AeroLeads people directory · profile

Ignacio E. Email & Phone Number

Construction Manager at Dragados SA
Location: Madrid, Community of Madrid, Spain 11 work roles 1 school
LinkedIn matched
✓ Verified Jul 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Construction Manager
Location
Madrid, Community of Madrid, Spain
Company size

Who is Ignacio E.? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Ignacio E. is listed as Construction Manager at Dragados SA, a with 1991 employees, based in Madrid, Community of Madrid, Spain. AeroLeads shows a matched LinkedIn profile for Ignacio E..

Ignacio E. previously worked as Aberdeen Harbour Expansion Project (NEC3 option A) at Dragados Sa Uk & Ireland and Bank Station Capacity Upgrade (NEC3 option C) at Dragados Sa Uk & Ireland. Ignacio E. holds M.Sc. Civil Engineering from Universidad Politécnica De Madrid.

Company email context

Email format at Dragados SA

This section adds company-level context without repeating Ignacio E.'s masked contact details.

Dragados SA

Review company-level records connected to Ignacio E. before choosing the right outreach path.

Profile bio

About Ignacio E.

Ignacio is a Civil Engineer with over 20 years of experience as an employee of Dragados SA with experience in construction of mass transit, rail, highway facilities, subterranean works including TBM bored tunnels and harbour construction. He has extensive technical and management skills acquired from his positions in heavy civil projects, as well as experience in claims, litigation and expert witness reports (NEC).Expertise in Large Scale Projects, Teams Management, Relationship with Clients, Process and Productivity Improvement, Infrastructure and Structure Technical Management.Member of Spanish Association of Civil Engineers.Registered as Professional Civil Engineer in Spain / UE, Reg. No. 18.381

Current workplace

Ignacio E.'s current company

Company context helps verify the profile and gives searchers a useful next step.

Dragados SA
Dragados Sa
Construction Manager
madrid, madrid, spain
Website
Employees
1991
AeroLeads page
11 roles

Ignacio E. work experience

A career timeline built from the work history available for this profile.

Construction Manager

Current

Aberdeen, United Kingdom

May 2019 - Present

Aberdeen Harbour Expansion Project (Nec3 Option A)

Aberdeen, United Kingdom

Cost Manager Nov-16 to Aug-18.Head of Section Jun-18 to Apr-19.Construction Manager May-19 to present.The new facilities will include 1,400 metres of new quay, with a water depth of up to 10.5 metres and will create an additional 125,000 square metres of lay-down area.

Bank Station Capacity Upgrade (Nec3 Option C)

London, United Kingdom

As Cost Manager, Mr. Escolar’s large technical experience and management skills in large heavy civil works with an emphasis on earthworks will help the project stay on its construction standards and schedule. He supervised the heads of all the major construction areas and helped them coordinate to ensure the best possible productivity.

Feb 2016 - Nov 2016

Metro North West Railway Link

Sydney (Australia)

Cost Manager. Budget and planning lay out for an international Design & Construction bidding: 2x15km with 4xTBM; 5 station boxes + 2 Service Shafts excavation; 59 cross passages connexions; 2 mined tunnels 300 m long below existing railway; crossover cavern 159 m long 23 m wide; precast installation for 100,000 segments.

Oct 2012 - Feb 2016

Villalba De Los Barros Dam

Badajoz (Spain)

Project Manager. The project includes the construction of a loose materials dam with a clay core, filter, shoulder upstream with rockfill protection, and shoulder downstream over a layer of drain (45 m. high, 450 m. long in crest), creating a reservoir of 106 hm3. Reinforced concrete weir 130 m long (tested at reduced scale in Polytechnic University of Madrid), perimetral gallery 160 m long within mass rock, and tunnel for river deviation across the dam were also executed. According to the Environmental Impact Assessment, all materials (about 1.3 million of cubic metres) were obtained from the reservoir. Drill and blasting methods of excavation were used only in part of the weir, always out of the dam area.Waterproofing treatment injections were performed from inside the perimetral gallery. Instrumentation were implemented with a web-based system that allow real-time consultations of tensiles inside the dam. Also, 3 fiber optical cables were installed along the contact between ground and dam, and in several levels of the dam, to detect possible filtrations across the dam.A full testing laboratory was installed on site.9 archaeological sites were discovered and studied within the reservoir and during the dam construction.This dam ensures the supply to the pool and some other villages (about 100,000 inhabitants), besides allowing some irrigation.Roles and responsabilities: full responsibility on the project, reported to the area manager.

