Resident Engineer
CurrentI am currently the Resident Engineer for Phase 1 and Phase 2 of the Charles Carroll Plaza and Genesee Crossroads Parking Garage Roof Slab Reconstruction Project. This project consists of constructing a new elevated ADA-accessible span connecting the mid-level of the plaza on the west side of the river with the Sister Cities Bridge, constructing an ADA accessible ramp from the east side of the Sister Cities Bridge to Bragdon Place, demolishing the existing abutment, constructing a new abutment, removing and replacing the river railing along the west side of the river between East Main and Andrews streets, and removing and replacing site lighting on the bridge and along the west side of the river. I supervise an inspection staff and train or assist in the office engineering/inspector duties, such as preparing daily diaries, reviewing daily inspector reports, preparation of change orders, pay applications, certified payroll, time, and material sheets, writing meeting agendas, running project meetings and production of meeting minutes.