Quality Assurance Quality Control
CurrentFCA Arc'treyx equipment buyer.Sample inspection and risk assessment at sample stage and share with production concern.Attend pre-production meeting with production concern and share the alert point on the meeting. Approval trims card for production, Check fabric and accessories inspection report.Check required lab test result before production. Follow up production activities and required standard quality as well as conducted In-line inspection with virtual reports.Conducted pre- final inspection after complete 80% production by customer’s individual virtual report.Arrange the final inspection and collaboration with the customer’s inspector.Overall follow up fabric inspection stage to final inspection, Conducted factory Internal Technical audit, mold prevents audit with report, Make buyer CAP, CAPA, RCCA, Derogation report.