Site Civil Engineer
CurrentAbdelmoumen's Pumped Energy Transfer Station (STEP) > Tunnels filling: casting of around 25 000 m3 of both self compacted and vibrated concrete > Optimized the cost of injection operations after casting > Water Intake: geometrically complex structure including 25tons precast elements assembly > Construction of road infrastructures Managed a team of around 100 workersTook part in the External Penstock works: 11 concrete blocks of 450 m3 each and 91 mini pillars ~7m3 each anchored (post tension) in the ground