Jennifer Hawkey's Location
Bacton, England, United Kingdom, United Kingdom
About Jennifer Hawkey
Jennifer Hawkey is a Project Manager at Weener Plastics Group.
Jennifer Hawkey Work Experience Details
-
Project ManagerWeener Plastics GroupBacton, Gb -
Project ManagerWeener Plastics Group Jan 2024 - PresentNorth Walsham, England, United KingdomOverseeing various projects such as machinery installations, chilled water, electrical capacity and energy saving -
Project ManagerNestlé Purina Petcare Europe Feb 2023 - Dec 2023Wisbech, England, United KingdomProject manager looking after civil and utilities to include feasibility and proposals for a new effluent and boiler house, various building renovations and land redevelopment. -
Cmms Project ConsultantUkaea Mar 2021 - Dec 2022Oxfordshire, England, United Kingdom• Consult and aide in the setup an Asset Management Strategy with the Mainsaver CMMS at its core• Improved Maintenance process and visibility through workflow mapping• Developed and delivered CMMS training packages• Project managed exercise verifying assets to develop system hierarchies, standard Nomenclature, and attributes
-
Reliability EngineerIpsen Oct 2019 - Jan 2021• Developed maintenance plans using various reliability methods for several projects including 2 new filling/packaging lines, automated transfer system and compressed Air Systems• Aided in the OQ validation -
Planning And Scheduling ConsultantQuorn Foods Aug 2019 - Oct 2019• Optimise the planning and scheduling function within the maintenance department• Introduced work packages for preventative maintenance• Trained new Planner and scheduler -
Project EngineerSmith+Nephew Feb 2019 - Aug 2019Hull, England, United Kingdom• Research and develop change control for Obsolescence, Improvements and New Product Implementations• ROI savings of £250K -
Reliability Project EngineerAts Corporation Aug 2018 - Jan 2019Toronto, Ontario, Canada• Performed maintenance surveys for several clients on fully automated assembly machinery as well as developing Departmental Maintenance Strategies for workflow and critical Spares -
Reliability Project ConsultantPredictive Maintenance Services Apr 2017 - Jul 2018Cleveland, Ohio, United States• Delivered hard and soft savings of between £75K and £250K for several Pharmaceutical clients in Europe through optimisation of maintenance plans• Optimization of maintenance planning and scheduling through workflow mapping and asset management strategy -
Maintenance Project ConsultantGenesis Solutions Jan 2015 - Apr 2017Oslo, Norway• Developed maintenance strategies and maintenance plans for multiple clients in Europe• Hard and soft savings of £1.5M through optimisation of maintenance plans• Developed load sheets of over 50K assets for an FLNG ship from technical drawings, developing a system hierarchy as it went• Asset criticality ranking of 150 systems and in turn 30K assets• FMEA of 35 systems• Developed maintenance plans for 25 systems
-
Interim Project ManagerSiemens Healthcare Solutions Diag Jan 2014 - Jan 2015Sudbury, England, United Kingdom• Project managed new installation and validation of new process to include a Fermenter, 2xVertical bag fillers and sealers, Chilled Water Plant, Water Purifier upgrades, Air Compressor and 3 ISO8 Cleanrooms with HVAC. Project Value £8M.• Delivered project cradle to grave within time and £1.6M under budget -
Interim Project Engineering ManagerBurts Snacks Ltd Aug 2013 - Dec 2013Plymouth, England, United Kingdom• Managed and complete 3 major projects to include a new fryer, packaging line and compressor with budgets ranging from £150K to £750K• Performed an Enterprise Asset Management assessment and deliver a strategy for improvement• Identified savings in the region of £750K with ROI of under 1 year• Developed strategies for single point of failure assets -
Engineering Project ManagerBernard Matthews Jan 2013 - Aug 2013Norfolk, England, United Kingdom• Manage 5 simultaneous projects ranging from £75K to £1.2M with full budgetary control to includeo Refit of packing Lineo Upgrade Odour Deletero Evisceration line upgradeo Lighting upgradeso New slicing line -
