- Major Project2015.05 - 2017.12 (2 years 7 months) KRP3050 | Engineering Division Assistant Manager2016.10 - 2017.06 (8 months) Hadera| Engineering Division Assistant Manager2016.10 - 2017.03 (5 months) Kinyerezi | Engineering Division Assistant Manager2016.01 - 2016.06 (5 months) SIPP | Engineering Division Staff2015.06 - 2016.05 (11 months) Wirye CHP | Engineering Division StaffI worked in Ajou engineering from January, 2015 to December, 2017 3years as assistant manager of engineering division, located on Doksan station. As a packaging company that produces chemical dosing system and sampling system to be supplied to the power plant and petrochemical plant field.
-
기술영업Skf Korea Ltd. Jan 2023 - Present대한민국 서울 -
대리(Assistant Engineer)아주엔지니어링 Jan 2017 - Dec 2017
-
대리(Assistant Manager)아주 엔지니어링(Ajou Engineering) Jan 2015 - Dec 2017
-
Engineering Team / Assistant ManagerAjou Engineering Jan 2015 - Dec 2017Seoul, KoreaI worked in Ajou engineering from January, 2015 to December, 2017 3years as assistant manager of engineering division, located on Doksan station. As a packaging company that produces chemical dosing system and sampling system to be supplied to the power plant and petrochemical plant field. I was started the project called 'Wirye' about 6 months later. Each project takes about 6months until finish, Starting with the project 'Wirye', I have carried on projects such as SIPP, Kinyerezi, Hadera and… Show more I worked in Ajou engineering from January, 2015 to December, 2017 3years as assistant manager of engineering division, located on Doksan station. As a packaging company that produces chemical dosing system and sampling system to be supplied to the power plant and petrochemical plant field. I was started the project called 'Wirye' about 6 months later. Each project takes about 6months until finish, Starting with the project 'Wirye', I have carried on projects such as SIPP, Kinyerezi, Hadera and KRP3050 as the main engineer.Main task is to estimate as TBE before project order, through the KOM meeting with customer by specifying the same concrete matters as onsite conditions and allowable conditions, the design framework after working firmly after order, working on drawings and necessary documents in drawings and work using Autocad, Solidworks.Upon approval of the drawings and documents from the customer, we will proceed with the production. For the finishing work of the project, we will conduct the inspection with the customer side inspector after completion of the production. At this time we prepared and examined the necessary reports and finished the project with inspections carried out at the work site. After delivery, we tried on-site test runs, processed about troubleshooting, promoted customer driving training, and carried out on projects such as Tufanbeily, Wonju RDF, Willie and Hwaseongdongtan. In the results through this, the company ensured the reliability of the customer through business delivery cooperation with other departments, through the inspection before shipment. Also experience through in progress projects, education to the other staff performed other project. Show less
Frequently Asked Questions about Jaeyup Kim
What company does Jaeyup Kim work for?
Jaeyup Kim works for Skf Korea Ltd.
What is Jaeyup Kim's role at the current company?
Jaeyup Kim's current role is 대리(Assistant Manager) -SKF Korea.
What schools did Jaeyup Kim attend?
Jaeyup Kim attended 한국산업기술대학교.
Not the Jaeyup Kim you were looking for?
-
Jaeyup Kim
Canada -
Jaeyup Kim
Sinjeong-Dong -
Jaeyup Kim
South Korea
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial