Cad/Technical Intern
CurrentAssisted in drafting temporary works design drawings for a 500m cable-stayed bridge, part of the $1.4B Pattullo Bridge Replacement Project across the Fraser River.Conducted site visits to inspect that the as-constructed temporary works conformed to drawings and specifications, coordinating with contractors, site staff, and engineers.Conducted a site review of the temporary foundation supports, load test frame, loading methodology, and protocol for the lifting gantry system used in the bridge's construction.Assisted in developing erection engineering drawings for steel bridges.Supported the Principal Engineer in public consultations and development of conceptual designs for a pedestrian bridge in an environmentally sensitive valley within a residential neighborhood.Oversaw a sub-consultant in creating a 3D photorealistic rendering of a Mass Rapid Transit (MRT) segmental bridge for a Mumbai Metro project.