Jason Casbeer

Jason Casbeer Email and Phone Number

Project Manager at Murray-Ward @ Murray-Ward Contracting, Inc.
Jason Casbeer's Location
Dallas-Fort Worth Metroplex, United States
Jason Casbeer's Contact Details

Jason Casbeer work email

Jason Casbeer personal email

n/a
About Jason Casbeer

I am a highly motivated individual who is always up for a new challenge and never afraid to learn. My technical expertise is in manufacturing and cost estimation.

Jason Casbeer's Current Company Details
Murray-Ward Contracting, Inc.

Murray-Ward Contracting, Inc.

View
Project Manager at Murray-Ward
Employees:
11
Jason Casbeer Work Experience Details
  • Murray-Ward Contracting, Inc.
    Project Manager
    Murray-Ward Contracting, Inc. Nov 2021 - Present
    Dallas-Fort Worth Metroplex
  • Tk Elevator
    Project Manager
    Tk Elevator Sep 2019 - Nov 2021
    Dallas/Fort Worth Area
  • Tk Elevator
    Project Engineer
    Tk Elevator Aug 2018 - Sep 2019
    Texas
  • Tk Elevator
    Estimator
    Tk Elevator Oct 2016 - Aug 2018
    Dallas/Fort Worth Area
    Responsible for the intake and examination of customer RFP/RFQs for various airport construction projects. Created and prepared proposals for public and private multi-year, multi-million dollar projects.• Reviewed product specifications, engineering drawings, and construction documents to determine project scope.• Coordinate project specific deliverables with internal departments and external parties.• Defined Scopes of Work for subcontractors.• Develop and coordinate RFIs with engineer/architect during the bid process.• Served as a Technical Consultant on projects in which customers were unfamiliar with the product.
  • Koch Heat Transfer
    Estimator
    Koch Heat Transfer Jan 2015 - Sep 2016
    Houston, Texas
    Performed detailed and accurate cost estimation of engineered-to-order heat exchangers to ASME Section VIII and Pressure Equipment Directive (PED) codes.- Analyzed project scopes and determined necessary resources with regard to budget and schedule constraints. - Conducted Post Mortem reviews and Root Cause Analysis of projects with performance variances to define corrective actions and ensure accuracy of future estimates. - Maintained historical database of fabrication labor and material costs for reference and comparison. - Served as the Estimation and Product Line liaison for European & Asian subcontractors. - Prepared detailed RFQ packages for subcontractors to reduce delays and ensure quick cycle-times and accurate proposals. - Observed and conducted time studies of current manufacturing processes to improve production bottlenecks and benchmark estimation labor hours. - Simultaneously managed multiple estimations with consistent on-time delivery. - Generated, maintained, and improved vendor channels for quick sourcing of materials and third-party services.
  • Wood
    Field Engineer
    Wood Jul 2014 - Dec 2014
    Pasadena, Texas
    Participated in the Chevron Phillips PE8 Margin Improvement Project turnaround/shutdown operations to install and replace electrical equipment and process instrumentation. Main focus on procurement and inventory control of SIS instrumentation and associated electrical hardware. Developed a database of parts and monitored/recorded stock levels to reduce or eliminate field production delays.Other Involvements:- Enhanced the procurement/warehousing relationship between Customer and Contractor by enhancing documentation and record keeping to streamline the ordering process and reduce inventory disputes. - Compiled multiple material and field-performance trackers for detailed progress analysis by utilizing P&IDs, engineering drawings, details, and schedules.- Performed QA/QC Loop Testing of process instrumentation to ensure proper installation and calibration.
  • Gerdau
    Capstone Senior Design Project
    Gerdau Sep 2013 - Apr 2014
    Beaumont/Port Arthur, Texas Area
    Consisted of performing a continuous improvement project involving the Design and Analysis of implementing an In-motion Rail Scale into the Gerdau Beaumont Mill scrap metal weighing process.- A static scale is currently in place which negatively impacts follow-up and downstream processes.- Performed time studies and ran a simulation to compare the existing static scale and the proposed In-motion Scale.- Results confirmed reductions in time and improved delivery to eliminate downtime in the mill.- Company savings concluded to be over $500,000 annually.
  • Enduro Composites
    Industrial Engineering Intern
    Enduro Composites May 2013 - Aug 2013
    Freeport, Texas
    Involved in performing cost estimation and RFQ preparation of Fiberglass Reinforced Plastic piping and pressure vessels in accordance with customer specifications for Oil and Gas, Petrochemical, and Waste Water industries.Other Involvements:- Calculated dimensional details for pressure vessels to Reinforced Thermoset Plastics standards (RTP-1) in accordance to customer specifications.- Involved in the implementation of Manufacturing Resource Planning program, Macola ES. Main focuses on Bill of Material allocation and Labor Routing.- Evaluated manufacturing practices in process for customer projects with specific requirements. - Performed checking and revision of engineering drawings and documents.- Assisted in company meetings: safety reviews, MRP design, customer progress and completion reports.- Understanding of ANSI, ASME and other various industry standards.- Developed strong interpersonal, communication, and time management skills.
  • Enduro Composites
    Industrial Engineering Intern
    Enduro Composites May 2012 - Aug 2012
    Freeport, Texas
    Conducted time studies of Fiberglass Reinforced Plastic piping processes to maintain labor standards and ensure accurate pricing for quotations.Other Involvements:- Inspected pipes to identify quality problems and defects before shipping.- Performed material studies to identify scrap rates of thermo-plastic flanges.- Created database of customer specific parts and assemblies.- Created pricing program for wear pad piping products.- Took part in engineering progress meetings.- Drafted pipe flanges in AutoCAD.

Jason Casbeer Skills

Autocad Microsoft Office Six Sigma Lean Manufacturing 5s Teamwork Arena Simulation Software Pro Engineer Kaizen Kanban Spc Estimating Design Specifications Workplace Design Customer/vendor Relationships Engineering Inventory Control Project Tracking Process Improvement Manufacturing Industrial Engineering Project Management Continuous Improvement Microsoft Excel Ptc Creo Airport Construction Project Planning

Jason Casbeer Education Details

Frequently Asked Questions about Jason Casbeer

What company does Jason Casbeer work for?

Jason Casbeer works for Murray-Ward Contracting, Inc.

What is Jason Casbeer's role at the current company?

Jason Casbeer's current role is Project Manager at Murray-Ward.

What is Jason Casbeer's email address?

Jason Casbeer's email address is ja****@****upp.com

What schools did Jason Casbeer attend?

Jason Casbeer attended Lamar University.

What are some of Jason Casbeer's interests?

Jason Casbeer has interest in Aerospace And Defense, Bike Riding, Hunting, Manufacturing, Continuous Improvement, Process Improvement, Tennis, Golf, Professional, Target Shooting.

What skills is Jason Casbeer known for?

Jason Casbeer has skills like Autocad, Microsoft Office, Six Sigma, Lean Manufacturing, 5s, Teamwork, Arena Simulation Software, Pro Engineer, Kaizen, Kanban, Spc, Estimating.

Not the Jason Casbeer you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.