Mid Range Waste Planner
Current-Scheduled overburden and interburden movement each month for a 3-month outlook to ensure tailings dyke containment was met-Created a technical report outlining the 3-month waste plan and presented to management and mine staff-Adjusted dyke designs to adhere with field conditions and constructibility-Developed execution packages for complex dyke structures for short range mine planning and operations -Designed in-pit waste dumps for improved efficiency-Designed various haul roads and ramps to access mining and dumping locations