Feb 2008 - Oct 2012

La Plata Highway (A-66) – Plasencia Bypass Section

Cáceres (Spain)

Project Manager. This project includes the construction of a dual highway 12.1 km long, one viaduct 326 m. The viaduct consisted in a steel beam and concrete superstructure, executed over an existing roundabout that connects with other highway. Eleven underpasses and three overhead crossings were executed.Excavation included drill and blasting, as well as mechanical methods.Soil stabilization with cement 30 cm depth was executed in situ. Soil cement 25 cm thick and all bituminous materials were executed self-performed.A full testing laboratory was installed on site.Roles and responsabilities: full responsibility on the project, reported to the area manager.

May 2007 - Feb 2008

Burying Of The M30 Highway Puente Del Rey – Avenida De Portugal

Madrid (Spain)

This project includes the construction of a tunnel executed between screens: 2.89 km. long in the interior North way, 2.91 km. long in the exterior South way, 2x1.5 km in the junction with highway A-5 Madrid-Lisboa, through clay and sands, typical sub-soil of Madrid. The tunnel consists in a 4-6 lanes highway. The high dense urban environment required dealing with multiple relevant utilities and live traffic during all the construction.The tunnel runs in parallel with the Manzanares River, and has several crossings below and above him. Therefore, important waterproofing assessment and flooding preventions were taken. Roles and responsabilities: full responsibility on the budget and schedule of installations (electrical, ventilation, security), construction of services shafts, utilities relocations, tunnel finishing.

May 2005 - May 2007

Housing Development. Urban Plan “Parla-Este”

Madrid (Spain)

Urban development project including 325 Has, 40km of new streets.Soil stabilization in situ, concrete and bituminous materials self-performed.Roles and responsabilities: Responsible for self-perform installations. Design Management.

Mar 2003 - May 2005

Refurbishment Of The Railway Complex Puerta De Atocha – Cerro Negro Santa Catalina

Madrid (Spain)

This project includes the execution of a new yard for the High speed trains maintenance, earth-movement and civil works for the railway yards, as well as the increase of the station capacity to allow for future railways developments. 12 km micro-piles in the interior of the station, acoustic glass wall 250 m long and 25 m high.Roles and responsabilities: Design Management.

Mar 2001 - Mar 2003

Madrid - Zaragoza - French Border High Speed Railway Line

Madrid (Spain)

The project included two different Works: Integration of the railway line Madrid-Barcelona in Atocha Station: infrastructure, platform, tracks and installations. The objective of these works were the construction of a traditional wide track, joined to the current High Speed track, in order to be used jointly inside the Atocha area. The Station was working during the Works.Linking the New line with the existing Madrid-Sevilla line: infrastructure and platform, linking the tracks using flyovers and underpasses.This project involved the execution of more than 2,616,230.7 yd³ of earth movements, the construction of 13 structures for the High Speed Train, three underpasses, two overpasses, three viaducts and a bridge over the Manzanares River 665 m. long (máx. span 50m.).Roles and responsabilities: Project Engineer.

Jul 2001 - Mar 2002

Conversion To Dual Carriage Of The Aspe - Elche Highway

Alicante (Spain)

This project includes the conversion to dual carriage of the motorway 6.84 km long. 5 main structures, for existing roads and railways, were executed. Drill and blast methods were used along the project, coordinated with live traffic and with protection for close residential areas.Roles and responsabilities: Undergraduate Engineer.

Jun 2000 - Sep 2000
Team & coworkers

Colleagues at Dragados SA

Other employees you can reach at dragados.com. View company contacts for 1991 employees →

1 education record

Ignacio E. education

FAQ

Frequently asked questions about Ignacio E.

Quick answers generated from the profile data available on this page.

What company does Ignacio E. work for?

Ignacio E. works for Dragados SA.

What is Ignacio E.'s role at Dragados SA?

Ignacio E. is listed as Construction Manager at Dragados SA.

Where is Ignacio E. based?

Ignacio E. is based in Madrid, Community of Madrid, Spain while working with Dragados SA.

What companies has Ignacio E. worked for?

Ignacio E. has worked for Dragados Sa and Dragados Sa Uk & Ireland.

Who are Ignacio E.'s colleagues at Dragados SA?

Ignacio E.'s colleagues at Dragados SA include Italo Vasquez, José Rey Medina, Pedro Espinosa Venega, Ricardo González Recio, and Ruben Maeso.

How can I contact Ignacio E.?

You can use AeroLeads to view verified contact signals for Ignacio E. at Dragados SA, including work email, phone, and LinkedIn data when available.

What schools did Ignacio E. attend?

Ignacio E. holds M.Sc. Civil Engineering from Universidad Politécnica De Madrid.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Ignacio E. you were looking for.

View similar profiles