Suspension Design Lead
Current-Coordinated and assigned tasks for the 8 subteam members-Derived subteam level design requirements from the overall performance goals-Created test plans to gather data on prior vehicles to lead design decisions-Individually designed steering rack, steering knuckle, front and rear hubs in Solidworks to satisfy competition, design, and other subteam requirements-Designed tabs and jig plates to ensure proper mounting points during chassis welding-Conducted basic FEA on components using testing data to validate component strength-Presented suspension subteam design resulting in a 2nd place finish out of 10 teams-Fabricated components using manual lathes, mills, and other shop equipment-Planned VnV testing upon final completion of the vehicle to ensure compliance with design requirements