef Power Station -
Supplier Qc. Engineer For Water Treatment EquipmentHorse Engineering Co Dec 2002 - Nov 2004My work inspection & receive the next items :-1) bearing .2) Beams (IBE, HEA, HEB, etc.….) .3) Fabrication equipment .4) Pipe & pipe fitting (steel & C.I) .5) Work shop equipment .6) Mechanical tools .7) Over head crane .8) Valves (safety, NR, Gate) .9) Pen stock {Gate (C.I. Galvanized St. , St.St )}
-
Technical Office Engineer .Kolaly Engineering Co. Oct 1998 - Aug 200215 Nadi El Seid Street - Mohandeseen - Giza – Egypt .My work included the next :-1) Followed up the effluent treatment plant erection in (Quena newsprintpaper project)2) Followed up the process water treatment plant erection in (Quenanewsprint paper project)3) Review the erection Dwg. & compare with Civil Dwg.4) Quantity survey Steel Structure (beam, column, bolts, painting) &Piping (pipe, pipe fitting, insulation) .5) Followed up the steel structure (production, shipping, priority list &erection) .6) Electromechanical erection invoice for (Quena newsprint paperproject) .7) Cost estimation for the next project tender :-a) Pvac plant – Vinavil project (Suiz) (Steel Structure, Pipe & Pipe Fitting,Booster Pump, Weight Bridge, Vessel Tanks) supply & erection .b) San Stifano Complex project (Water Softener, Pumps) supply &erection.c) Broiler grand parents & parents farms – Wadi al-natron (St. Structure,Cladding, Insulation) supply & erection .d) Toyo Project (Heat insulation & Painting) supply & erection .e) AUCC Cement Plant, Libya (Equipment erection )8) Follow up the equipment supply (submittal & Prices) for (Weightbridge, piping, pipe fitting, valves, pumps, insulation & cladding) .9) Work shop drawings for 14 tanks reference to ASME code .10) Workshop Dwg. For Metal Deck & Cladding Pvac Egypt project &ExxonMobil Egypt project .11) AS-BUILT DRAWINGS
-
Supplier Quality Control Engineer.Babcock & Wilcox Oct 1996 - Jul 1998Manial Sheha - Giza - Cairo.I am working in Supplier Quality Control Engineering for (Check the material,a condition of the welding process, dimension, sandblast, painting) together with AndrewKilburn (B&W’s Canadian QA Source Inspector/Lead Auditor) in FerrometalcoCompany (from October 13, 1996, to April 30, 1998) for the manufacturing of BoilerSteel Structure, for construction of the Sidi Krir & Ayoun Moussa Thermal PowerStation Plants unit 1&2 about (18) month and after the finish, it’s project come back toBabcock & Wilcox Egypt and work with vessel tanks. -
Quality Control Engineer.United Technical & Engineering Co.(Utec) Dec 1995 - Oct 199610 Th. Of Ramadan City - Egypt.Working with the QA Manager to make new Documentation such asNonconformance report, Receiving report, Daily time report & Inspection CheckSheet etc. Developing new inspection techniques and recording time on route sheets,to improve overall performance and efficiency of inspections.Measuring & Inspection equipment used :-(1) 3-Coordinates Measuring Machine.(2) Profile Projector Measuring Machine.(3) Surface Finish Measuring Machine.(4) All manual measuring Tools.
-
Production Engineer On Production Line .Mobica Oct 1994 - Nov 1995Km 28 - Cairo Alexandria Road - Giza.PRODUCTION ENGINEER ON PRODUCTION LINE . -
Quality Control Engineer (Military Service).Arab International Optronics (Aio) Jan 1993 - Sep 1994El-Salam City - Cairo.Working in the mechanical inspection department using the following measuringequipment :-(1) 3-Coordinates Measuring Machine.(2) Profile Projector Measuring Machine.(3) Digital Height Gauge Measuring Machine.(4) All manual measuring Tools.In the QA office working inspection check & inspection planing sheets on theComputer (a formtool program) also using input-output data from the network.
Hussein Mahfouz Mohamed Education Details
-
Al-Zhar University.Mechanical Engineering
Frequently Asked Questions about Hussein Mahfouz Mohamed
What company does Hussein Mahfouz Mohamed work for?
Hussein Mahfouz Mohamed works for Al Tabarak For Engineering & Contracting
What is Hussein Mahfouz Mohamed's role at the current company?
Hussein Mahfouz Mohamed's current role is Executive Director of the Department of Mechanics.
What is Hussein Mahfouz Mohamed's email address?
Hussein Mahfouz Mohamed's email address is ma****@****ail.com
What schools did Hussein Mahfouz Mohamed attend?
Hussein Mahfouz Mohamed attended Al-Zhar University..
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial