Jennifer Hawkey

Jennifer Hawkey Email and Phone Number

Project Manager @ Weener Plastics Group
Bacton, GB
Jennifer Hawkey's Location
Bacton, England, United Kingdom, United Kingdom
About Jennifer Hawkey

Jennifer Hawkey is a Project Manager at Weener Plastics Group.

Jennifer Hawkey's Current Company Details
Weener Plastics Group

Weener Plastics Group

View
Project Manager
Bacton, GB
Jennifer Hawkey Work Experience Details
  • Weener Plastics Group
    Project Manager
    Weener Plastics Group
    Bacton, Gb
  • Weener Plastics Group
    Project Manager
    Weener Plastics Group Jan 2024 - Present
    North Walsham, England, United Kingdom
    Overseeing various projects such as machinery installations, chilled water, electrical capacity and energy saving
  • Nestlé Purina Petcare Europe
    Project Manager
    Nestlé Purina Petcare Europe Feb 2023 - Dec 2023
    Wisbech, England, United Kingdom
    Project manager looking after civil and utilities to include feasibility and proposals for a new effluent and boiler house, various building renovations and land redevelopment.
  • Ukaea
    Cmms Project Consultant
    Ukaea Mar 2021 - Dec 2022
    Oxfordshire, England, United Kingdom
    • Consult and aide in the setup an Asset Management Strategy with the Mainsaver CMMS at its core• Improved Maintenance process and visibility through workflow mapping• Developed and delivered CMMS training packages• Project managed exercise verifying assets to develop system hierarchies, standard Nomenclature, and attributes
  • Ipsen
    Reliability Engineer
    Ipsen Oct 2019 - Jan 2021
    • Developed maintenance plans using various reliability methods for several projects including 2 new filling/packaging lines, automated transfer system and compressed Air Systems• Aided in the OQ validation
  • Quorn Foods
    Planning And Scheduling Consultant
    Quorn Foods Aug 2019 - Oct 2019
    • Optimise the planning and scheduling function within the maintenance department• Introduced work packages for preventative maintenance• Trained new Planner and scheduler
  • Smith+Nephew
    Project Engineer
    Smith+Nephew Feb 2019 - Aug 2019
    Hull, England, United Kingdom
    • Research and develop change control for Obsolescence, Improvements and New Product Implementations• ROI savings of £250K
  • Ats Corporation
    Reliability Project Engineer
    Ats Corporation Aug 2018 - Jan 2019
    Toronto, Ontario, Canada
    • Performed maintenance surveys for several clients on fully automated assembly machinery as well as developing Departmental Maintenance Strategies for workflow and critical Spares
  • Predictive Maintenance Services
    Reliability Project Consultant
    Predictive Maintenance Services Apr 2017 - Jul 2018
    Cleveland, Ohio, United States
    • Delivered hard and soft savings of between £75K and £250K for several Pharmaceutical clients in Europe through optimisation of maintenance plans• Optimization of maintenance planning and scheduling through workflow mapping and asset management strategy
  • Genesis Solutions
    Maintenance Project Consultant
    Genesis Solutions Jan 2015 - Apr 2017
    Oslo, Norway
    • Developed maintenance strategies and maintenance plans for multiple clients in Europe• Hard and soft savings of £1.5M through optimisation of maintenance plans• Developed load sheets of over 50K assets for an FLNG ship from technical drawings, developing a system hierarchy as it went• Asset criticality ranking of 150 systems and in turn 30K assets• FMEA of 35 systems• Developed maintenance plans for 25 systems
  • Siemens Healthcare Solutions Diag
    Interim Project Manager
    Siemens Healthcare Solutions Diag Jan 2014 - Jan 2015
    Sudbury, England, United Kingdom
    • Project managed new installation and validation of new process to include a Fermenter, 2xVertical bag fillers and sealers, Chilled Water Plant, Water Purifier upgrades, Air Compressor and 3 ISO8 Cleanrooms with HVAC. Project Value £8M.• Delivered project cradle to grave within time and £1.6M under budget
  • Burts Snacks Ltd
    Interim Project Engineering Manager
    Burts Snacks Ltd Aug 2013 - Dec 2013
    Plymouth, England, United Kingdom
    • Managed and complete 3 major projects to include a new fryer, packaging line and compressor with budgets ranging from £150K to £750K• Performed an Enterprise Asset Management assessment and deliver a strategy for improvement• Identified savings in the region of £750K with ROI of under 1 year• Developed strategies for single point of failure assets
