Technical Team Lead
CurrentDesigned release process, which removed multiple single points of failure, automated testing, and resolved failed deployments.Optimized ecommerce database that was growing by 300MB/month. Implemented elastic search to reduce Time To First Bite (TTFB) for large tables.Optimized performance of a website: Increased FCP by 1.7 s., LCP by 3.6 s. Decreased TBT from 1,180 ms to 200 ms. CLS from 0.665 to 0.017.Operationalized a central logging platform using Graylog and orchestrated the log ingestion.