Project Quality Manager
Current Preparation & Review of Quality Assurance Plan of Boiler & turbine package equipments. Inspection of Welding, PWHT, Stress Relieving, Surveillance quality audits at manufacturer’s works as per approved MQP/ITP. Welding Procedure Qualifications & welders’ performance qualifications as per ASME Sec IX, API 1104. Inspection of Static vessels Like Pressure vessels, Heat exchangers ,Condensers,, Heaters, Coolers. Inspection of Rotary Equipments- All types of Horizontal & Vertical Pumps, Fans, Blowers,For BTG & BOP packages. Inspection Of Various Types Structures for Turbines, Boilers, CHP, Solar Power plant Inspection of Boiler & turbine package equipments like Pumps , Valves, Tubes, Pipes, etc Issue the Material Dispatch Clearance after acceptance of material Inspection activities of Protocols for all Boiler, Pressure Parts, Critical Piping- (P-91,P-23, P-22,P-12 & SA 106 GR.B &.C,SA 105 etc,) TG-Axillaries, ESP,AHP,CHP, IBR & Non IBR-Piping like Power Piping (Critical Piping) and Process Piping like CW-Piping, LP-Piping, Fuel Oil & Raw Water Storage tanks, Vessels erection, DM-Plant, Cooling Tower, L.P-Piping, Cooling Tower-Piping , Fire Protection Piping , Ash Handling Piping, Coal Handling Piping, A.C & Ventilation Piping, Compressed Air System, ,Fuel Oil System Piping, Chlorination Plant, Structural works etc and all equipments related in Power Plants Knowledge of International standard & code –ASTM, ASME (SEC –II, V, VIII, IX), API (1104, 5L, 598, 527,510,570,6D, B 31.1, B16.5.B16.47, B16.9 ) & IS,BS & others. Vendor Assessment of Supply of materials for various power plant packages. Pre bidding & Post Bidding activities , attend Kick of Meeting, Minutes of meeting. Carry out ISO 9001:2008 internal audit, Monthly Field audit at various sites.