Senior Engineer
Birmingham, Alabama, Us
Design Modifications, E-FIN GroupDesigned and led implementation of minor changes to plant structures and components. Completion of modifications required extensive field involvement and prompt resolution of emergent installation issues. Prepared responses to requests for engineering review for civil and mechanical issues. Tasks included investigation of issues to be resolved, review of plant design and licensing bases, design of plant modification or analysis of structures/components, and preparation of applicability determinations/10CFR50.59 evaluations for the proposed activities. Significant projects include modifications of ASME Section III NF structural supports, repair of ASME Section VIII pressure vessel, and modification of reactor head stand steel pedestals and reinforced concrete shield wall. Engineer I; Engineering Support, Programs GroupResponsible for implementation, maintenance and improvement of 10CFR50 Appendix J Containment Leakage (Local Leak Rate Testing/Integrated Leak Rate Testing) Program, ASME Section XI, Subsections IWE/IWL Containment Inservice Inspection Program, and Settlement Monitoring Program. Sought continuous improvement for each program by participating in industry initiatives and training, following industry-wide technical and licensing developments, and conducting off-site benchmarking of program practices and performance with SNC fleet and industry peers. Completed EPRI training course on nuclear coatings specification development, procurement, application, maintenance and failure analysis. Obtained ASME VT-2 visual examination certification to perform quality control leakage examinations of piping and vessels. Managed an 8-person team to execute an Integrated Leak Rate Test (ILRT) of the Unit 1 Containment structure. Additional noteworthy projects include management of a general visual examination and evaluation of the Unit 1 Containment liner, and construction of significant storm water drainage / retention projects.