  • Bernard Matthews
    Engineering Project Manager
    Bernard Matthews Jan 2013 - Aug 2013
    Norfolk, England, United Kingdom
    • Manage 5 simultaneous projects ranging from £75K to £1.2M with full budgetary control to includeo Refit of packing Lineo Upgrade Odour Deletero Evisceration line upgradeo Lighting upgradeso New slicing line
  • Genesis Solutions
    Cmms Integration Project Lead
    Genesis Solutions Jun 2012 - Dec 2012
    Dublin, County Dublin, Ireland
    • Developed maintenance strategy for some 2000 asset identified as safety critical on a Tier 2 Comah site in Dublin• Redline exercise of existing systems• Attribute collation of all assets for critical spares analysis• Data standardisation in Maximo of nomenclature, classification, and maintenance• Development of maintenance plans for rotating machinery
  • Tangerine Confectionery
    Interim Engineering Manager
    Tangerine Confectionery Jan 2012 - Jun 2012
    Blackpool, England, United Kingdom
    • Develop and action a departmental strategy, to meet the Business TPM Strategy• Identified Circ £150k annual energy savings for site, and potential £1.5M annual savings for Group• Ran a Waste Lean event identifying £120K savings through trimming waste with a ROI of 3 months• Consulted on developing a Group Engineering management role, and the responsibilities this role should hold.
  • Dairy Crest
    Interim Dairy Engineering Manager
    Dairy Crest Mar 2011 - Dec 2011
    Gloucestershire, England, United Kingdom
    • Day to day running of the largest dairy within the group, bottling in excess of 1.3M litres a day. • Increased OEE by 25% through CI and maintenance optimization
  • Quadra Foods Co
    Engineering Project Manager
    Quadra Foods Co Jul 2010 - Mar 2011
    Plymouth, England, United Kingdom
    • Introduced OEE into the company for measure of performance and improvement. Originally calculated at 45% now 68%. Introduced KPI into Operations • Re-evaluated the Engineering Dept to bring out best performance and utilisation. To include shift changes and T&C’s • Addressed Effluent and production waste problems, confirming savings of £97K per month, as well as an energy saving of £5K per month. This included and digestion system with a CHP plant• Installation of New Compressors
  • Rank Hovis Milling Limited
    Interim Engineering Manager
    Rank Hovis Milling Limited Jan 2010 - Jul 2010
    Southampton, England, United Kingdom
    • Day to day running of Maintenance, Facilities and HSE departments• Consulted for Premier Foods group on Preventative Maintenance Strategy, and worked closely with the Group Engineering manager on implementation of changes.• Onsite Energy Assessment to reduce running costs. Reduced Electricity bill by £250Kpa by re-instating Power factoring, Introduction of LED Lighting with IR sensors and balancing optimum voltage, a reduction of 15% in gas usage from installation for lagging of steam, chilled water and external Air lines.
  • Patheon
    Reliability Engineer
    Patheon Aug 2009 - Dec 2009
    Swindon, England, United Kingdom
    • Setup of Reliability workshops to ensure production equipment ran at optimum efficiency and reliability, these included all systems such as Washers, fillers, packers, HVAC, Clean Room, WFI, Clean steam, Chillers, Compressed air and water treatment plants. Ran FMEA workshops to mine relevant data.
  • Westfield Medical Limited
    Validation And Engineering Consultant
    Westfield Medical Limited Jan 2009 - Jun 2009
    Somerset, England, United Kingdom
    • Validated all their medical packaging production equipment to ensure conformance with legislation. This included retrospective IQ, OQ, and PQ• Increased productivity by 25% through lean manufacturing techniques• Designed and built modern control systems of bespoke machinery to ensure consistency and also ensure equipment was safe to operate• Audited their Utilities usage and made recommendations for energy saving such as insulating pipe work, new variable speed air compressor, new heating plant. Potential saving of £75Kpa

Frequently Asked Questions about Jennifer Hawkey

What company does Jennifer Hawkey work for?

Jennifer Hawkey works for Weener Plastics Group

What is Jennifer Hawkey's role at the current company?

Jennifer Hawkey's current role is Project Manager.

Not the Jennifer Hawkey you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.