Surveyor
Monitored estimated time of tanker arrival.Prepared and submitted assignment letters to loading/discharge ports.Assisted in cargo loading and discharge processes by collaborating withthe captain, chief officer, and loading master.Conducted cargo sampling and measured cargo density, water traces,and temperature.Gauged and sounded cargo levels using gauging/sounding tape, both onthe vessel and at loading/discharging ports.Calculated cargo quantities in liters, long tons, metric tons, and barrelsand converted them using vessel tank tables and ASTM/API oil and gasmeasurements tables.Generated reports based on actual measurements, including timesheets, notices of discrepancies, vessel ullage, certificate quantities forloading/discharge, and letters of statement (when necessary).Provided hourly reports on discharging/loading activities.Prepared discharging/loading activity reports and converted them into hardcopy and softcopy formats, which were then sent to clients such as Pertamina, Wilmar, Chevron, and SGS Indonesia.