Cmms Integration Project LeadGenesis Solutions Jun 2012 - Dec 2012Dublin, County Dublin, Ireland• Developed maintenance strategy for some 2000 asset identified as safety critical on a Tier 2 Comah site in Dublin• Redline exercise of existing systems• Attribute collation of all assets for critical spares analysis• Data standardisation in Maximo of nomenclature, classification, and maintenance• Development of maintenance plans for rotating machinery
-
Interim Engineering ManagerTangerine Confectionery Jan 2012 - Jun 2012Blackpool, England, United Kingdom• Develop and action a departmental strategy, to meet the Business TPM Strategy• Identified Circ £150k annual energy savings for site, and potential £1.5M annual savings for Group• Ran a Waste Lean event identifying £120K savings through trimming waste with a ROI of 3 months• Consulted on developing a Group Engineering management role, and the responsibilities this role should hold. -
Interim Dairy Engineering ManagerDairy Crest Mar 2011 - Dec 2011Gloucestershire, England, United Kingdom• Day to day running of the largest dairy within the group, bottling in excess of 1.3M litres a day. • Increased OEE by 25% through CI and maintenance optimization -
Engineering Project ManagerQuadra Foods Co Jul 2010 - Mar 2011Plymouth, England, United Kingdom• Introduced OEE into the company for measure of performance and improvement. Originally calculated at 45% now 68%. Introduced KPI into Operations • Re-evaluated the Engineering Dept to bring out best performance and utilisation. To include shift changes and T&C’s • Addressed Effluent and production waste problems, confirming savings of £97K per month, as well as an energy saving of £5K per month. This included and digestion system with a CHP plant• Installation of New Compressors -
Interim Engineering ManagerRank Hovis Milling Limited Jan 2010 - Jul 2010Southampton, England, United Kingdom• Day to day running of Maintenance, Facilities and HSE departments• Consulted for Premier Foods group on Preventative Maintenance Strategy, and worked closely with the Group Engineering manager on implementation of changes.• Onsite Energy Assessment to reduce running costs. Reduced Electricity bill by £250Kpa by re-instating Power factoring, Introduction of LED Lighting with IR sensors and balancing optimum voltage, a reduction of 15% in gas usage from installation for lagging of steam, chilled water and external Air lines. -
Reliability EngineerPatheon Aug 2009 - Dec 2009Swindon, England, United Kingdom• Setup of Reliability workshops to ensure production equipment ran at optimum efficiency and reliability, these included all systems such as Washers, fillers, packers, HVAC, Clean Room, WFI, Clean steam, Chillers, Compressed air and water treatment plants. Ran FMEA workshops to mine relevant data. -
Validation And Engineering ConsultantWestfield Medical Limited Jan 2009 - Jun 2009Somerset, England, United Kingdom• Validated all their medical packaging production equipment to ensure conformance with legislation. This included retrospective IQ, OQ, and PQ• Increased productivity by 25% through lean manufacturing techniques• Designed and built modern control systems of bespoke machinery to ensure consistency and also ensure equipment was safe to operate• Audited their Utilities usage and made recommendations for energy saving such as insulating pipe work, new variable speed air compressor, new heating plant. Potential saving of £75Kpa
Frequently Asked Questions about Jennifer Hawkey
What company does Jennifer Hawkey work for?
Jennifer Hawkey works for Weener Plastics Group
What is Jennifer Hawkey's role at the current company?
Jennifer Hawkey's current role is Project Manager.
Not the Jennifer Hawkey you were looking for?
-
jenny hawkey
Bristol -
-
Jennifer Hawkey
Tennessee, United States -
Jenny Hawkey
Northolt
Free Chrome Extension
Find emails, phones & company data instantly
Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Aero Online
Your AI prospecting assistant
Select data to include:
Total price:
$0.00
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial