James Roy

James Roy Email and Phone Number

Regional Sales Manager at ASTEC @ Avison Young
West Jordan, UT, US
James Roy's Location
West Jordan, Utah, United States, United States
James Roy's Contact Details
About James Roy

Engineer and Project Manager with experience in all aspects of process engineering including equipment design, installation, safety reviews, financial evaluation, performance review, and contractor management. Effective in bringing projects in on time and budget while maintaining the highest safety standards. Facility Manager with experience in all aspects of building management. Always looking at new opportunities, I can be contacted at 801-556-9151 or James32093@msn.com .

James Roy's Current Company Details
Avison Young

Avison Young

View
Regional Sales Manager at ASTEC
West Jordan, UT, US
Website:
avisonyoung.com
Employees:
3503
James Roy Work Experience Details
  • Avison Young
    Avison Young
    West Jordan, Ut, Us
  • Astec
    Regional Sales Manager
    Astec Sep 2024 - Present
    Us
    Sales manager for western USA & Western Canada. Provide engineering solutions to provide or recover heat for industrial processes.
  • Avison Young
    Facilities Manager - North America
    Avison Young Apr 2020 - Jul 2024
    Toronto, On, Ca
    Facility Manager responsible for multiple buildings including a Data Center, Call Center at a n+1 status, and 13 other office spaces across the US and Canada. Oversee renovations and upgrades for tenants ($5M buildout) and capital projects (UPS upgrade). Integrate/upgrade equipment PM's. Maintain Capital and Operations budget. Manage building engineering department, security staff, janitorial, & landscaping, COVID requirements.• Develop and implement operating cost reduction of 20%• Oversaw Tenant Improvement of 51,000 ft2 ($5M buildout), 13,750 ft2 ($7M buildout) • Oversaw relocation of 64,000 ft2 Data Center• Maintained budgets across 14 sites (US, Canada)• Managed 3 office managers, 2 building engineer
  • Clean Harbors
    Facility Engineering Manager
    Clean Harbors Dec 2017 - Apr 2020
    Norwell, Ma, Us
    Engineering Manager responsible for all capital, continuous improvement, and cost savings projects for the Aragonite Utah waste incinerator and Clive Utah Waste Storage Facility. Provide engineering support to all areas of the plant (waste blending, profiling, and classification). Mentor employees in leadership and skill development.• PSM implementation (Including MOC, PHA, FMEA, HAZOP)• Improvement of tank inspection process ($450k savings)• Oversaw documentation migration to SharePoint (inspections, drawings, equipment files, ect.)• Manage Continuous Improvement• Managed site capital project budget, provide project management, & technical support• Upgraded Fire water system (New 500k gal. tank, upgrade fire water pumps, $500k project)• VPP implementation for OSHA review (Star Status Achieved)
  • Hexcel Corporation
    Process Engineer
    Hexcel Corporation Jun 2016 - Aug 2017
    Stamford, Ct, Us
    Engineer responsible for all aspects of carbon fiber manufacturing line (technical, operations, and maintenance). Provide technical expertise to packaging department for improved safety, operability, and improved lean operations. Mentor younger engineers in use Six Sigma/Lean practices.• Improved yields on production line by 4%• Eliminated $2.5M of lost waste in automated packaging• Led cross functional ergonomics team to automate lifting task
  • Rio Tinto
    Maintenance Engineer
    Rio Tinto Nov 2012 - Mar 2016
    London, Greater London, Gb
    Technical advisor for the maintenance department while championing continuous improvement. Contributed to plant regulatory compliance and training. Developed and delivered MSHA site training. Functioned as Plant Radiation Safety Officer. Introduced and integrated Six Sigma principles into division.• Updated and improved existing instrumentation to meet new performance goals (radiation devices, flow meters, valve type selection)• Managed three conveyor belt replacement projects ($750k, $12M, $15.4M)• Installed new rock breaker for primary gyratory crusher ($725k)• Led continuous improvement projects to increase reliability while lowering operating costs
  • Rio Tinto
    Instrumentation Engineer
    Rio Tinto Jun 2012 - Nov 2012
