Project Engineer
CurrentPerformed the role of Project Engineer responsible for the design of various aviation projects at O’HareInternational airport in the City of Chicago.Prepared calculations and design plans for a proposed drainage system and watermain forTaxiway LL.Assisted with watermain design and plan preparation for Advanced Utilities Package.Prepared plans and typical sections for various service roads at O’Hare International Airport.Prepared construction plans for demolition, existing conditions, utilities, pavement geometry,pavement markings, erosion control and grading.Prepared design plans for the elimination of the Central Detention Basin (CDB).Prepared quantity and cost estimate calculations for utilities, erosion control, demolition,pavement and pavement markings.Assisted with pavement and pavement markings design for Taxiway K4.Prepared design drawings and cost estimate for Taxiways A and B Rehabilitation.Prepared technical specifications for construction including utilities, earthwork, demolition, andpavement.