Ibrahim Tok

Ibrahim Tok Email and Phone Number

Principal Engineer/Owner @
Ibrahim Tok's Location
Türkiye, Turkey
Ibrahim Tok's Contact Details

Ibrahim Tok work email

Ibrahim Tok personal email

n/a
About Ibrahim Tok

Ibrahim Tok is a Principal Engineer/Owner at https://projehesap.com/. He possess expertise in project management, government contracting, ipa projects, fidic, project estimation and 24 more skills. He is proficient in English.

Ibrahim Tok's Current Company Details
https://projehesap.com/

Https://Projehesap.Com/

Principal Engineer/Owner
Ibrahim Tok Work Experience Details
  • Https://Projehesap.Com/
    Co-Founder, Principal Structural Engineer
    Https://Projehesap.Com/ Jan 2012 - Present
    Proje Hesap Construction Engineering Consulting; Arıbaş Metal, Erciyes Energy, Guven Machinery, Befesa Silvermet Projects.Performed structural calculations,Prepared contract documents, technical specifications, material take offs, technical drawings.Conducted review meetings, made presentations on calculation methods to Engineering Teams of clients.Inspected and managed site activities of contractors as clients’ consultant.
  • Ubm Uluslararasi Birlesmis Musavirler Musavirlik Hizmetleri A.Ş
    Engineer'S Representative
    Ubm Uluslararasi Birlesmis Musavirler Musavirlik Hizmetleri A.Ş Jun 2016 - Aug 2018
    Göbeklitepe, Şanlıurfa, Turkey
    Inspected Contractor’s Works in compliance with Contract, Tender Documents, FIDIC Conditions of Contract, Technical Specifications, Design Drawings and Bill of Quantities,Inspected laboratory tests and review in test results,Inspected and reviewed in Contractor’s material submittals and evaluation of delivered materials on site,Responded to Contractor’s RFIs,Represented Engineer during meetings between Contractor, Employer, Ministry Officials, End Users and other participants of the projects,Inspectied and reviewed calculations and drawings prepared by Contractor regarding steel and reinforced concrete structures,Inspected and reviewed in Contractor’s Work Programme. Prepared Monthly Progress Reports, Financial-Actual Progress Reports, Interim Reports, Completion Reports.Reviewed and assessed Contractor’s variation order calculations, time claims.
  • Ubm Uluslararasi Birlesmis Musavirler Musavirlik Hizmetleri A.Ş
    Senior Supervisor Engineer
    Ubm Uluslararasi Birlesmis Musavirler Musavirlik Hizmetleri A.Ş Jun 2015 - Jun 2016
    Giresun, Turkey
    Supervised the construction site activities, quality procedures, HSE activities in accordance with FIDIC conditions of Contract.Evaluated Contractor’s Work Schedules, Construction Plans, HSE Hand Book, Method Statements and Material Submittals.Inspected Contractor’s Structural Steel Fabrication Facility, supervision on the sampling and testing of Structural Steel Elements in accordance with technical specifications.Attended on-site meetings with Contractor; assigning, coordinating and reviewing the technical work of the Contractor’s staff.Reviewed and advised on Contractor’s claims.
  • Pm Group
    Senior Engineer Supervisor
    Pm Group Jun 2012 - Sep 2014
    Construction of Erciyes TDZ, Total Area: 12.000 m2, Total Value: €4.07 millionSupervised construction site activities, quality procedures, HSE activities in accordance with FIDIC conditions of Contract.Evaluated Contractor’s Work Schedules, Construction Plans, HSE Hand Book, Method Statements and Material Submittals.Monitored Contractor’s work programme and progress, quality of works, site safety, equipment/material orders and deliveries, environmental issues. Provided advice on corrective actions in accordance with the conditions of contract when necessary.Attended Weekly Site Meetings with Contractor and Monthly Progress Meetings with Government Officials and Technology Development Centre’s (End User) representatives.Reviewed and recommended approval of interim and final payments to the Contractor.
  • Yda Group
    Technical Office Engineer
    Yda Group Jun 2010 - Jun 2012
    Kayseri, Turkey
    Forum Kayseri Shopping Center, Total Area: 150.000 m2Prepared Construction Schedule.Reviewed progress against planned, cost and budget control and manpower scheduling.Evaluated bids for price, bidder’s ability to supply materials and services within requested time frames, technical suitability, quality and conformance to project specifications.Company BREEAM (Building Research Establishment Environmental Assessment Method) Representative. Evaluation of the site activities including HSE procedures, material purchases, delivery, use of environmental materials in accordance with BREEAM requirements.
  • Ender İnşaat A.Ş.
    Site Manager
    Ender İnşaat A.Ş. Jun 2008 - Jun 2010
    Kayseri
    Optimall Shopping Center Total Area: 51.336 m2, Total Value: €21.7 millionPlanned, organized, supervised, controlled and evaluated project execution plan from start to finish according to the schedule, specifications and budget.Supervised and coordinated engineering team in line with the design strategy, criteria and clients requirementsSupervised field personnel evaluated performance and prepared performance reviews.Updated a detailed project schedule to ensure optimization of resources for the project.Evaluated contracts, contractors and vendorsEvaluated bid summaries of potential contractors with regard to technical suitability, quality, cost and time.
  • Aker Solutions
    Structural Engineer
    Aker Solutions Feb 2008 - May 2008
    http://www.akersolutions.com; Arctic Platinum Project (Suhanko-Finland), Reserve: 75.000.000 tonnes, Milling Rate: 21.500 tonnes/dayDeveloped detailed work breakdown structures for the structural design stage; prepared project schedules using network scheduling techniques and constraint optimization (PERT/CPM), provided scheduling and design recommendations to Engineering Manager.Performed structural concrete and structural steel calculations for various mining structures including, heavy duty box culverts, floatation facility, concentrate unloading facility, conveyor footings and port conveying and loading structures and transfer towers.Prepared material take-off lists for architectural, civil, concrete, demolition, earthwork and structural steel elements of structures.
  • Bantrel
    Structural Engineer
    Bantrel Jun 2006 - Feb 2008
    http://www.bantrel.com; JERP (Jamnagar Export Refinery Project, Jamnagar India), Total Area: 640.000 m2, Capacity: 1.2 million barrels per dayPetroCanada Montreal Refinery Extension Project, Total Area: 40.000 m2, Capacity: 135.000 barrels per dayParticipated in the MOE (Multi Office Execution) Project of world’s largest ever built refinery. This project is one of the Cornerstone MOE (Multi Office Execution) Projects for Bechtel. Toronto office was one of the main offices that contributed for the completion of the project together with other Becthtel Offices located in Houston, Paris, London and Mumbai. 67% of shares of Bantrel Co. Is owned by Bechtel Corporation. Performed structural concrete and structural steel designs including pipe racks, platforms, pipe supports, and foundations for buildings, equipment, generators, compressors, pumps, exchangers and transmission towers for the detail engineering phase of the work.Developed methods for detailed tracking and coordination of project inputs, scheduling and resource constraints, project timelines and department-level communicationsManaged collaboration of data flow with the other in-house professional departments
  • Halsall Associates
    Structural Engineer
    Halsall Associates Jun 2004 - Jun 2006
    http://www.halsall.com; Windsor Hotel Extension Project, Total Area: 350.000 m2Performed structural analysis and design for various components including post tensioned slabs and beams, columns, retaining walls and foundations of a Hotel Building.Developed MS Excel Templates for structural design tasks using standard engineering methods in accordance with the National Building Code of Canada.
  • Niğbaş A.Ş.
    Business Development Engineer
    Niğbaş A.Ş. Sep 2001 - Jun 2004
    Conducted feasibility studies, compiled proposals, and negotiated details of scope of works and engineering services to be provided for the clients and established basic design criteria for various projects.Prepared contracts and negotiated revisions, changes and additions to contractual agreements with suppliers and clients.İstikbal Mobilya, Mustafa Demir, Milkay Tekstil, Hidrokontrol, Saray Halı, Sultan Meat Products, Tokgöz Gıda, Orhan Tan, Merkez Çelik, Elmacıoğlu Iskender Projects. Site ChiefPrepared Work Schedules that detailed in-situ construction, production, and delivery and installation times of precast structural members.Coordinated and supervised daily tasks of site staff.
  • Niğbaş A.Ş.
    Research Engineer
    Niğbaş A.Ş. Sep 2001 - Jun 2004
    Conducted structural design and analysis and prepared structural detail drawings, issued specifications, bills of quantities and methods of construction following ISO quality assurance procedures Designed formwork systems and production lines and manufactured new precast concrete products.Performed research activities, set up experiments for testing structural materials and components.
  • Tekser Insaat Sanayi Ve Ticaret A.S.
    Technical Office Engineer
    Tekser Insaat Sanayi Ve Ticaret A.S. Jun 2000 - Sep 2001
    Kayseri
    Kayseri Waste Water Treatment Plant, Population to be served: 800.000 peopleCoordinated Technical Office with Site Engineers and other departments for the execution of the project based on FIDIC rules, plans, projects, technical specifications.Coordinated delivery of most recent projects, specifications and method statements with Site Engineers.
  • Betas Yapı
    Civil Engineer
    Betas Yapı Jun 1997 - Jun 2000
    Kayseri
    Yataş, İlkay White Goods, Mondi, Kayseri Metropolitan Municipality, Hes Machinery, Birlik Textile, Karsu Textile, Kilim Furniture, İpek Furniture, Cihan Printing Works Projects.Supervision of activities of field staffDeveloped and implemented project execution plansPlanned and prepared construction schedules and milestones and monitor progress against established schedules.Prepared progress reports and issued progress schedules to clients

