Jim Sarver

Jim Sarver Email and Phone Number

JimSarver54@gmail.com @
Jim Sarver's Location
Sandy, Utah, United States, United States
Jim Sarver's Contact Details

Jim Sarver work email

Jim Sarver personal email

n/a
About Jim Sarver

Jim Sarver has extensive experience in project controls, scheduling, analysis, and cost engineering. Jim is proficient in critical path scheduling using Primavera Project Planner, Microsoft Project and Microsoft Office products. As project control manager, Jim trained contract administrators who manage budgets, cost, schedule, change orders, submittals, RFIs and document control. As scheduling engineer, Jim reviewed contractor’s cost loaded baseline schedules; monitored construction progress, performed time impact analysis of changes and provided management with recommendations. Jim has provided project control support to UTA through the planning, environmental, construction and closeout phases. Jim is safety aware and is another eye focused on worker and site conditions while evaluating construction progress.

Jim Sarver's Current Company Details
Retired

Retired

JimSarver54@gmail.com
Jim Sarver Work Experience Details
  • Retired
    Retired
    Retired Sep 2020 - Present
    Utah, United States
    retired
  • Parsons Brinckerhoff
    Project Controls / Contract Administrator
    Parsons Brinckerhoff Sep 2001 - Oct 2014
    Greater Salt Lake City Area
    1997 – 2014 Utah Transit Authority ($3.57B) Employers: KJM and Parsons Brinckerhoff (PB)2009 – 2014 2015 Program expansion ($2.4B)2005 – 2008 Commuter Rail; Ogden to Salt Lake City, UT ($830M) and Hub Connector ($35M) 2000 – 2003 University and Medical Center Light Rail Lines (179M)Provided project control support for UTA light rail and commuter construction projects from the first ground breaking to present. Tasks included: baseline schedule review and monthly schedule update submittal reviews. Supported project risk analysis. Progress evaluation of designers, contractors, consultants and material supplier’s for invoice review and approval. Provided project controls for non-rail capital projects such as vehicle maintenance facilities, intermodal centers, loading docks, parking decks, parking lots and vault expansion. Coordinated four contract administrators on six projects to insure consistent project control program wide for schedule review, change order processing, budget management, ROW procurement and project start-up. Completed change order process from change initiation, estimating, presenting to management, execution, obligations, budget revisions and estimate at complete forecasts. Edited and revised project management plans and procedures. Administered the ProjectSolve collaboration site. Managed the rail, tie and crossing panel procurement contracts. Developed linear schedules. Created cash flow and project percent complete curves. Managed and contributed to monthly reports. Coordinated with the FTA’s Project Management Oversight Contractor to obtain FTA approval of project plans.
  • Kjm & Associates
    Project Scheduler - Project Controls
    Kjm & Associates 1997 - Aug 2001
    Greater Salt Lake City Area
    1997 – 1999 Utah Transit Authority's North/South Light Rail ($305M)
  • Fluor Daniel
    Scheduler
    Fluor Daniel 1993 - 1996
    Salt Lake City, Ut And Carlin, Nv
    1993 - 1996 Kennecott Utah Smelter Upgrade and Newmont Gold repair and upgrade - Fluor Daniel Analyzed and developed schedules and monitored progress on smelter clarifier, pipe racks, acid plant, power plant, casting wheel and smelter furnace overhaul. Developed planned percent complete curves and compared actual progress to the plan. This site was congested and required detailed contractor interface planning between areas and elevations. Developed shutdown schedule for shutdown for mill maintenance, boiler and ductwork repair after a fire.
  • Metropolitan Atlanta Rapid Transit Authority
    Scheduler
    Metropolitan Atlanta Rapid Transit Authority 1988 - 1993
    Scheduling engineer responsible for the review of contractor’s cost loaded baseline schedule, monthly progress updates and schedule delay claims; monitored contract progress; identified scheduling problems and recommended alternatives; created Primavera construction schedules based on design drawings; provided cash flow curves for input into overall MARTA cash flow forecast. Projects included a line segment, tunneling under I-285 and the Indian Creek Station and parking lot
  • Ml-Ferguson
    Beginning Scheduler/Cost Engineer
    Ml-Ferguson 1988 - 1989
    Cleveland, Oh And Cartersville, Ga
    Developed proposal schedules using Artemis software. Cost and resource loaded the schedules to create usage curves. Assistant to chief cost engineer at brewery creating cost codes and revising budgets. Tracked delivery of structural steel. Became area scheduler of bottling/packaging section of the brewery.
  • Various
    Carpenter, Brakeman, Gandydancer, Plumber, Self Employed
    Various 1975 - 1988
    Montana
    Began working as plumbers helper in a hotel remodeling project soldering copper fittings and gluing pipe. Completed a carpenter apprenticeship building schools, a bank, a church, a house and commercial building. Self-employed in concrete basement and flatwork company estimating quantities and pricing projects, hiring and paying help, purchasing and maintaining equipment and pouring concrete. Brakeman/switchman for Burlington Northern railroad switching freight cars in the yard, observing signals and making and routing trains. Gandydancer on tie, sled and section crew replacing ties and tamping ballast.

Jim Sarver Skills

Civil Engineering Contract Management Rail Primavera P6 Construction Project Control Procurement Project Estimation Engineering Process Scheduler Light Rail Analysis Public Transport Project Planning Change Orders Road Cpm Scheduling Budgets Management Stormwater Management Cost Engineering Construction Management Subcontracting Transportation Value Engineering Transportation Planning Cost Management Supervisory Skills

Jim Sarver Education Details

Frequently Asked Questions about Jim Sarver

What company does Jim Sarver work for?

Jim Sarver works for Retired

What is Jim Sarver's role at the current company?

Jim Sarver's current role is JimSarver54@gmail.com.

What is Jim Sarver's email address?

Jim Sarver's email address is jl****@****ast.net

What schools did Jim Sarver attend?

Jim Sarver attended Kennesaw State University, Montana State University-Bozeman, Dawson Community College.

What skills is Jim Sarver known for?

Jim Sarver has skills like Civil Engineering, Contract Management, Rail, Primavera P6, Construction, Project Control, Procurement, Project Estimation, Engineering, Process Scheduler, Light Rail, Analysis.

Not the Jim Sarver you were looking for?

  • Jim Sarver

    Senior Loan Officer | Nmls Id #144473
    Mount Pleasant, Sc
    5
    howardhanna.com, comcast.net, grarate.com, attbi.com, fhmtg.com

    2 +141247XXXXX

  • Jim Sarver

    Successful Sales Leader
    Los Angeles Metropolitan Area
  • Jim Sarver

    President At Jericho Venture Group Inc.
    Buford, Ga
    1
    gmail.com

    1 (407)-5XXXXXXX

  • Jim Sarver

    Ceo At Print Usa Inc
    Greater Phoenix Area
    1
    aol.com

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.