    London, Greater London, Gb
    • Evaluated instruments against process needs, implemented required changes resulting in first quartile production and safety standards.• Increased milk of lime production by 35% after championing instrumentation improvements• Reduced chemical usage 12.5% in float cells through upgrades to instrument control system • Supervised and coordinated multiple contractors (electrical and mechanical)
  • Rio Tinto
    Process Engineer
    Rio Tinto Jan 2010 - Jun 2012
    London, Greater London, Gb
    Provided technical assistance to operations while improving plant operations and safety through continuous improvement and six sigma projects.• Increased furnace capacity 12% by improving slag pot availability• Significantly improved safety by finding and integrating online furnace measuring system• Facilitated technical changes with maintenance and operations• Troubleshot process and mechanical issues• Performed business improvement projects (boiler improvements, 5S lean)• Verified and updated PFD’s and P&ID’s• Provided continuous improvement to the plant through performance of safety risk assessments, FMEA’s, Hazops, updating P&ID’s, PFD’s, SOP, SWI, and PRT’s• Coordinated process changes with operations to maintain process operating conditions
  • Mahr Metering Systems Corporation
    Design Engineer
    Mahr Metering Systems Corporation Jan 2009 - Jan 2010
    Göttingen, Lower Saxony, De
    Consulted with customers to develop solutions for process issues with specialization in custom metering equipment. Designed the systems and managed the equipment installation.• Evaluated client needs and designed custom metered mixing equipment for various industries (aerospace, nuclear, food packaging, printing, packaging, fabrics production), including all mechanical drawings, P&ID’s, PFD’s• Designed glue mixing system which reduced waste (50-70%) and downtime (10-15%)• Managed and installed million-dollar resin mixing systems in China, Canada, USA• Provided customer support on previously installed equipment (PLC, mechanical, electrical)
  • R. Miller Design
    Project Engineer
    R. Miller Design Jan 2007 - Dec 2008
    Provided engineering support for improvement projects in Salt Lake City and China facilities. • Managed new solvent tank farm installation, $65k budget• Developed and installed point-of-use resin mixing system for wind turbine industry ($215k)• Increased production 200% by upgrading controls (temperature, pressure, flow, degassing) on resin reactors• Coordinated multiple continuous improvement projects with varying safety requirements (D1, nema 12, etc.)• Integrated PSM requirements for SLC plant
  • Hexcel Corporation
    Project Engineer
    Hexcel Corporation May 2005 - Dec 2008
    Stamford, Ct, Us
    • Integration of Controls Systems (DCS – Foxboro, PLC – Rockwell Automation)• Troubleshoot control loops• Design/Implement heating control systems• Develop Carbon Fiber Line operating parameters• Write SOP’s for new and retrofitted production lines • Manage and coordinate contractors

James Roy Skills

Engineering Process Engineering Mining Continuous Improvement Project Management Minerals Mineral Processing Six Sigma Maintenance Management Project Engineering Commissioning Root Cause Analysis Management Project Planning Metallurgy Plant Maintenance

James Roy Education Details

  • University Of Utah
    University Of Utah
    Chemical Engineering

Frequently Asked Questions about James Roy

What company does James Roy work for?

James Roy works for Avison Young

What is James Roy's role at the current company?

James Roy's current role is Regional Sales Manager at ASTEC.

What is James Roy's email address?

James Roy's email address is ja****@****nto.com

What schools did James Roy attend?

James Roy attended University Of Utah.

What skills is James Roy known for?

James Roy has skills like Engineering, Process Engineering, Mining, Continuous Improvement, Project Management, Minerals, Mineral Processing, Six Sigma, Maintenance Management, Project Engineering, Commissioning, Root Cause Analysis.

Who are James Roy's colleagues?

James Roy's colleagues are Sloane Walsh, Theresa Hartman, Jason Levendusky, Alan Francis, Omar Choudhury Mrics, Sara Jane Hamilton, Amer Qureshi.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.