Ibrahim Tok Skills

Project Management Government Contracting Ipa Projects Fidic Project Estimation Project Planning Civil Engineering Cost Control Construction Project Coordination Contract Management Steel Structures Precast Structures Reinforced Concrete Structures Site Management Turkish Building Codes Canadian Building Codes Microsoft Excel Sap2000 Autocad Tekla Structures Ms Project Engineering Structural Engineering Concrete Structural Analysis Feasibility Studies Construction Management Steel

Ibrahim Tok Education Details

  • Çukurova Üniversitesi
    Çukurova Üniversitesi
    Civil Engineering
  • Kayseri Anadolu Ticaret Lisesi
    Kayseri Anadolu Ticaret Lisesi
    Computer Science

Frequently Asked Questions about Ibrahim Tok

What company does Ibrahim Tok work for?

Ibrahim Tok works for Https://projehesap.com/

What is Ibrahim Tok's role at the current company?

Ibrahim Tok's current role is Principal Engineer/Owner.

What is Ibrahim Tok's email address?

Ibrahim Tok's email address is ib****@****sap.com

What schools did Ibrahim Tok attend?

Ibrahim Tok attended Çukurova Üniversitesi, Kayseri Anadolu Ticaret Lisesi.

What skills is Ibrahim Tok known for?

Ibrahim Tok has skills like Project Management, Government Contracting, Ipa Projects, Fidic, Project Estimation, Project Planning, Civil Engineering, Cost Control, Construction, Project Coordination, Contract Management, Steel Structures.

Not the Ibrahim Tok you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.