It Specialist
Got a great experience in an atmosphere of speeding up the work for the commissioning of the gigantic object. At the same time the implementation is absolutely unrelated to each entry for other tasks - from the procurement and supervision of all types of work in the IT field to set up a network equipments and server software.Azimut SPA Sochi Hotel, the biggest hotel in Europe located in Sochi near Olympic park, 3600 rooms, 24 buildings located on 37 acres of land, was built specifically for the press at the time of the Winter Olympic Games 2014. The main responsibilities – commissioning of the entire hotel infrastructure during startup, including the structured cable system, access control system, multimedia (IP TV) and telephony. Creating server cloud farms using WMware ESXi (based on IBM hardware),22 physical servers in 2 sites, 22 virtual servers in each of two clouds – MS environment – AD, Exchange, RDP, DFS, Opera, Micros. After startup – user support including hotel guests – journalists from all of the world, maintaining all the IT environment – network, servers, workstations, front offices, call center, trade equipment, 1340 WI-FI access points, more than 2400 security cameras, printers, scanners, et.c.. Exhausting and hard work – after commissioning, during the Olympic Games was in the night shift in a day.